Update on Developments at Akrokeri-Homase Project

21 Dec 2018 07:00

RNS Number : 1967L
Goldstone Resources Ltd
21 December 2018
 

21 December 2018

 

GOLDSTONE RESOURCES LIMITED

("GoldStone" or the "Company")

 

Operational Update on Developments at Akrokeri-Homase Gold Project

 

GoldStone Resources Limited (AIM: GRL), is pleased to provide an update on activities at its Akrokeri-Homase Gold Project ("AKHM" or "the Project") in the Ashanti Region of Ghana. The Project is centred around two previously producing assets, the high-grade Akrokeri underground mine and the Homase open pit mine, which are being simultaneously developed towards delivering gold production by mid 2020.

 

The highlights from the work programmes that are continuing on both of the historic mines are set out below.

 

Akrokeri Underground Mine

· Progress continues to be made at the high grade Akrokeri Mine within the area that hosts the numerous artisanal shafts and pits, whereby work continues to make safe the shallow workings, and those that have been accessed are being mapped

· At the North Shaft, where Level 1 has been intersected, the process of clearing out old rails, wood and debris is underway to form a safe access to continue working in the shaft for the reopening of the mine to access the workings down to 400 feet (approximately 122 metres)

 

Homase Open Pit Mine

· As part of the Scoping Study along the 8 km Homase Trend, a pilot heap leach project is underway to determine parameters for near term development including the period required for leaching and potential gold recoveries through heap leach treatment

- After the first 40 days of irrigation of a pilot heap leach plant, using 2.5 tonnes of material from Homase South, within the Homase Trend, recoveries are 67.5%, with irrigation continuing through to extinction

- The University of Mines and Technology (UMaT) in Tarkwa, Ghana, estimates that the leach cycle will be 65 days with recoveries of up to 80%

- The oxide zone within Homase South is demonstrating amenability to low-capex heap leach treatment

· Scoping Study will also look at the Homase North Resource Zone within the Homase Trend, where historic trenching has indicated high grade gold mineralisation, including 15.0 metres @ 6.31 g/t Au which includes 4.5 metres @ 18.23 g/t Au

· Following on from the soils programme results announced 20 June 2018, a deep trenching programme is underway, to prove up the continuity of the mineralisation within the Homase Trend north of the former Homase pit. The first stage of trenching is at the Homase North and Adubriem deposits with samples having being submitted to the laboratory, with results expected in Q1 2019

· The Environmental Baseline Study has been expanded to include the potential Homase North pits as well as Homase South

 

Emma Priestley, CEO of GoldStone, commented:

 

"Our strategy of advancing development at both Akrokeri and Homase is centred on achieving production at multiple mining operations in as short time as practicable. Akrokeri has the distinct advantage of demonstrating exceptionally high grade material, including intercepts of 1.0 metre at 51.01 g/t Au, and established mining infrastructure, whilst Homase offers the potential benefit of being amenable to low capital heap leach treatment. When looking at the assets in unison, I am confident that GoldStone has a clear pathway to production in mid 2020, utilising the significant support and expertise of our strategic shareholders and team who have a proven track record in building gold mines."

 

 

**ENDS**

 

For further information, please contact:

 

 

 

Strand Hanson Limited

 

Richard Tulloch / James Bellman

Tel: +44 (0)20 7409 3494

 

 

SI Capital Limited

 

Nick Emerson

Tel: +44 (0)1483 413 500

 

 

Citigate Dewe Rogerson

 

Sam Stibbs

Tel: +44 (0)20 7282 2932

 

 

St Brides Partners Ltd

 

Susie Geliher / Juliet Earl

Tel: +44 (0)20 7236 1177

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014.

 

About GoldStone Resources Limited

 

GoldStone Resources Limited (AIM: GRL) is an AIM quoted gold exploration and development company with projects in Ghana, Senegal and Gabon that range from grassroots to advanced exploration.

 

The Company is focused on developing the Akrokeri-Homase Gold Project ("AKHM" or the "Project") in south-western Ghana, which hosts a JORC Code compliant 602,000 oz gold resource at an average grade of 1.77 g/t, along strike from the Obuasi Gold Mine, one of the world's major gold mines with a total historical and current resource in excess of 70 million ounces of gold. GoldStone's existing resource is confined to a 4 km zone of the Homase Trend, including Homase North, Homase Pit and Homase South. The recent soils programme carried out in 2018 identified that the existing 4 km zone is open along strike with a potential 8 km mineralised zone along the Homase Trend.

