Less Ads, More Data, More Tools Register for FREE

Pin to quick picksIronveld Regulatory News (IRON)

Share Price Information for Ironveld (IRON)

Share Price is delayed by 15 minutes
Get Live Data
0.021    -0.002 (-8.70%)
Bid:
0.02
Ask:
0.022
Spread: 0.002 (10.00%)
Market Cap: £4.35m
IRON Live PriceLast checked at - London Stock Exchange

Intraday Ironveld Share Chart

Further Increase in Mineral Resource

8 Apr 2013 07:00

RNS Number : 7405B
Ironveld PLC
08 April 2013
 



Ironveld plc ("Ironveld" or the "Company")

Further Increase in JORC compliant Mineral Resource

Highlights

·; Mineral Resource reported in accordance with the JORC Code announced for the Farms Harriets Wish, Aurora and Cracouw

·; Increase in Indicated Mineral Resource to 13.6 million tons of Iron in situ

·; Total Project Mineral Resource increased to 32.2 million tons of Iron in situ

·; Sufficient recoverable Iron in situ to produce one million tons per annum of pig iron for 25 years

Ironveld is pleased to announce that the results of drilling on the farms Harriets Wish, Aurora and Cracouw (collectively known as the "HACRA properties") have yielded results similar to those on the Farm Altona leading to an increase in the Company's overall Mineral Resource to 32.2 million tons of Iron in situ, reported in accordance with the JORC Code. In addition 13.6 million tons of Iron in situ are declared in the Indicated Category.

Drilling Results

The Mineral Resource Estimate was carried out for the Main Magnetite Layer ("MML"), which commonly consists of semi-massive to massive layers of vanadium-bearing titaniferous magnetite ("VTM") near the base of the Upper Zone of the Bushveld Complex. On the HACRA properties the MML consists of a single massive VTM-rich layer underlain by gabbronorite with variable amounts of disseminated VTM.

 

The MML on the HACRA properties was intersected in a total of 34 vertical boreholes and one inclined (45° E) borehole drilled along 13 drill fences. The fence lines were spaced perpendicular to the north-south strike direction at approximately 600 metre intervals.

The drilling on the HACRA properties has increased the overall Mineral Resource base for the Ironveld Project. Mineral Resources are classified as Inferred or Indicated, in terms of the guidelines of the JORC Code. Mineral Resources, as at 28 March 2013, are declared for Fe grades greater than 20% down to a maximum depth of 120 metres below surface, accounting for 2% geological losses due to the anticipated sporadic occurrence of dykes, faults and other disruptive structural features.

 

The overall project Inferred Mineral Resource for the MML and MML with Foot Wall ("FW") are listed in the Table below. Mineral Resources are declared for Fe grades greater than 20% down to a depth of 120 metres.

 

 

 

Indicated Mineral Resources on HACRA, 20% Fe cut-off, as at 28 Mar 2013

 

Layer

Million

Tonnes

Density g/cm3

Fe

%

Fe2O3

%

Fe Metal

Mil Tonnes

TiO2

%

V205

%

SiO2

%

P2O5

%

S

%

MML

12.12

4.31

48.1

68.8

5.83

14.5

1.14

6.0

0.01

0.05

FW

6.25

3.15

21.2

30.3

1.32

3.4

0.30

34.1

0.02

0.28

MML with FW

18.37

3.92

38.9

55.7

7.15

10.7

0.85

15.6

0.01

0.13

 

Inferred Mineral Resource on HACRA, 20% Fe cut-off, as at 28 Mar 2013

 

Layer

Million

Tonnes

Density g/cm3

Fe

%

Fe2O3

%

Fe Metal

Mil Tonnes

TiO2

%

V205

%

SiO2

%

P2O5

%

S

%

MML

6.31

4.45

50.1

71.7

3.16

15.4

1.21

4.2

0.01

0.03

FW

0.22

3.05

20.1

28.8

0.05

2.1

0.27

36.2

0.01

0.03

MML with FW

6.53

4.40

49.1

70.2

3.21

15.0

1.18

5.3

0.01

0.03

 

 

 

 

 

 

 

 

MML Mineral Resources for the Ironveld Project, 20% Fe cut-off, as at 28 Mar 2013

