Operational Update

29 Mar 2022 07:00

RNS Number : 3111G
IOG PLC
29 March 2022
 

29 March 2022

 

IOG plc

 

Operational Update

 

IOG plc ("IOG", or "the Company"), (AIM: IOG.L), the Net Zero UK gas and infrastructure operator focused on high return projects, provides a preliminary update on Phase 1 production and progress with the resumption of Southwark drilling.

 

Blythe & Elgood Fields

 

The Blythe and Elgood fields are produced via the normally unmanned Blythe platform which is connected via a 12" line to the main 24" Saturn Banks Pipeline System that feeds into the associated Saturn Banks Reception Facilities at Bacton terminal.

 

Since Blythe and Elgood were brought onstream on 13 and 15 March respectively, reservoir performance has been within range of the Company's expectations based on the data from the initial clean-up flow tests from 2021. Over the past week, the Elgood well has flowed continuously at a stable rate in excess of 50 mmscf/d. Blythe has also flowed at rates in excess of 40 mmscf/d. These initial indications are not intended as production guidance. As previously indicated, the Company intends to analyse reservoir and facilities performance data over the initial months of production to inform an annual production guidance range.

 

As is normal in the start-up phase of an offshore project, some initial mechanical issues have caused interruptions to early production. The Company has made allowances for facilities downtime periods in its internal planning and financial forecasts.

 

Currently, a chemical injection fault has necessitated the Blythe well to be temporarily shut in. The solution is planned to be implemented this week, enabling Blythe to resume production immediately thereafter. This issue is not affecting Elgood production which has continued in the meantime.

 

Southwark Field

 

The rock dumping required to provide a stable seabed for the return of the Noble Hans Deul jack-up drilling rig is expected to be completed today. Consequently, return of the rig to the Southwark field location is targeted for next week with a view to a safe resumption of drilling by mid-April. First Gas from Southwark is now expected to be in Q4 2022. Given the nature of the seabed scour issue, contractually the costs associated with the delay since early January will fall predominantly on the licence holders (IOG and its 50:50 joint venture partner CalEnergy Resources (UK) Limited). Whilst these additional shared costs are not covered under the standard insurance packages in place, they are expected to be covered by available cash resources.

 

Andrew Hockey, CEO of IOG, commented: 

 

"Early reservoir performance indicates flow rates at Blythe and Elgood are in a similar range to the clean-up flow tests, which is encouraging. Elgood is producing steadily at over 50 mmscf/d. We have experienced some early mechanical issues on the Blythe platform, as may be expected during the start-up phase. We expect to resolve a chemical injection issue on the platform this week so that we can establish stable flow from both wells. In parallel, we are pleased to continue our progress towards a safe resumption of drilling at Southwark by mid-April."

 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the company's obligations under Article 17 of MAR.

 

Enquiries:

 

IOG plc

Andrew Hockey (CEO)

Rupert Newall (CFO)

James Chance (Head of Capital Markets & ESG)

 

+44 (0) 20 7036 1400

finnCap Ltd

Christopher Raggett / Simon Hicks

 

+44 (0) 20 7220 0500

Peel Hunt LLP

Richard Crichton / David McKeown

+44 (0) 20 7418 8900

Vigo Consulting

Patrick d'Ancona / Finlay Thomson / Oliver Clark

 

+44 (0) 20 7390 0230

About IOG:

 

