Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHightex Group Regulatory News (HTIG)

  • There is currently no data for HTIG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract win

12 May 2008 06:00

Hightex Group plc ("Hightex") Contract win: Dolce Vita Tejo shopping mall in Lisbon; unique Selective and Low-E cushion roof for one of the largest Shopping Malls in Europe Hightex is pleased to announce that, with its consortium partner Martifer Construcoes Metalomecanicas S.A., the Portuguese steel construction company, a part of the Martifer Group, it has signed a contract to provide the complete steel structure, ETFE cushion roof and facade for the Dolce Vita Tejo shopping mall situated in Lisbon, Portugal for Chamartin Imobiliaria in partnership with ING Real Estate. Totaling more than 120,000 square meters of gross rentable area, this will be the largest shopping mall in Portugal and one of the largest in Europe. The centre will have 300 stores, a giant hypermarket, a cinema complex and Portugal's largest shopping car park. Completion is scheduled for 2009. The total contract volume for Hightex is around EUR 8.5 million. The Directors of Hightex expect that approximately EUR 7.5 million of this revenue will arise in 2008, with the balance in 2009. The significance of this contract is that the Dolce Vita Tejo shopping mall will be the first shopping centre in the world to have a unique ETFE roof design. The benefits of ETFE cushions are finding greater and greater use in modern building design. The Dolce Vita project marks an important milestone in allowing ETFE to compete with glass in thermal performance, through the use of high performance Selective Filters and Low-Emissivity ("Low-E") coatings applied to the cushion system. Emissivity is a measure of how much a glass or other surface transfers radiant heat. The Selective Filter is a coating which represents a pioneering use of the ETFE membrane, as the Selective Filter allows more light than heat to enter the building. The second feature, a Low-E coating, serves to prevent the roof, when it gets hot, radiating heat into the building, thereby reducing the cooling costs. The project design by international architects RTKL in co-operation with local architects Promontorio in Lisbon and, with structural engineers Atelier One in London is unique in other aspects. The concept achieves an environment within the building which gives the feeling of being outside, but at the same time reduces the direct solar gain from the sun and controls heat build-up to give a comfortable environment. The design has taken the benefits of lightweight, transparent ETFE cushions and tailored them to suit the building's unique requirements. The design is a 21st century solution of the "northern light" principle, allowing light mainly to enter the building from the north thus eliminating unwanted direct heat build-up and glare. This is achieved by the cushion roof forming "windows" within their three dimensional form, whilst at the same time rejecting or filtering light and energy using selective filters and Low-E coatings. The development work for the performance coatings carried out by Hightex and its industrial partners will open the market for ETFE to compete with traditional glazing in terms of thermal performance. Charles DesForges, Chairman, stated that "Hightex Group is delighted to have been selected for such a prestigious project. The two key innovative features, the Selective Filter and low-E coating, added to the basic ETFE membrane offer exciting opportunities for further contract wins for this new breed of structures". Enquiries: Charles DesForges, Chairman, Hightex Group plc +44 (0) 207 603 1515 Sindre Ottesen, Landsbanki Securities +44 (0) 207 426 9000 About Hightex Hightex has a long history of building large span roofs and facades using architectural membranes, exemplified by the Abuja Stadium for the All African Games in 2003 as well as the Berlin Stadium, Germany, used for the most recent FIFA World Cup Final in 2006. Hightex has been awarded the contract to provide the membrane roof as part of the upgrading of the First National Bank (FNB) Stadium in Johannesburg, which will be the stadium for several first and second round matches, one quarter-final and the final match at the FIFA 2010 Football World Cup. In 2006 Hightex completed one of the largest membrane projects in the world, designing and constructing the energy-saving, sound-optimised, triple layer
Date   Source Headline
2nd Jun 20155:02 pmRNSNomad resignation
20th May 20157:00 amRNSDisposal of Business - Hightex GmbH
6th May 201512:49 pmRNSAppointment of Joint Administrators
2nd Mar 20157:30 amRNSCOMMENCEMENT OF INSOLVENCY PROCEEDINGS
27th Feb 201511:49 amRNSStatement re. Suspension
27th Feb 201511:45 amRNSSuspension - Hightex Group Plc
24th Feb 20155:19 pmRNSHolding(s) in Company
23rd Feb 20154:42 pmRNSHolding(s) in Company
5th Feb 20155:39 pmRNSHolding(s) in Company
5th Feb 20154:38 pmRNSHolding(s) in Company
12th Jan 20155:32 pmRNSHolding(s) in Company
17th Dec 20147:00 amRNSUpdate on German Court process
19th Nov 20148:00 amRNSFinancial update
17th Nov 201412:57 pmRNSHolding(s) in Company
12th Nov 20147:00 amRNSHolding(s) in Company
10th Nov 20143:32 pmRNSLoan Facility
4th Nov 20149:41 amRNSHolding(s) in Company
31st Oct 201411:48 amRNSHolding(s) in Company
20th Oct 20147:00 amRNSChange of Adviser
30th Sep 201412:37 pmRNSUnaudited Results for 6 Months Ended 30 June 2014
19th Aug 201410:45 amRNSHolding(s) in Company
29th Jul 201412:20 pmRNSHolding(s) in Company
24th Jul 20144:24 pmRNSStatement re Share Price Movement
9th Jul 20143:07 pmRNSResult of AGM and Board Changes
16th Jun 20143:40 pmRNSAnnual accounts and notice of AGM
9th Jun 20147:00 amRNSResults for the Year Ended 31 December 2013
23rd May 20144:19 pmRNSIssue of Equity
26th Mar 20147:45 amRNSRestoration - Hightex Group Plc
26th Mar 20147:01 amRNSLoan Facility & Restoration to Trading on AIM
26th Mar 20147:00 amRNSUnaudited Results for Six Months To 30 Jun 2013
2nd Oct 201312:01 pmRNSInterim financing
26th Sep 20138:31 amRNSStatement re. Suspension
26th Sep 20137:30 amRNSSuspension - Hightex Group plc
26th Jun 201312:18 pmRNSResult of AGM
30th May 20131:36 pmRNSAnnual Report and Accounts posted
24th Apr 20137:00 amRNSPreliminary Results
3rd Apr 201310:08 amRNSHolding(s) in Company
4th Feb 20137:00 amRNSUpdate on Brazilian projects
16th Jan 20134:29 pmRNSHolding(s) in Company
19th Dec 201210:40 amRNSDirector/PDMR Shareholding
18th Dec 20129:41 amRNSHolding(s) in Company
17th Dec 20129:36 amRNSHolding(s) in Company
11th Dec 20124:26 pmRNSHolding(s) in Company
11th Dec 20127:00 amRNSContract Win
15th Nov 20122:59 pmRNSDirector/PDMR Shareholding
20th Sep 20127:00 amRNSInterim Results
17th Sep 20129:48 amRNSHolding(s) in Company
28th Aug 20127:00 amRNSContract Win
27th Jul 20123:34 pmRNSHolding(s) in Company
19th Jul 20127:00 amRNSSolarNext Contract Win

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.