Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHorizonte Minerals Regulatory News (HZM)

Share Price Information for Horizonte Minerals (HZM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.025 (8.33%)
Spread: 0.05 (16.667%)
Open: 0.30
High: 0.325
Low: 0.30
Prev. Close: 0.30
HZM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Araguaia Nickel Drilling Update

21 Jul 2011 07:00

RNS Number : 7619K
Horizonte Minerals PLC
21 July 2011
 



Horizonte Minerals plc / Index: AIM / Epic: HZM / Sector: Mining

21 July 2011

Horizonte Minerals plc ('Horizonte' or 'the Company')

Drilling Results Continue to Generate High Grade Nickel Intercepts at the Araguaia Project, Brazil - 2.25% Ni over 17.3 metres

 

Horizonte, the AIM and TSX quoted exploration and development company focused in Brazil, announces further positive results from the infill resource drilling programme at its 100% owned Araguaia Nickel project ('Araguaia') in Para Sate, north central Brazil. 

 

Highlights

 

·; Best intersection of 2.25% nickel ('Ni') over 17.3 metres from infill drilling at Pequizeiro target

·; Other high grade intersections include:

o 15.6 metres grading 1.97% Ni,

o 13.8 metres grading 1.96% Ni

o 19.6 metres grading 1.84% Ni 

·; 327 drill holes totalling 8,364 metres completed to date in the 20,000 metre drilling programme

·; Resource drilling programme on target to deliver resource update in Q4 2011

·; Wardell-Armstrong appointed to complete a Preliminary Economic Assessment by end of Q1 2012

·; Second drilling contractor, Boart Longyear, commenced drilling in May 2011 - currently a total of six drilling rigs are in operation

 

Horizonte CEO Jeremy Martin said, "These ongoing results are excellent. We have numerous high grade intersections which will add greatly to the upcoming revised mineral resource estimate due in Q4 2011. Wardell-Armstrong International has been appointed to undertake the Preliminary Economic Assessment of the project and all elements, additional drill rigs, metallurgical test-work, environment and community relations which are required for this study are in place. The Araguaia asset is undervalued relative to its peers and we hope with these ongoing developments that its true worth becomes realised by the market."

 

Further Details

 

The results in this news release have been collated from the on-going 20,000 metre drilling programme that commenced in October 2010. The results from a total of 50 drill holes (1537.69 metres) from the 100 metres x 100 metres infill drilling completed on the Pequizeiro Main zone are detailed in Table 1 and the results from a total of 15 drill holes (539.35 metres) from the 100 metres x 100 metres block of 25 metres spaced holes on the Pequizeiro target are detailed in Table 2 (see location map on http://horizonteminerals.com/project_maps). The data from the 25 metres x 25 metres drilling will be used to measure short-range variability in the mineralisation for the construction of semi-variograms for future mineral resource estimation.

 

The results include a notable wide, high-grade intersection of 17.3 metres grading 2.25% nickel (Hole PCA-DD-0599). Additional high-grade zones also include 15.6 metres grading 1.97% nickel (Hole PCA-DD-0603), 13.8 metres grading 1.96% nickel (PCA-DD-0587) and 19.6 metres grading 1.84% nickel (PCA-DD-0621).

 

On the Baião target 141 metres x 141 metres infill drilling has been completed totalling 82 holes. The 100 metres x 100 metres infill drilling has commenced; to date 22 holes have been completed.

 

On the Vila Oito East target 141 metres x 141 metres infill drilling has commenced with a total of 17 holes completed to date.

 

Drilling has also commenced on infill drilling on the Lontra targets. To date 33 holes have been completed.