IOG is a Net Zero UK gas and infrastructure operator focused on high-return projects. The Company's operations are currently concentrated around its offshore and onshore Saturn Banks infrastructure in the UK Southern North Sea. Phase 1 of its Saturn Banks Project, which started production in March 2022, entails the commercialisation of the Blythe, Elgood and Southwark gas fields through this infrastructure. Phase 2 of the Saturn Banks Project entails the Nailsworth, Goddard and Elland gas discoveries, which are subject to future investment decisions and expected to be commercialised through the same export infrastructure. The Company also holds further licences with additional assets including the Abbeydale, Panther and Grafton gas discoveries, the Kelham North, Kelham Central, Thornbridge and Thornbridge Deep prospects, and part of the Orrell gas discovery. Currently, all IOG's licences are held 50:50 with its joint venture partner CalEnergy Resources (UK) Limited and operated by IOG. In addition, the Company continually evaluates further opportunities for accretive portfolio additions to help generate additional shareholder returns. Further details are available at www.iog.co.uk.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBVLLLLXLBBBD
Date   Source Headline
21st Mar 20199:23 amRNSForm 8.5 (EPT/RI)
20th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
20th Mar 20199:15 amRNSForm 8.5 (EPT/RI)
19th Mar 20196:35 pmRNSForm 8 (OPD) Independent Oil and Gas plc
19th Mar 20193:36 pmRNSForm 8.3 - Independent Oil & Gas PLC
19th Mar 20193:13 pmRNSForm 8.3 - Independent Oil & Gas Ltd
19th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
19th Mar 201910:00 amRNSForm 8.5 (EPT/RI)
19th Mar 20197:05 amRNSLondon Oil & Gas Limited Update
18th Mar 20195:45 pmRNSForm 8.3 - Independent Oil & Gas plc
18th Mar 20191:50 pmRNSForm 8.3 - Independent Oil & Gas PLC
18th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil & Gas PLC
18th Mar 201911:38 amRNSForm 8.5 (EPT/RI)
15th Mar 20195:52 pmRNSForm 8.3 - RJM Energy Ltd
15th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas Plc
15th Mar 201911:30 amRNSForm 8.5 (EPT/RI)
14th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas Plc
14th Mar 201911:30 amRNSForm 8.5 (EPT/RI)
14th Mar 20197:00 amRNSAppointment of Senior Independent NED
13th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas Plc
12th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas Plc
12th Mar 201911:30 amRNSForm 8.5 (EPT/RI)
11th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
11th Mar 201910:38 amRNSForm 8.5 (EPT/RI)
11th Mar 20199:56 amRNSForm 8.5 (EPT/RI) Amendment
8th Mar 20194:48 pmRNSForm 8.3 - Independent Oil & Gas
8th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
8th Mar 20199:54 amRNSForm 8.5 (EPT/RI)
7th Mar 20194:49 pmRNSForm 8.3 - Independent Oil & Gas
7th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
7th Mar 20199:50 amRNSForm 8.5 (EPT/RI)
6th Mar 201912:00 pmRNSForm 8.5 (EPT/RI) - Independent Oil and Gas PLC
6th Mar 201910:34 amRNSForm 8.5 (EPT/RI)
6th Mar 20199:16 amRNSForm 8 (DD) - Independent Oil & Gas Plc
5th Mar 20195:11 pmRNSRule 2.9 Announcement
5th Mar 20194:27 pmRNSRejection of proposal from RockRose Energy plc
5th Mar 201912:00 pmRNSPossible Offer for Independent Oil and Gas plc
25th Feb 20197:00 amRNSProject & Funding Update
8th Jan 20197:00 amRNSSNS Core Project Upgrade
4th Jan 20197:00 amRNSUpdate on London Oil and Gas loan facilities
18th Dec 20187:00 amRNSDirectorate Change
6th Dec 20184:28 pmRNSIssue of New Shares and Director Shareholding
3rd Dec 201812:20 pmRNSConversion of Salaries/Fees into Share Options
29th Nov 20187:00 amRNSSNS Project and Harvey Update
15th Oct 20187:43 amRNSGoddard CPR Update
2nd Oct 20187:00 amRNSIssue of New Shares
27th Sep 20187:00 amRNSInterim Results
25th Sep 20187:00 amRNSPipeline Integrity Confirmation & Project Update
14th Sep 20187:00 amRNSHarvey Funding Update
17th Aug 20187:00 amRNSHarvey Appraisal Well Funding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.