Farm

Name

Cut Off

Fe%

Million

Tonnes

SG

g/cm3

Fe

%

Fe2O3

%

Fe Metal

Mil Tonnes

TiO2

%

V205

%

SiO2

%

P2O5

%

S

%

Indicated Mineral Resources

Altona

20

10.27

4.51

51.1

73.0

5.25

15.6

1.13

3.9

0.01

0.11

HACRA

20

12.12

4.31

48.1

68.8

5.83

14.5

1.14

6

0.01

0.05

Total Indicated

20

22.39

4.40

49.5

70.7

11.08

15.00

1.14

5.01

0.01

0.08

Inferred Mineral Resources

Nonnenwerth

20

21.69

4.03

42.5

60.8

9.22

13.1

1.00

11.1

0.01

0.10

La Pucella

20

6.83

4.30

47.8

68.3

3.30

14.7

1.11

7.0

0.01

0.11

Altona

20

0.49

4.51

51.3

73.3

0.25

15.2

1.02

4.05

0.01

0.03

HACRA

20

6.31

4.45

50.1

71.7

3.16

15.4

1.21

4.2

0.01

0.03

Total Inferred

20

35.32

4.16

45.0

64.4

15.93

13.8

1.06

9.0

0.01

0.09

Indicated and Inferred Mineral Resources

Project Total

20

57.71

4.26

46.7

66.8

27.01

14.3

1.09

7.4

0.01

0.08

 

 

 

 

 

 

MML with FW Mineral Resources for the Ironveld Project, 0% Fe cut-off, as at 28 Mar 2013

Farm

Name

Cut Off

Fe%

Million

Tonnes

SG

g/cm3

Fe

%

Fe2O3

%

Fe Metal

Mil Tonnes

TiO2

%

V205

%

SiO2

%

P2O5

%

S

%

Indicated Mineral Resources

Altona

20

15.70

4.05

41.1

58.8

6.45

11.3

0.84

14.4

0.01

0.13

HACRA

20

18.37

3.92

38.9

55.7

7.15

10.7

0.85

15.6

0.01

0.13

Total Indicated

20

34.07

3.98

39.1

57.1

13.60

11.0

0.85

15.1

0.01

0.13

Inferred Mineral Resources

Nonnenwerth

20

32.90

3.68

34.8

49.8

11.46

9.8

0.80

19.6

0.01

0.10

La Pucella

20

9.44

3.81

37.5

53.7

3.50

10.0

0.79

18.0

0.01

0.13

Altona

20

1.07

3.84

35.4

50.6

0.38

8.7

0.63

21.0

0.02

0.19

HACRA

20

6.53

4.4

49.1

70.2

3.21

15.0

1.18

5.30

0.01

0.03

Total Inferred

20

49.94

3.80

37.2

53.2

18.55

10.5

0.84

17.5

0.01

0.10

Indicated and Inferred Mineral Resources

Project Total

20

84.01

3.87

38.3

54.8

32.15

10.7

0.85

16.5

0.01

0.11

 

 

Commenting on the results, Peter Cox, CEO of Ironveld said: "Based on the previously announced recoveries achieved in test work at Mintek, the results from the HACRA properties, which show a similar grade to Altona, have enabled the Company to achieve its target of a mineral resource with potential for the production of one million tons per annum of pig iron for 25 years. In addition, a VTM-rich zone indicated by limited drilling and distinct aeromagnetic anomalies to the west of the MML on the HACRA properties, will be followed up with further drilling, as it may add mineralisation to the Ironveld Project. 

The Company is currently focussed on an in-fill drill programme across the license area with the present drilling on the farm Nonnenwerth aimed at increasing the mineral resource category to Indicated status. Work to apply for a mining right on the HACRA properties is now in progress. In addition, it is expected that the results of the pre-feasibility study on the Pig Iron Project will be announced shortly."

The Mineral Resource Estimate has been prepared under the supervision of Mr. Jeremy Witley and the Report was reviewed by Dr Frieder Reichhardt, both of The MSA Group. Jeremy Witley and Frieder Reichhardt have the appropriate relevant qualifications, experience, competence and independence to be considered "Competent Person" under the definitions provided in the JORC code, 2012 Edition.