 

 

Table 1. Pequizeiro Drilling Programme

Intercepts ≥1% Ni cut-off

(Holes PCA-DD-0585, PCA-DD-0587 to PCA-DD-0634

& PCA-DD-0641)

Hole

From (m)

To (m)

Width (m)

Ni %

Co %

PCA-DD-0585

11.82

22.48

10.66

1.66

0.06

PCA-DD-0587

11.05

24.83

13.78

1.96

0.04

PCA-DD-0588

8.66

12.02

3.36

1.54

0.10

PCA-DD-0589

0.29

17.58

17.29

1.88

0.06

PCA-DD-0590

3.67

16.83

13.16

1.86

0.05

PCA-DD-0591

7.77

18.43

10.66

1.72

0.05

PCA-DD-0592

3.23

14.08

10.85

1.72

0.05

PCA-DD-0593

5.26

15.76

10.50

1.52

0.03

PCA-DD-0594

3.79

11.17

7.38

1.93

0.09

PCA-DD-0595

NSI

PCA-DD-0596

3.50

6.53

3.03

1.47

0.08

PCA-DD-0597

5.15

21.36

16.21

1.64

0.05

PCA-DD-0598

9.78

18.10

8.32

1.61

0.04

PCA-DD-0599

5.61

22.93

17.32

2.25

0.05

PCA-DD-0600

3.06

6.50

3.44

1.32

0.09

PCA-DD-0601

5.01

10.46

5.45

1.23

0.03

PCA-DD-0602

8.39

29.29

20.90

1.92

0.04

PCA-DD-0603

11.41

26.98

15.57

1.97

0.05

PCA-DD-0604

NSI

PCA-DD-0605

5.11

7.24

2.13

1.12

0.10

PCA-DD-0606

9.38

25.27

15.89

1.50

0.04

PCA-DD-0607

5.03

22.31

17.28

1.78

0.08

PCA-DD-0608

11.70

25.70

14.00

1.64

0.06

PCA-DD-0609

12.78

23.12

10.34

1.69

0.04

PCA-DD-0610

21.66

24.44

2.78

1.13

0.09

PCA-DD-0611

10.81

29.38

18.57

1.51

0.07

PCA-DD-0612

5.40

20.40

15.00

1.68

0.08

PCA-DD-0613

3.35

15.26

11.91

1.35

0.08

PCA-DD-0614

15.19

30.21

15.02

1.59

0.05

PCA-DD-0615

8.44

24.83

16.39

1.51

0.07

PCA-DD-0616

17.17

26.72

9.55

1.71

0.04

PCA-DD-0617

9.98

24.65

14.67

1.77

0.08

PCA-DD-0618

4.76

9.01

4.25

1.17

0.07

PCA-DD-0619

3.91

5.94

2.03

1.03

0.09

PCA-DD-0620

6.67

12.83

6.16

1.70

0.07

&

18.39

21.98

3.59

1.26

0.07

PCA-DD-0621

10.47

30.03

19.56

1.84

0.05

PCA-DD-0622

5.18

9.13

3.95

1.29

0.09

PCA-DD-0623

6.44

21.62

15.18

1.77

0.06

PCA-DD-0624

4.97

10.10

5.13

1.23

0.13

PCA-DD-0625

NSI

PCA-DD-0626

1.20

14.41

13.21

1.55

0.04

PCA-DD-0627

11.30

27.29

15.99

1.84

0.08

&

30.54

32.83

2.29

1.11

0.02

PCA-DD-0628

8.25

27.75

19.50

1.76

0.05

PCA-DD-0629

7.93

21.25

13.32

1.63

0.04

PCA-DD-0630

6.40

10.45

4.05

1.09

0.03

&

13.38

17.07

3.69

1.16

0.05

PCA-DD-0631

5.24

11.24

6.00

1.31

0.05

&

13.25

16.45

3.20

1.15

0.02

PCA-DD-0632

5.25

7.30

2.05

1.92

0.06

&

10.52

18.77

8.25

1.69

0.04

PCA-DD-0633

6.54

20.22

13.68

1.50

0.04

PCA-DD-0634

21.23

34.21

12.98

1.32

0.06

PCA-DD-0641

13.86

28.36

14.50

1.88

0.05

 

 

Table 2. Pequizeiro Drilling Programme

25m x 25m spaced drilling in 100m x 100m block

Intercepts ≥1% Ni cut-off

(Holes PCA-DD-0636V to PCA-DD-0640V;

PCA-DD-0645V to PCA-DD-0650V;

PCA-DD-0652V to PCA-DD-0654V & PCA-DD-0657V)

Hole

From (m)

