Unaudited Results for Six Months To 30 Jun 2013

26 Mar 2014 07:00

RNS Number : 1867D
Hightex Group PLC
26 March 2014
 

 

 

 

 

Hightex Group plc

 

 ("Hightex" or "the Group")

 

Unaudited Results for the Six Months Ended 30 June 2013

 

 

Hightex Group plc (AIM: HTIG), a leading systems engineering company, which designs, fabricates and installs large area, cable supported lightweight membrane roofs and façades worldwide, announces its unaudited results for the six months ended 30 June 2013.

 

Financial Overview:

· Turnover of €3.4 million (H1 2012: €7.9 million)

· Gross profit down 55% to €0.5 million (H1 2012: €1.1 million)

· Overheads (actual) down 14% to €1.4 million (H1 2012: €1.6 million) (excluding the change in net currency gains and losses of €189,000)

· Pre-tax loss of €1.5 million (H1 2012: loss of €1.0 million)

· Result per share - loss of 0.53c (H1 2012: loss of 0.35c)

· Net cash balances of €0.7 million (H1 2012: €1.0 million)

 

Operational Highlights:

· The installation of the roof of the Maracana Stadium in Rio de Janeiro, Brazil was completed in May 2013. Work on the Estadio Beira-Rio in Porto Alegre, Brazil made good progress. These two contracts contributed most of the first half revenues.

· Hightex accounted for further revenues from Natal project of € 0.5 million.

· Hightex is actively pursuing other potential significant contracts, in the United Kingdom, North America and Europe.

 

Post Balance Sheet Event and Prospects:

· Difficulties in obtaining financial information from its Brazilian joint venture SEPA Hightex Coberturas Ltda. triggered material uncertainty over Brazilian receivables. Directors concluded to not be in a position to issue interim results for the six months period ended 30 June 2013 resulting in a suspension from trading at AIM effective from 26 September 2013.

· Lacking verifiable information, Hightex has accounted for a provision on respective receivables. The provision will be clarified following further discussion with the Company's auditors. The unwelcome consequences of this situation were difficulties in Hightex's working capital. Reference is made to Note 3 "Going Concern" of the interim financial statements.

· On October 2nd 2013 SolarNext announced it had raised €255,000 by way of a short term loan secured over 39.2% of the share capital of SolarNext. In December 2013 Hightex sold 30.6% of SolarNext for €397,000 and the terms of the original short term loan were varied resulting in the transfer to the lenders of 19.6% of the shares in SolarNext. In aggregate, 50.2% of SolarNext was sold to a number of UK investors, including management.

· Closing a loan facility with TCA Global Credit Master Fund, LP for up to USD 10,000,000 in March 2014.

· At operational level all three contracts in Brazil (Maracana Stadium, Estadio Beira-Rio and Natal) have been executed and will be ready for the World cup in 2014.

· Further the construction of the Prince Sultan Cultural Center in Riyadh, Saudi Arabia, had been halted in 2013, however a new contract is now under negotiation.

· Signed contracts to date delivered aggregate revenues of €6.7 million in the second half of 2013. Further significant contracts being pursued are expected to deliver revenues in 2014.

· Because of lower than expected SolarNext revenues in the first half year, and disappointing sales in the second half of 2013 resulting from political uncertainty on the governmental energy policy in Germany, SolarNext incurred a loss in 2013 and aims to achieve profitability in 2014.

· Hightex has submitted a number of offers in response to tender requests for projects where membrane is an essential part of the total structure. The Directors believe that new membrane contracts will be won in the first half of2014.

· It is the Directors' belief that identifying an industrial partner with financial strength would complement the engineering expertise and reputation of Hightex and would be of benefit for the Group.

  

 

For further information: 

 

Hightex Group plc

Charles DesForges, Executive Chairman

Tel: +44 (0) 20 7603 1515

Frank Molter, Chief Executive Officer

www.hightexworld.com

 

FinnCap

Geoff Nash - Corporate Finance

Tel: +44 (0) 20 7600 1658

Simon Starr - Broking

www.finncap.com

 

Chairman's statement

 

 

Introduction

 

On 26 September 2013 Hightex Group plc ("Hightex") announced that it had experienced difficulty in obtaining relevant financial information from its Brazilian joint venture partner SEPA Hightex Coberturas Ltda. In consequence the Directors then believed that there was a material uncertainty over some of the Brazilian receivables, which led them to conclude that they were not in a position to issue interim results for the six months to 30 June 2013 until there was greater certainty in respect of those receivables. As a result of this postponement of this announcement, trading in Hightex's shares was suspended from AIM with effect from 26 September 2013.