 

AKHM hosts two former mines, the underground mine at Akrokeri mined by Akrokeri Ashanti Mine Ltd, which produced 75,000 oz gold @ 24 g/t recovered grade in the early 1900s, and the Homase Pit which AngloGold Ashanti developed in 2002/03 producing 52,000 oz gold @ 2.5 g/t recovered. It is the Company's intention to build a portfolio of high-quality gold projects in Ghana, with a particular focus on the highly prospective Ashanti Gold Belt.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDEAXAEALPPFFF
Date   Source Headline
2nd Jun 20267:00 amRNSSierra Leone Update
5th May 20268:16 amRNSOperational Update and Growth Strategy
7th Apr 20267:00 amRNSAppointment of NED and Board Role Change
17th Mar 20267:00 amRNSSierra Leone Investment
17th Mar 20267:00 amRNSSierra Leone Investment
19th Feb 20267:00 amRNSIssue of Options
9th Feb 20266:24 pmRNSDirectorate change
5th Feb 20263:03 pmRNSResult of EGM and TVR
4th Feb 20267:00 amRNSOperational Update
21st Jan 20267:00 amRNSEGM Notice,Subscription,Interest & Fee Conversions
7th Jan 20267:00 amRNSOperational Update
30th Dec 20257:00 amRNSGold Loan Standstill Extension
30th Dec 20257:00 amRNSGold Loan Standstill Extension
22nd Dec 20257:00 amRNSDirector Appointments
22nd Dec 20257:00 amRNSDirector Appointments
30th Sep 20257:00 amRNSInterim Results
2nd Sep 20257:00 amRNSOperational Update
12th Aug 20257:00 amRNSResult of AGM
24th Jul 20257:00 amRNSPosting of Circular,Notice of AGM and Media Update
1st Jul 20257:00 amRNSFinal Results
25th Jun 202510:53 amRNSHolding(s) in Company
18th Jun 20257:00 amRNSNotice of Final Results & Operations Update
16th Apr 20251:22 pmRNSStatement re Press Reports
28th Mar 20257:00 amRNSGold Loan Interest Conversion
26th Mar 20257:00 amRNSProduction Continues to Ramp Up at Homase Mine
20th Feb 202512:05 pmRNSHolding(s) in Company
12th Feb 20257:00 amRNSRecord Gold Pour and Update re Homase Mine
28th Jan 20257:00 amRNSConversion Shares Update
15th Jan 20257:00 amRNSHomase Mine Update
23rd Dec 20247:00 amRNSConvertible Loan Notes Update
9th Dec 20247:00 amRNSHomase Mine and update re Convertible Loan Note
2nd Dec 20247:00 amRNSUpdate re Convertible Loan Note
11th Nov 20247:00 amRNSHomase Gold Mine Update
29th Oct 20246:00 pmRNSUpdate re Subscription and Debt Conversion
24th Oct 20247:00 amRNSConditional Subscription and Debt Conversion
30th Sep 20247:00 amRNSHalf-year Report
21st Aug 20242:30 pmRNSConditional Subscription of £600,000
6th Aug 20247:00 amRNSProgress on Operations
1st Aug 20247:00 amRNSIssue of Options
8th Jul 20248:00 amRNSHomase Mine Update
28th Jun 20244:21 pmRNSFinal Results
5th Jun 20247:00 amRNSDirector Appointment
24th May 20247:30 amRNSRestoration - Goldstone Resources Limited
23rd May 20244:35 pmRNSCompletion of Fundraising & Lifting of Suspension
21st May 202411:30 amRNSCorporate Update
13th May 202410:45 amRNSUpdate re Subscription
7th May 20247:00 amRNSUpdate re Subscription
29th Apr 20245:56 pmRNSResult of AGM
11th Apr 20242:30 pmRNSPosting of Circular and Notice of AGM
10th Apr 20245:30 pmRNSDirector and Senior Management Fee Conversions

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.