To (m)

Width (m)

Ni %

Co %

PCA-DD-0636V

9.46

15.51

6.05

1.60

0.05

PCA-DD-0637V

11.37

25.36

13.99

1.60

0.06

PCA-DD-0638V

9.30

25.92

15.20

1.84

0.05

PCA-DD-0639V

13.60

23.76

10.16

1.55

0.04

PCA-DD-0640V

9.67

19.33

9.66

1.79

0.04

PCA-DD-0645V

11.70

25.81

14.11

2.00

0.05

PCA-DD-0646V

6.72

21.78

15.06

1.76

0.06

&

25.43

27.91

2.48

1.61

0.03

PCA-DD-0647V

10.13

19.92

9.79

1.52

0.06

PCA-DD-0648V

11.19

19.34

8.15

1.44

0.05

PCA-DD-0649V

8.89

21.61

12.72

1.62

0.05

PCA-DD-0650V

6.03

16.16

10.13

1.70

0.05

PCA-DD-0652V

9.00

18.50

9.50

1.47

0.05

PCA-DD-0653V

8.73

18.32

9.59

1.38

0.04

PCA-DD-0654V

7.98

19.11

11.13

1.54

0.06

PCA-DD-0657V

6.91

19.91

13.00

1.72

0.05

 NSI: No significant intersection

 

The compositing of the nickel grades in the individual holes was completed across geological boundaries using a nickel cut-off of 1% with a minimum intercept length of two metres and a maximum length of internal waste of two meters. Weighted averages were calculated using double weighting i.e. individual samples were weighted against both length and bulk density. As the nickel laterite deposits are essentially flat-lying, all widths given are true widths.

 

Sample preparation and analyses

 

Samples from the Pequizeiro drill cores were crushed and pulverised at the SGS laboratory in Goiania and the resultant pulps analysed at SGS laboratory in Belo Horizonte using tetraborate fusion X-Ray Fluorescence ('XRF'). Full QA/QC procedures were implemented, including the insertion of standards, duplicates and blanks. Check samples representing approximately 5% of all the samples will be sent to another international laboratory for analysis by XRF.

 

Horizonte Minerals prepared this news release and Dr. Marc-Antoine Audet P.Geo., an independent consulting geologist and a Qualified Person under National Instrument 43-101, reviewed and approved the technical information.

 

* * ENDS * *

 

For further information visit www.horizonteminerals.com or contact:

 

Jeremy Martin

Horizonte Minerals plc

Tel: +44 (0) 20 7763 7157

David Hall

Horizonte Minerals plc

Tel: +44 (0) 20 7763 7157

Dominic Morley

Panmure Gordon (UK) Limited

(Nomad and Broker)

Tel: +44 (0) 20 7459 3600

Katherine Roe

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7459 3600

Hannah Woodley

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7459 3600

Joanna Weaving

finnCap Ltd (Joint Broker)

Tel: +44 (0) 20 7600 1658

Matthew Robinson

finnCap Ltd

Tel: +44 (0) 20 7600 1658

Ben Thompson

finnCap Ltd

Tel: +44 (0) 20 7600 1658

Felicity Edwards

St Brides Media & Finance Ltd (PR)

Tel: +44 (0) 20 7236 1177

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

Notes

 

Horizonte Minerals plc is an AIM quoted exploration and development company with a portfolio of nickel and gold projects in the Carajas District of Brazil. The Company is focused on creating value by generating and rapidly advancing exploration projects in tandem with joint ventures with major mining companies, providing mid-term cash flow which is then used to develop the business and pipeline projects.

 

Horizonte has two committed major mining partners: Teck Resources Limited, a major strategic shareholder in the Company, and AngloGold Ashanti Limited, a JV partner on the gold portfolio.

 

Horizonte owns 100 per cent of the advanced Araguaia nickel project located to the south of the Carajas mineral district of northern Brazil; the project has the potential to deliver a resource with size and grades comparable to other world-class projects in northern Brazil

 

In addition Horizonte recently acquired the Lara Exploration Vila Oito project which has a non compliant potential resource of 10 to 11 Mt grading 1.3 to 1.4% Ni further consolidating the greater Araguaia district.