 

Significant events after 1 July 2013

The lack of verifiable information and transparency of the accounts of the Brazilian joint venture, which led to the postponement of the interims announcement, has been resolved by making a provision for specific debts arising in Brazil. The provision be clarified following further discussion with the Company's auditors. Legal advice has been sought as to appropriate action required to resolve this situation for the ultimate benefit of shareholders. The unwelcome consequence for Hightex was the creation of difficulties in its working capital. Hightex has traded judiciously through the subsequent period and is pleased to announce that it has now signed a loan facility with TCA Global Credit Master Fund, LP for up to USD10,000,000. The first USD 1,800,000 has been drawn down. With the aid of this facility, Hightex has restored its sufficiency of working capital for the foreseeable future.

As part of the Company's effort in the second half of 2013 to provide working capital from all possible sources, an interest of 50.2% in the shareholding of SolarNext was sold to a number of UK investors including management.

At the operational level, all of the contracts in Brazil have been executed and the stadia will be ready for the World Cup in June 2014. The Maracana Stadium was completed in May 2013 and used for the Confederations Cup in 2013. The Porto Alegre stadium has already staged a match after the President of Brazil officially opened it in February 2014. The construction of the Saudi Arabian structure in Riyadh, which had been halted in 2013, is now due to be approved under a new design provision and a new contract is under negotiation.

 

In the light of this announcement, the publication of the delayed interim announcement and the signing of the loan facility agreement, trading in the shares of Hightex is expected to be restored with effect from today, 26 March 2014.

Commentary on 2013 interim results

 

In the first six months of 2013, Hightex's revenues decreased from €7.9 million to €3.4 million. The stadia of Maracana and of Beira Rio contributed most of the first half revenues.

 

Work on the Prince Sultan Cultural Centre in Riyadh, Saudi Arabia, suffered a delay as a result of changes in the local construction codes and therefore contributed little to first half revenues.

 

The 60% fall in revenues resulted in a gross profit €0.5 million(2012 first half: gross profit of €1.1 million). This is mainly explained by the low turnover for the Brazilian stadia of Porto Alegre and Natal in the first half of 2013.

 

Management responded to the financial pressures by making further reductions in general expenses, these being mainly achieved in the German operating company. These expenses fell to €1.3 millionin the first half of 2013 (2012: €1.6 million).

 

The result before tax in the first six months was a loss of €1.5 million compared with the loss of €1.0 million in the first six months of 2012. Expressed in per share terms, the result of the first six months of 2013 amounted to a loss of 0.53 cents, compared with a loss per share of 0.35 cents in the first half of 2012.

 

Shareholders' funds were €6.4 million, compared with €7.7 million at 31 December 2012 and €7.9 million at 30 June 2012. Cash balances as at 30 June 2013 were €0.7 million, compared with €0.9 million as at 31 December 2012 and €1.0 million as at 30 June 2012.

 

 

SolarNext

 

In the first half of 2013 SolarNext revenues were disappointing. The market for thermal cooling did not develop as rapidly as the industry had forecast and it was further adversely affected by the exceptionally cold weather in Europe during the spring of 2013. In the second half of 2013 sales continued at a low level because of political uncertainty on the governmental energy policy in Germany. These factors led to most industrial sectors putting investment plans on hold until the political complexion of the new government became clear. However, in the early weeks of 2014, a major recovery was seen in sales and SolarNext has already taken orders with a higher value than for all of 2013. The new controlling shareholder group is committed to introducing further funds into SolarNext so as to provide working capital to match the expected increase in turnover.

 

 

Prospects

 

Hightex has submitted a number of offers in response to published tenders for projects where the membrane component is an essential part of the total structure. The Directors believe that new contracts will be won in the first half of 2014 and the Company is vigorously pursuing a number of potential contracts, including two stadia and infrastructure projects in the Middle East as well as other identified projects in Europe and Africa. If successful, such contract wins would increase revenues in 2014 and subsequent years, bringing prospects for a return of Group profitability.

