Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHighlands Natural Resources Regulatory News (HNR)

  • There is currently no data for HNR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

22 Aug 2006 07:00

Hardman Resources Limited22 August 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 22 August 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group (UK media relations) +44 207 404 5959 RE: UGANDA FLOW TEST AND MAURITANIA DRILLING UPDATE Hardman Resources Limited ("Hardman") provides the following update on its flowtesting and exploration drilling operations: Uganda: Mputa-1 Flow Test Update (Block 2) Hardman has completed a successful testing campaign at the Mputa-1 discoverywell. Since our last announcement on 15 August, the upper sand interval has nowbeen tested on natural flow. Results from both zones tested are summarisedbelow: Test Perforated Interval Choke Flow Rate Oil Quality (metres) (bopd) o APILower Sand Zone (DST 2)1,118.0 - 1,126.0 32/64" 300 32Upper Sand Zone (DST 3)966.5 - 974.5 40/64" 820 33 TOTAL 1,120 The test results prove not only that the oil at Mputa is mobile, but also thatthe reservoir sands are capable of producing dry oil under natural flow atpotentially commercial rates. The latter aspect is particularly significant,given that the Mputa reservoirs are at shallower depth, and are hence at lowerpressure and temperature than the corresponding reservoir units at Waraga. Thispositive test result therefore expands the operating envelope over which typicalWaraga and Mputa crudes (32 degrees API) can be produced and eliminates pre-testconcerns over oil viscosity and fluid properties at these shallower depths. Although laboratory confirmation is still awaited, the gravity of all oil flowedat Mputa is similar to that found in the lower units of the Waraga-1 well and islikely to be of similar origin. The Mputa-1 well is located 220 kilometresnorthwest of the Ugandan capital Kampala and 8 kilometres from the shore of LakeAlbert. The Waraga-1 well is located 19 kilometres to the northeast of Mputa-1. This concludes the testing programme at Mputa-1. The well is presently beingsuspended and the rig and test crew are being stood down. Initial guidance onvolumes will be included in the company's Half Yearly Report on 29 August 2006. Hardman Resources Managing Director and CEO, Simon Potter, commented: "The positive test results from Mputa are particularly important given that wemap more oil in place in this resource than at Waraga. Natural flow from thereservoir at these pressures and temperatures are indicative that productionrates could potentially be commercial. Further, collectively the results to-dateindicate that oil from the source interval deep under the lake can migrate allthe way across the rift valley to the boundary fault and thus potentially overthe whole licence, considerably upgrading remaining prospectivity. The joint venture has presented potential forward options to the Government andis currently in discussions concerning the way forward on each of exploration,further appraisal and potential development concepts." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Times and dates for Ugandan wells refer to Uganda time (GMT+3 hours), five hoursbehind Western Standard Time (Perth). Mauritania: Exploration Drilling Update - Flamant-1 (Block 8) Since the last report, Flamant-1 has drilled ahead in 26" hole to a depth of1,867m where the 20" casing was run and cemented. As at Midnight on the 21stAugust, preparations were underway to drill ahead in the 17 1/2" hole. Flamant-1 will target Cretaceous Carbonates and has a planned total depth3,370m. The well is located in 1414m of water, approximately 210km from theshore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilledin Block 7. Equities in Block 8 are: Block 8Dana Petroleum (Operator) 41.5%Hardman Resources Ltd 18.0%Roc Oil Company 2.0%Wintershall 25%Gaz de France 13.5% Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. SIMON POTTERManaging Director and CEO Note: (1) In accordance with the ASX Listing Rules, the geological informationsupplied in this report has been based on information provided by geologists whohave had in excess of five years experience in their field of activity. (2) In accordance with the AIM Rules, the information in this report hasbeen reviewed and signed off by Mr Andrew Patterson, B Eng., Technical Manager at Hardman Resources, who is a member of the Petroleum Exploration Society of Australia and has at least 5 years relevant experience within the sector. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
12th Sep 20067:00 amRNSMauritania Drilling Report
5th Sep 20067:00 amRNSMauritania Drilling Update
29th Aug 20067:01 amRNSHardman Interim Results
29th Aug 20067:00 amRNSInvestor Presentation
29th Aug 20067:00 amRNSDrilling Update
29th Aug 20067:00 amRNSInterim Financial Report
23rd Aug 20067:00 amRNSHalf Year & Chinguetti Update
22nd Aug 20067:01 amRNSWell Test Update
22nd Aug 20067:00 amRNSDrilling Update
15th Aug 20067:00 amRNSDrilling and Testing Update
8th Aug 20067:00 amRNSUganda Testing Programme
1st Aug 20067:00 amRNSHardman Drilling Update
25th Jul 20067:00 amRNSDrilling Update
21st Jul 200610:08 amRNSASX Appendix 3B
21st Jul 20067:00 amRNSJune 2006 Quarterly Report
12th Jul 20067:00 amRNSSubstantial Shareholding
10th Jul 20067:01 amRNSWell Test Update
10th Jul 20067:00 amRNSUganda Testing Update
4th Jul 20068:32 amRNSWell update
4th Jul 20067:06 amRNSWell Update
4th Jul 20067:00 amRNSUganda Testing Update
30th Jun 20067:00 amRNSAppointment of New Chairman
27th Jun 20067:02 amRNSWell Test Update
27th Jun 20067:00 amRNSUganda Testing Update
23rd Jun 20067:02 amRNSWell update
23rd Jun 20067:00 amRNSUganda Drilling Update
20th Jun 20067:00 amRNSUganda Testing Programme
20th Jun 20067:00 amRNSUBS Sydney Presentation
19th Jun 20068:48 amRNSChange in Directors Interest
8th Jun 200610:23 amRNSChange in Directors Interest
8th Jun 20069:58 amRNSASX APPENDIX 3B
7th Jun 200610:07 amRNSLondon Oil & Gas Presentation
7th Jun 20067:00 amRNSSigned Revised Mauritania PSC
31st May 20067:00 amRNSChinguetti Production Update
31st May 20067:00 amRNSLong-Term Incentive Plan
30th May 20067:03 amRNSUganda Drilling Update
30th May 20067:00 amRNSDrilling Report
23rd May 20067:04 amRNSDrilling Update
23rd May 20067:00 amRNSDrilling Report
18th May 20067:00 amRNSASX Appendix 3X
18th May 20067:00 amRNSChairmans Intention to Retire
18th May 20067:00 amRNSASX Appendix 3X
18th May 20067:00 amRNS2006 Results of AGM
18th May 20067:00 amRNS2006 AGM Presentation
18th May 20067:00 amRNSChairmans AGM Address
16th May 20067:00 amRNSAdditional Listing
16th May 20067:00 amRNSDrilling Report
15th May 200611:27 amRNSHardman Post AGM Roadshow
15th May 200611:23 amRNSOperatingCashFlows Chinguetti
9th May 20067:00 amRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.