 

Horizonte is well funded to accelerate the development of its core projects.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASXEAADFEFF
Date   Source Headline
1st May 20247:00 amRNSCorporate Update
15th Apr 20247:00 amRNSCorporate Update
2nd Apr 20247:00 amRNSCorporate Update
28th Mar 20241:39 pmRNSCorporate Update
14th Mar 20244:40 pmRNSAraguaia Project Update
1st Mar 20247:00 amRNSCorporate Update
23rd Feb 202410:52 amRNSHolding(s) in Company
19th Feb 20244:53 pmRNSUpdated Capex and Schedule Estimate
18th Jan 20244:57 pmRNSAPPOINTMENT OF NICHOLAS MICHAEL TO THE BOARD
10th Jan 20245:35 pmRNSTR-1: Standard notification of major holdings
27th Dec 20237:00 amRNSINTERIM US$20M FUNDING PACKAGE SIGNED
19th Dec 20232:32 pmRNSARAGUAIA PROJECT UPDATE
18th Dec 20235:55 pmRNSAPPOINTMENT OF BOARD MEMBERS
27th Nov 20237:00 amRNSBOARD AND MANAGEMENT CHANGES
14th Nov 20238:02 amRNSARAGUAIA PROJECT UPDATE
23rd Oct 20237:00 amRNSQ3 2023 Construction Update
12th Oct 20237:00 amRNSHolding(s) in Company
5th Oct 20237:00 amRNSHolding(s) in Company
2nd Oct 20237:00 amRNSUpdate on Araguaia Nickel Project Construction
14th Sep 20231:00 pmRNSEXERCISE OF OPTIONS AND TOTAL VOTING RIGHTS
12th Sep 20237:00 amRNSPASSING OF FORMER CHAIR AND CO-FOUNDER
24th Aug 20237:00 amRNSOperations Director Appointed for Araguaia Project
17th Aug 20237:00 amRNSInterim Financial Results
3rd Aug 20237:00 amRNSQ2 2023 Araguaia Construction Update
2nd Aug 20237:00 amRNSNotice of Investor Presentation
27th Jul 20233:00 pmRNSExercise of Options and Total Voting Rights
25th Jul 20237:00 amRNSAPPOINTMENT OF JOINT CORPORATE BROKER
13th Jul 20237:00 amRNSAward of Options
11th Jul 20237:00 amRNSBoard Appointments
7th Jul 202311:03 amRNSHolding(s) in Company
6th Jul 20237:00 amRNSMINING APPROVAL RECEIVED FOR ARAGUAIA
29th Jun 20237:00 amRNSDELIVERY OF ROTARY KILN
15th Jun 20237:00 amRNSAraguaia Nickel Project Pictorial Update
24th May 20234:37 pmRNSResult of AGM
24th May 20237:00 amRNSHORIZONTE MINERALS PLC 2022 SUSTAINABILITY REPORT
23rd May 20234:05 pmRNSTR-1: Notification of Major Holdings
23rd May 20234:01 pmRNSTR-1: Notification of Major Holdings
28th Apr 20237:00 amRNSNotice of AGM
24th Apr 20237:00 amRNSAraguaia Construction Update
19th Apr 20237:00 amRNSNotice of Investor Presentation
31st Mar 20234:07 pmRNSExercise of Options and Total Voting Rights
29th Mar 20237:00 amRNSFINAL RESULTS FOR THE YEAR ENDED 31 DECEMBER 2022
6th Mar 20237:00 amRNSAraguaia Line2 Feasibility Study Contracts Awarded
27th Feb 20237:00 amRNSSecond drawdown complete
24th Feb 20239:04 amRNSTR-1: Notification of Major Holdings
16th Feb 20237:00 amRNSHORIZONTE MINERALS PICTORIAL UPDATE
9th Feb 20237:00 amRNSMining Services Contract Awarded for Araguaia
8th Feb 20234:31 pmRNSTR-1: Notification of Major Holdings
24th Jan 20237:00 amRNSVermelho Nickel Cobalt Project EIA Submitted
21st Dec 20227:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.