 

The Directors also believe that identifying an industrial partner with greater financial strength would complement the engineering expertise and the reputation of Hightex would be of benefit to the Group, its shareholders and its employees. The Board will also consider if necessary raising further capital from current shareholders.

The Directors and all employees are striving to secure new membrane and cable structure contracts and to drive SolarNext to profitability. 2014 will no doubt be challenging but Hightex's reputation for innovative engineering excellence places the Company in a good position when confidence in and infrastructure investment returns to the global economy.

 

 

Charles DesForges

Executive Chairman

 

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

 

Notes

6 Months

6 Months

12 Months

30-Jun

30-Jun

31-Dec

2013

2012

2012

(Unaudited)

(Unaudited)

(Audited)

€'000

€'000

€'000

Continuing operations

Revenue

3,426

7,908

17,688

Cost of sales

(2,932)

(6,845)

(15,110)

Gross profit

494

1,063

2,578

Operating expenses:

Selling and distribution costs

(380)

(521)

(943)

Research and development costs

(76)

(104)

(231)

Administrative expenses

(1,064)

(937)

(1,591)

Underlying loss before interest, tax, depreciation and amortisation

 

 

 

 

(1,026)

 

 

(499)

 

 

(187)

Depreciation and amortisation

(363)

(428)

(823)

Operating loss

(1,389)

(927)

(1,010)

Share option charge

(7)

(33)

(2)

Finance income

7

4

21

Finance costs

(130)

(102)

(311)

Share of the profit of associates

36

59

93

Loss before tax

(1,483)

(999)

(1,209)

Income tax (charge)/credit

4

(6)

(1)

(3)

Loss for the period

(1,489)

(1,000)

(1,212)

 

Loss attributable to equity holders

(1,489)

(1,000)

(1,212)

(1,489)

(1,000)

(1,212)

 

Loss per share (cents)

Basic

5

(0.53)

(0.35)

(0.43)

Diluted

5

(0.53)

(0.35)

(0.43)

 

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME (continued)

 

 

Other comprehensive income

6 Months

6 Months

12 Months

30-Jun

30-Jun

31-Dec

2013

2012

2012

(Unaudited)

(Unaudited)

(Audited)

€'000

€'000

€'000

Loss for the period

(1, 489)

(1,000)

(1,212)

Exchange differences in translating foreign operations

152

(16)

34

Total comprehensive loss for the period

(1,337)

(1,016)

(1,178)

Total comprehensive loss attributable to equity holders

(1,337)

(1,016)

(1,178)

(1,337)

(1,016)

(1,178)

 

 

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

 

Notes

30-Jun

30-Jun

31-Dec

2013

2012

2012

(Unaudited)

(Unaudited)

(Audited)

€'000

€'000

€'000

Non-current assets

Goodwill

6,722

6,722

6,722

Other intangible assets

1,587

1,861

1,716

Property, plant and equipment (net)

4,973

5,131

5,081

Other financial assets

655

629

767

Investments in associate

531

460

494

Deferred tax assets

0

2

1

Total non-current assets

14,468

14,805

14,781

 

Current assets

Inventories and work in progress

285

247

246

Accounts receivable

5,780

6,809

7,525

Cash and cash equivalents

803

1,174

949

Total current assets

6,868

8,230

8,720

Total assets

21,336

23,035

23,501

 

Shareholders' equity

 

Share capital

3,682

3,682

3,682

Share premium

15,059

15,059

15,059

Retained losses

(12,302)

(10,601)

(10,813)

Share option reserve

46

70

39

Translation reserve

(113)

(315)

(265)

Total equity attributable to equity holders

6,372

7,895

7,702

 

Current liabilities

Trade and other payables

11,030

10,463

11,796

Borrowings

1,406

1,578

1,391

Total current liabilities

12,436

12,041

13,187

 

Non-current liabilities

Borrowings

2,470

3,023

2,555

Deferred tax liability

58

76

57

Total non-current liabilities

2,528

3,099

2,612

Total liabilities

14,964

15,140

15,799

Total liabilities and equity

21,336

23,035

23,501

 

