Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant Results

3 Nov 2009 07:00

RNS Number : 8105B
Highland Gold Mining Limited
03 November 2009
 



Significant Results Achieved at two Highland Gold Exploration Properties.

3 November 2009 - Highland Gold Mining Limited ("Highland Gold", or the "Company") is pleased to announce positive exploration results from its Mnogovershinnoye (MNV) and Lyubov properties.

At Mnogovershinnoye excellent drilling results have been received from the Company's ongoing near-mine exploration programme which is directed at discovering and delineating additional reserves to be available for underground and open-pit production in the short term. 

For the re-evaluation of previous drilling results 53 new shallow drill holes have been completed totalling 3,500 metres at the Valunistoye (Pebble) prospect. The prospect is a 2.5 kilometre long steeply dipping mineralised zone approximately 20 metres wide which extends towards the Northwest of the license area - just North of the current open pit.

Fire assay results received to date concur with our reserve model for this prospect but also include newly discovered high-grade intersects in between previously defined mining blocks: 

Mnogovershinnoye - Valunistoye - Exploration Drilling Highlights 2009 

Drill Hole Id

Drill Hole Length  [m]

From  [m]

To  [m]

Intersect Length  [m]

Au [g/t]

2855-2

70.3

17.0

42.5

9.2

25.5

2575-2

50.0

13.3

23.6

14.0

10.3

2875-1

54.5

13.3

39.4

5.2

26.1

2555-2

52.2

2.8

10.7

14.9

7.9

2595-2

40.4

12.9

35.0

5.0

22.1

2855-1

46.1

1.3

22.7

4.2

21.4

2795-1

70.4

4.2

14.2

8.5

10.0

2535-1

58.5

15.1

21.4

11.7

6.3

2640-3

82.0

35.4

38.7

13.7

3.3

Drill hole inclination from surface: 60 degrees 

These new results corroborate the reserve potential of Valunistoye now estimated at 190,000 ounces of shallow, open-pit mineable ore grading between 3.0-5.0 g/t, more than double the originally defined gold reserves at Valunistoye and are expected to contribute considerably to MNV's open-pit operations in the near future.

By year end a total of 5,000 metres of exploration drilling will be completed. In 2010 resource definition will continue for which 6,000 metres of drilling have been allocated including testing of 1.5 kilometres of undrilled sections along the entire length of the Valunistoye zone.

At Lyubov, positive intermediate results have been received from metallurgical test work performed at SGS laboratories in the regional capital Chita on a 320 kg composite sample of primary ore. The sample was collected from drill core from between 50 and 200 metres depths at the Evgraf target and bottle-roll testing with a 96 hour leach period returned high gold recoveries.

Lyubov - Bottle roll test 

Cyanidation Leach Time - 96 hrs

Ore Fraction [mm]

Gold Recovery [%]

10.0

68.7

5.0

71.9

0.075

89.1

Sample grade: 1.5 g/t

These results corroborate the positive metallurgical properties for the Evgraf ore which also yielded gold recoveries in excess of 80% utilising gravitational enrichment during previous test work. Future processing scenarios at Evgraf may include gravitational concentration with cyanidation of concentrate or conventional milling followed by cyanidation or a low-cost heap leach operation. Amenability for heap leaching is currently being investigated at SGS utilising column leach tests for particle sizes of 5, 10 and 20 mm and results are expected by the end of December 2009.

An in-house resource estimate for the Evgraf target combining previous external and our own drilling results currently defines a resource potential of 1.6 million ounces of gold at an average grade of 1.7 g/t and a cut-off grade of 0.75 g/t. Othis 0.6 million ounces have been calculated as C1+C2 category reserves extending to a depth between 200 to 250 metres from surface. 

Additional drilling of 6,000 metres is planned for 2010 at the target and is aimed at increasing the C1+C2 reserves potential by at least 0.6 million ounces of gold through conversion of adjacent prognostic P1 resources.

Mr. Werner Klemens, Head of Exploration at Highland Gold has reviewed and verified the 

information contained in this release with respect to drilling and resource /reserves matters. Mr. 

Klemens holds a Ph.D. in Geology from the University of Toronto. He has 11 years 

experience in mineral exploration and is a fellow of the Geological Association of Canada

A rigorous quality assurance programme complying to international standards is in effect 

at all exploration projects and includes duplicate sampling, insertion of standards and 

check assaying at external laboratories.