 

For further information, please contact:

Ironveld plc

Peter Cox, Chief Executive

c/o FTI Consulting

 020 7269 7183

 

 

Shore Capital and Corporate Limited

020 7408 4090

Stephane Auton / Toby Gibbs (corporate finance)

 

Jerry Keen (corporate broking)

 

 

 

F T I Consulting

020 7269 7157

Oliver Winters / Katherine Goligher

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGUMWCUPWGQA
Date   Source Headline
15th May 20263:34 pmRNSTR-1: Notification of major holdings
29th Apr 202612:50 pmRNSResult of Annual General Meeting
29th Apr 20267:13 amRNSOperational Update
1st Apr 20267:00 amRNSPosting of Notice of Annual General Meeting
31st Mar 20266:25 pmRNSResults of Accelerated Bookbuild
31st Mar 20261:44 pmRNSLaunch of Accelerated Book Build
31st Mar 20267:30 amRNSRestoration - Ironveld PLC
31st Mar 20267:02 amRNSOperational Update – Daemaneng Operational Restart
31st Mar 20267:01 amRNSInterim Results for the 6 Months Ended 31 Dec 2025
31st Mar 20267:00 amRNSFinancial Results for the Year Ended 30 June 2025
25th Mar 202612:26 pmRNSUpdate on Publication of FY25 Accounts
16th Mar 202611:37 amRNSUpdate on Publication of FY25 Accounts
16th Mar 202611:37 amRNSUpdate on Publication of FY25 Accounts
2nd Mar 20262:50 pmRNSOperations Update & Publication of FY25 Accounts
3rd Feb 20265:34 pmRNSOperations Update & Publication of FY25 Accounts
2nd Jan 20267:30 amRNSSuspension - Ironveld PLC
2nd Jan 20267:30 amRNSSuspension - Ironveld PLC
23rd Dec 20253:39 pmRNSOperational Update & Delay to Accounts Publication
23rd Dec 20253:39 pmRNSOperational Update & Delay to Accounts Publication
1st Dec 20257:00 amRNSTR-1: Notification of major holdings
11th Nov 20257:00 amRNS-ROperational Progress Update
30th Oct 20254:55 pmRNSIronveld PLC Sign Binding Term Sheet
14th Oct 20257:17 amRNSDirector Dealing
7th Oct 202511:15 amRNSResult of Annual General Meeting
7th Oct 20257:07 amRNSIronveld PLC Signs Mining Operations Agreement
10th Sep 20257:00 amRNSNotice of AGM and Change of Registered Office
5th Aug 202510:14 amRNSTR-1: Notification of major holdings
30th Jun 20254:57 pmRNSChange of Registered Office Address
25th Jun 20257:00 amRNSTR-1: Notification of major holdings
19th Jun 20257:00 amRNSResignation of Director
16th Jun 202512:46 pmRNSTR-1: Notification of major holdings
11th Jun 20257:00 amRNS£900k Placing to Ramp Up Production
6th Jun 202512:37 pmRNS-RPost-Blast Imagery and DMS Plant Visuals Released
6th Jun 20257:00 amRNSOperational Update
2nd Jun 20257:00 amRNSTR-1: Notification of major holdings
30th May 20257:02 amRNSTR-1: Notification of major holdings
30th May 20257:01 amRNSTR-1: Notification of major holdings
30th May 20257:00 amRNSTR-1: Notification of major holdings
22nd May 20258:00 amRNSOperational Update
30th Apr 20257:00 amRNSChange of Registered Office Address
23rd Apr 20257:00 amRNSBlocklisting Return
16th Apr 202511:40 amRNSTR-1: Notification of major holdings
1st Apr 20257:30 amRNSRestoration - Ironveld Plc
1st Apr 20257:00 amRNSFinal Results for the year ended 30 June 2024
1st Apr 20257:00 amRNSInterim results for the 6 months ended 31 Dec 2024
6th Mar 20255:18 pmRNSOperational Update
12th Feb 20257:00 amRNSOperational Update
2nd Jan 20257:30 amRNSSuspension - Ironveld plc
18th Dec 20243:40 pmRNSDelay to the Publication of Audited Accounts
11th Dec 20242:03 pmRNSTR-1: Notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.