 

CONSOLIDATED STATEMENT OF CASH FLOWS

6 Months

6 Months

12 Months

30-Jun

30-Jun

31-Dec

2013

2012

2012

(Unaudited)

(Unaudited)

(Audited)

€'000

€'000

€'000

Cash flows from operating activities

Operating loss for the period:

(1,389)

(927)

(1,010)

Adjustments for:

Loss for disposal

16

-

(2)

Foreign exchange differences

155

(15)

28

Bad debts written off

4

-

105

Depreciation

233

284

543

Amortisation and impairment of intangibles

130

144

280

Operating cash flows before movements in working capital

 

(851)

 

(514)

 

(56)

Increase in inventories

(39)

(32)

(31)

(Increase) / decrease in accounts receivable

1,741

670

(150)

Increase / (decrease) in accounts payable

(737)

304

1,637

Cash generated / (used in) from operating activities

114

428

1,400

Interest paid

(130)

(102)

(311)

Income tax paid

(2)

(1)

(22)

Net cash generated / (used in) from operating activities

 

(18)

 

325

 

1,067

Cash flows from investing activities

Acquisition of other financial assets

(144)

(120)

(258)

Acquisition of intangible assets

-

(9)

-

Acquisition of property, plant and equipment

(145)

(186)

(392)

Interest received

7

4

21

Net cash used in investing activities

(282)

(311)

(629)

Cash flows from financing activities

Payment of finance lease liabilities

(14)

(45)

(88)

Proceeds from loan

256

-

27

Repayment of loans

(161)

(1,208)

(1,654)

Net cash (used in) / generated from financing activities

 

81

 

(1,253)

 

(1,715)

Net decrease in cash and cash equivalents

(219)

(1,239)

(1,277)

Cash and cash equivalents, beginning of period/year

917

2,189

2,189

Effect of foreign exchange on cash and cash equivalent

(3)

-

5

Cash and cash equivalents, end of period / year

695

950

917

Cash at bank and in hand comprises:

Cash and cash equivalents

79

144

160

Cash lodged under performance and warranty bonds

724

1,030

789

Bank overdraft

(108)

(224)

(32)

695

950

917

 

 

STATEMENT OF CHANGES IN CONSOLIDATED SHAREHOLDERS' EQUITY (Unaudited)

 

 

 

 

Share capital

 

Share premium

Retained losses

Share option reserve

Foreign currency translation reserves

Total

€'000

€'000

€'000

€'000

€'000

€'000

 

Balances at 1 January 2012

 

3,682

 

15,059

 

(9,601)

 

37

 

(299)

 

8,878

 Loss for the period

-

-

(1,000)

-

-

(1,000)

Currency translation differences

-

-

-

-

(16)

(16)

Total comprehensive income for the period

 

-

 

-

 

(1,000)

 

-

 

(16)

 

(1,016)

Share option charge

-

-

-

33

-

33

 

Balances at 30 June 2012

 

3,682

 

15,059

 

(10,601)

 

70

 

(315)

 

7,895

Loss for the period

-

-

(212)

-

-

(212)

Currency translation differences

-

-

-

50

50

Total comprehensive income for the period

-

-

(212)

-

50

(162)

Share option charge

-

-

-

(31)

-

(31)

 

Balances at 31 December 2012

 

3,682

 

15,059

 

(10,813)

 

39

 

(265)

 

7,702

Loss for the period

-

-

(1,489)

-

-

(1,489)

Currency translation differences

-

-

-

-

152

152

Total comprehensive income for the period

 

-

 

-

 

(1,489)

 

-

 

152

 

(1,337)

Share option charge

-

-

-

7

-

7

 

Balances at 30 June 2013

 

3,682

 

15,059

 

(12,302)

 

46

 

(113)

 

6,372

1. General information

 

Hightex Group Plc was incorporated on 28 June 2006 under the Companies Act 1985. The Company was registered under the number 5860429. The Company's registered office is located at Masters House, 107 Hammersmith Road, London W14 0QH. The Company is domiciled in the United Kingdom.

 

The consolidated financial information is presented in Euros (€).