Commenting on today's announcement Valery Oif, CEO of Highland Gold, said: "We are very pleased with the good drilling results at MNV. This underlines that this deposit still holds significant exploration potential which we are determined to fully exploit and turn into value. The metallurgical test work at the Lyubov deposit continues to yield positive results and opens up a number of options for a low cost operation."

For further information please contact: 

Highland Gold 

Dmitry Yakushkin, Head of Communications - +7 495 424 95 21

Duncan Baxter, Chairman - +44 (0) 1534 814202

Fin Public Relations 

Alex Glover - +44 (0) 207 608 2280 

Smith's 

Dominic Palmer-Tomkinson - +44 (0) 207 239 0140 

J.P. Morgan Cazenove (Nominated Adviser) 

Michael Wentworth-Stanley, Managing Director 

+ 44 (0) 207 588 2828

www.highlandgold.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAXFAEASNFFE
Date   Source Headline
24th May 20182:28 pmRNSResult of Annual General Meeting
4th May 20187:00 amRNSMailing of 2017 Annual Report and Notice of AGM
30th Apr 20187:00 amRNSQ1 2018 Operating Results
26th Apr 20187:00 amRNSAgreement to Purchase Gold Assets in Chukotka
17th Apr 20187:00 amRNS2017 Final Results
11th Apr 20187:38 amRNSFull Year Results Announcement Date
22nd Feb 20188:47 amRNSResources and Reserves Update as at 31 Dec 2017
7th Feb 20187:00 amRNSBelaya Gora/Blagodatnoye PFS and Resource Update
6th Feb 20187:00 amRNSKekura Feasibility Study and Resource Update
5th Feb 20187:00 amRNSBlock listing Interim Review
18th Jan 20187:00 amRNSQ4 2017 Operating Results
13th Dec 20177:00 amRNSBoard of Directors Adopts Dividend Policy
30th Nov 20174:33 pmRNSHolding(s) in Company
20th Nov 20177:00 amRNSUpdated Resource and Reserve Estimates for Novo
9th Nov 201710:17 amRNSAppointment of Chief Operating Officer
11th Oct 20177:00 amRNSQ3 2017 Operating Results
9th Oct 20178:56 amRNSAppointment of Joint Corporate Broker
18th Sep 20173:42 pmRNSHolding(s) in Company
4th Sep 20177:00 amRNSInterim Results Announcement for H1 2017
30th Aug 20177:00 amRNSInterim Results Announcement Date
3rd Aug 20177:00 amRNSBlock listing Interim Review
24th Jul 20177:00 amRNSQ2 2017 Operating Results
5th Jun 20177:00 amRNSCompany Cleared to Proceed with Kekura Development
22nd May 20177:00 amRNSNew Exploration Licences Adjacent to MNV
17th May 20171:11 pmRNSResult of AGM
5th May 20177:00 amRNSDirector/PDMR Shareholding
5th May 20177:00 amRNSUpdated Resource and Reserve Estimates for MNV
28th Apr 201710:32 amRNSMailing of 2016 Annual Report and Notice of AGM
27th Apr 20177:01 amRNSQ1 2017 Operating Results
10th Apr 20177:00 amRNS2016 Final Results
4th Apr 20177:00 amRNSNotice of Results
20th Mar 20177:04 amRNSUnkurtash Scoping Study
1st Mar 20171:25 pmRNSDirector/PDMR Shareholding
21st Feb 20174:06 pmRNSHolding(s) in Company
3rd Feb 20177:00 amRNSBlock listing Interim Review
26th Jan 20179:03 amRNSQ4 2016 Operating Results
9th Nov 20167:00 amRNSDirector/PDMR Shareholding
3rd Nov 20167:00 amRNSQ3 2016 Operating Results
26th Sep 20167:00 amRNSInterim Results Announcement for H1 2016
23rd Sep 20162:54 pmRNSInterim Results Announcement Date
5th Sep 20167:00 amRNSAgreements Signed for State Support of Kekura
9th Aug 20168:30 amRNSQ2 2016 Operating Results (Replacement)
9th Aug 20167:00 amRNSQ2 2016 Operating Results
3rd Aug 20167:00 amRNSBlock listing Interim Review
25th May 201612:00 pmRNSResult of AGM
23rd May 20167:00 amRNSQ1 2016 Operating Results
19th May 20167:00 amRNSKekura Project Update
20th Apr 20167:00 amRNS2015 Final Results
15th Apr 20162:18 pmRNSNotice of Results
3rd Feb 20167:00 amRNSBlocklisting Interim Review

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.