 

2. Basis of preparation

 

The next annual financial statements of Hightex Group ('the Group') will be prepared in accordance with International Financial Reporting Standards (IFRS) as adopted for use in the EU applied in accordance with the provisions of the Companies Act 2006.

 

Accordingly, the interim financial information in this report has been prepared using accounting policies consistent with IFRS. IFRS is subject to amendment and interpretation by the International Accounting Standards Board (IASB) and the International Financial Reporting Interpretations Committee (IFRIC) and there is ongoing process of review and endorsement by the European Commission. The financial information has been prepared on the basis of IFRS that the directors expect to be applicable as at 31 December 2013.

 

The financial information has been prepared under the historical cost convention. The principal accounting policies set out below have been applied to all periods presented.

 

The consolidated interim financial information has been prepared assuming that the Group will continue as a going concern. Reference is made to Note 3. "Going Concern" below.

 

The same accounting policies, presentation and methods of computation have been followed in these unaudited interim financial statements as those which were applied in the preparation of the Group's annual financial statements for the year ended 31 December 2012.

 

The interim financial information for the six months ended 30 June 2013 was approved by the directors on 24 March 2014.

 

3. Going concern

 

Due to difficulties in obtaining relevant financial information from its Brazilian joint venture SEPA Hightex Coberturas Ltda. and material uncertainty over some of the Brazilian receivables Hightex faced difficulties in its working capital due to lack of cash receipts from these projects after the balance sheet date 30 June 2013. In order to restore the going concern assumption the Company has taken the following material measures:

 

· sale of 50.2% of the shares in SolarNext AG

· signing a loan facility with TCA Global Credit Master Fund, LP for up to USD 10,000,000, of which the first USD 1,800,000 has been drawn down.

 

Based on the financial forecasts for 2014 and 2015 and the Group's economic prospects the directors of Hightex Group have made the assessment, that these measures provide sufficient working capital in order to overcome the period until Hightex Group is able to earn operating positive cash flows from new projects in 2014. In assessing whether the going concern assumption is appropriate, the directors have taken into account all available information for the foreseeable future; in particular for the twelve months from the date of issue of the interim financial information. This included the nature of the business in which Hightex operates, the contracted revenues for the remainder of 2013, expected contract wins in 2014, as well as the aforementioned financing facilities available to the Group.

 

4. Taxation

 

30-Jun

30-Jun

31-Dec

2013

2012

2012

€'000

€'000

€'000

 (Unaudited)

 (Unaudited)

(Audited)

Deferred taxation

(4)

-

19

Current taxation

(2)

(1)

(22)

Corporate taxation charge

(6)

(1)

(3)

 

 

5. Earnings per share

 

 
 
Six months
ended
30 June
2013
€’000
(Unaudited)
 Six months
ended
30 June
2012
€’000
(Unaudited)
Year
ended
31 December
2012
€’000
(Audited)
 

 
 
 
 
Earnings
 
 
 
Earnings for the purpose of basic and
 
 
 
diluted earnings per share being net loss
 
 
 
attributable to equity shareholders
(1,489)
(1,000)
(1,212)
 
 
 
 
 
 
 
 
Number of shares
 
 
 
Weighted average number of ordinary shares
 
 
 
for basic earnings per share
282,820,727
282,820,727
282,820,727
 
 
 
 
Share options
-
-
-
Warrants
-
-
-
 
 
 
 
Weighted average number of ordinary shares
 
 
 
for diluted earnings per share
282,820,727
282,820,727
282,820,727
 
Earnings per share (cents)
 
 
 
Basic
(0.53)
(0.35)
(0.43)
Diluted
(0.53)
(0.35)
(0.43)
 

 

 

 

6. Dividend

 

The directors do not propose the payment of an interim dividend (2012: nil).

 

 

7. Contingent liabilities

 

The group had contingent liabilities of €893,000 (31 December 2012: €529,000) under contracted performance and warranty bonds and advance payments.

 

 

 

8. Post balance sheet events

 

The following material post balance sheet events have incurred to date:

 

At operational level all three contracts in Brazil (Maracana Stadium, Estadio Beira-Rio and Natal) have been executed and will be ready for the World cup in 2014.

 

Difficulties in obtaining financial information from its Brazilian joint venture SEPA Hightex Coberturas Ltda. triggered material uncertainty over Brazilian receivables. Directors concluded to be not in a position to issue interim results for the six months period ended 30 June 2013 resulting in a suspension from trading at AIM effective from 26 September 2013.

 

Lacking verifiable information Hightex has accounted for a provision on respective Brazilian receivables. The provision will be clarified following further discussion with the Company's auditors. The consequences of this situation were difficulties in Hightex' working capital.

 

Providing working capital from all possible sources in the second half of 2013 included the sale of 50.2% of the shares in SolarNext AG and signing a loan facility with TCA Global Credit Master Fund, LP for up to USD 10,000,000 in March 2014.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IR LLFFAVRIEFIS
Date   Source Headline
2nd Jun 20155:02 pmRNSNomad resignation
20th May 20157:00 amRNSDisposal of Business - Hightex GmbH
6th May 201512:49 pmRNSAppointment of Joint Administrators
2nd Mar 20157:30 amRNSCOMMENCEMENT OF INSOLVENCY PROCEEDINGS
27th Feb 201511:49 amRNSStatement re. Suspension
27th Feb 201511:45 amRNSSuspension - Hightex Group Plc
24th Feb 20155:19 pmRNSHolding(s) in Company
23rd Feb 20154:42 pmRNSHolding(s) in Company
5th Feb 20155:39 pmRNSHolding(s) in Company
5th Feb 20154:38 pmRNSHolding(s) in Company
12th Jan 20155:32 pmRNSHolding(s) in Company
17th Dec 20147:00 amRNSUpdate on German Court process
19th Nov 20148:00 amRNSFinancial update
17th Nov 201412:57 pmRNSHolding(s) in Company
12th Nov 20147:00 amRNSHolding(s) in Company
10th Nov 20143:32 pmRNSLoan Facility
4th Nov 20149:41 amRNSHolding(s) in Company
31st Oct 201411:48 amRNSHolding(s) in Company
20th Oct 20147:00 amRNSChange of Adviser
30th Sep 201412:37 pmRNSUnaudited Results for 6 Months Ended 30 June 2014
19th Aug 201410:45 amRNSHolding(s) in Company
29th Jul 201412:20 pmRNSHolding(s) in Company
24th Jul 20144:24 pmRNSStatement re Share Price Movement
9th Jul 20143:07 pmRNSResult of AGM and Board Changes
16th Jun 20143:40 pmRNSAnnual accounts and notice of AGM
9th Jun 20147:00 amRNSResults for the Year Ended 31 December 2013
23rd May 20144:19 pmRNSIssue of Equity
26th Mar 20147:45 amRNSRestoration - Hightex Group Plc
26th Mar 20147:01 amRNSLoan Facility & Restoration to Trading on AIM
26th Mar 20147:00 amRNSUnaudited Results for Six Months To 30 Jun 2013
2nd Oct 201312:01 pmRNSInterim financing
26th Sep 20138:31 amRNSStatement re. Suspension
26th Sep 20137:30 amRNSSuspension - Hightex Group plc
26th Jun 201312:18 pmRNSResult of AGM
30th May 20131:36 pmRNSAnnual Report and Accounts posted
24th Apr 20137:00 amRNSPreliminary Results
3rd Apr 201310:08 amRNSHolding(s) in Company
4th Feb 20137:00 amRNSUpdate on Brazilian projects
16th Jan 20134:29 pmRNSHolding(s) in Company
19th Dec 201210:40 amRNSDirector/PDMR Shareholding
18th Dec 20129:41 amRNSHolding(s) in Company
17th Dec 20129:36 amRNSHolding(s) in Company
11th Dec 20124:26 pmRNSHolding(s) in Company
11th Dec 20127:00 amRNSContract Win
15th Nov 20122:59 pmRNSDirector/PDMR Shareholding
20th Sep 20127:00 amRNSInterim Results
17th Sep 20129:48 amRNSHolding(s) in Company
28th Aug 20127:00 amRNSContract Win
27th Jul 20123:34 pmRNSHolding(s) in Company
19th Jul 20127:00 amRNSSolarNext Contract Win

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.