Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGoldstone Resources Regulatory News (GRL)

  • This share is currently suspended. It was suspended at a price of 2.15

Share Price Information for Goldstone Resources (GRL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.15
GRL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update on High Grade Akrokeri Mine

10 Jul 2018 07:00

RNS Number : 0802U
Goldstone Resources Ltd
10 July 2018
 

10 July 2018

GOLDSTONE RESOURCES LIMITED

("GoldStone" or the "Company")

 

Operational Update on High Grade Akrokeri Mine

and Scoping Study & EIS Underway

 

GoldStone Resources Limited (AIM: GRL), is pleased to update the market on the progress of activities at its Akrokeri-Homase Gold Project ("AKHM" or "the Project") in the Ashanti Region of Ghana. This includes sinking a new shaft to access the historic high grade Akrokeri underground gold mine ("Akrokeri Mine" or "Mine"), one of two previously producing operations at AKHM, to enable the Company to complete a geological assessment of the Mine. The Akrokeri Mine is located approximately 6 km along strike from one of the world's major gold mines, AngloGold Ashanti's ("AngloGold") Obuasi Mine, which has a total historical and current resource in excess of 70 million ounces of gold.

 

Highlights:

· New 'Norton' shaft (the "Norton Shaft") is being sunk 40 metres east of the historic North Shaft at the Akrokeri Mine to a target depth of 30 metres

· The Norton Shaft is intended to provide

o access to the mineralised zone at the Mine, which produced 75,000 ounces of gold in the early 1900s at a recovered average grade of 24 g/t Au

o access to the old mine workings, which were fully operational until an ingress of water in 1909

o valuable geological information and allow the extraction of samples for test work

· Initiated bulk sample programme along the Homase Trend

· Commencement of an environment baseline assessment to support onward development at AKHM, ahead of intended production within two years

 

Emma Priestley, CEO of GoldStone, commented:

 

"This update is a culmination of the previous six month's work, that for the first time includes the collation and review of information from all historic exploration, drilling and mining activities across the Project, which we believe reinforces AKHM's prospectivity and upside potential.

 

"We are extremely excited by the opportunities at AKHM, including several new targets identified during the review, being the Akrokeri Mine, the potential for further pits along the Homase Trend that includes the Homase Pit, which was mined by AngloGold in 2002/3 at a recovered grade of 2.5 g/t Au, and additional parallel zones.

 

"With Ghana's Parliament recently ratifying the regulatory and fiscal agreements for the redevelopment of our neighbour, the Obuasi Gold Mine, and the issuing of their environmental permit, the attitude in Ghana towards mining is increasingly positive, reinforcing the backdrop to our strategy of rapidly advancing the Project and achieving production within two years.

 

"I am currently in Ghana with the management team, planning the next stages of our development and how to optimise the path to production to realise the intrinsic value of AKHM."

 

Accessing the Akrokeri Mine

 

The main focus of work at the Akrokeri Mine is the sinking of the Norton Shaft, which is being developed adjacent to the historic North Shaft to access the:

· historic ore body area; and

· old underground mine workings.

 

Access to the historic ore body area at the Akrokeri Mine will provide the Company with valuable geological information, enabling the Company to complete a full geological assessment of the Mine. It will also allow the Company to extract samples as part of it bulk test-work programme detailed below.

 

Access to the old mine workings will, depending on the ground conditions, also enable GoldStone to carry out geological mapping and to investigate potential ore that was not exploited by the historic miners. The Akrokeri Mine was closed in 1909 having produced 75,000 ounces of gold at a final recovered average grade of 0.73 oz/t, equivalent to approximately 24 g/t.

 

It is often the case that in historic underground mining, considerable amounts of ore were often left behind, both in-situ and also from spillage that was never cleaned up. The Akrokeri Mine is particularly interesting in this regard, due to the fact that the mine was abruptly closed following an ingress of water meaning that a mine clean-up was, in all likelihood, never executed. On that basis and assuming the gold recovery from previous workings was not 100%, the Board believe that the mined head grade at the Mine could have been greater than 24 g/t Au.

 

The Company is currently sinking the Norton Shaft, measuring 3 metres by 3 metres, to approximately 30 metres depth below surface. Timber sets are being installed in the side walls of the shaft as the sinking progresses and the shaft is being partitioned to create three compartments, the manway compartment, the services compartment and the hoisting compartment.

 

Once the shaft is at 30 metres depth below surface, a cross-cut will be developed to gain access to the historic mineralised area whilst at the same time, we will probe for any old workings/voids that may allow the safe access to the old mine workings.

 

The Norton Shaft is being sunk approximately 40 metres to the east of the existing North Shaft that is now derelict. Work at the old North Shaft is currently under way to ascertain if this shaft can be re-opened for use by Goldstone. Depending on the state of the shaft, it may be utilised as a second point of egress, for ventilation purposes and also to gain access to the old underground mine workings.

 

As at 6 July 2018, the Norton Shaft had been sunk to 20 metres depth below surface and 19 metres fully timbered and partitioned.

 

Due to the ongoing deepening of the Norton Shaft, an electric driven winch is being installed to assist with the extraction of the materials.

 

Scoping Study for Bulk Sample/Test Work

 

Since the confirmation of the > 8 km Homase Trend (announced on 20 June 2018), which runs from the Akrokeri Mine to north of the Homase pit and includes the current mineral resource of 602,000 ounces JORC classification, GoldStone has initiated a scoping study to strategically locate material to produce a sample for a bulk test-work programme. This is an important step in the Company's aim of achieving production within two years as it will assist with determining the optimum recovery process for AKHM, combining both gold recovery and cost effectiveness.

 

It is the Company's intention, once the Akrokeri Mine has been accessed, to also accumulate a bulk sample from the underground deposit for the test-work programme. Once the deposit is accessed the size of the bulk sample will be determined.

 

Environmental Base Line Study

 

GoldStone has commenced the terrestrial baseline work for the Environmental and Social Impact Study ("ESIA"). The collection of the required data is to ensure the most expedient and thorough approach to completing the AKHM's Environmental Impact Statement ("EIS") in respect of permitting. The collection stations have been mobilised and a full time ESIA Assistant has been employed. The EIS is one of the requirements for the application of the mining licences.

 

Once the baseline data is collected, GoldStone will engage in additional dialogue with the local communities to optimise AKHM's benefits and minimise the impacts associated with AKHM's construction and subsequent operations.

 

**ENDS**

 

For further information, please contact:

 

GoldStone Resources Limited

 

Emma Priestley

Tel: +44 (0)7867 785177 / +233 (0)55 581 8855

 

 

Strand Hanson Limited

 

Richard Tulloch / James Bellman

Tel: +44 (0)20 7409 3494

 

 

SI Capital Limited

 

Nick Emerson

Tel: +44 (0)1483 413 500

 

 

Citigate Dewe Rogerson

 

Louise Mason-Rutherford

Tel: +44 (0)20 7282 2932

 

 

St Brides Partners Ltd

 

Susie Geliher / Juliet Earl

Tel: +44 (0)20 7236 1177

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014.

 

About GoldStone Resources Limited

 

GoldStone Resources Limited (AIM: GRL) is an AIM quoted gold exploration and development company with projects in Ghana, Senegal and Gabon that range from grassroots to advanced exploration.

 

The Company is focused on developing the Akrokeri-Homase project in south-western Ghana, which hosts a JORC Code compliant 602,000 oz gold resource at an average grade of 1.77 g/t, along strike from the Obuasi Gold Mine, one of the world's major gold mines with a total historical and current resource in excess of 70 million ounces of gold. GoldStone's existing resource is confined to a 4 km zone of the Homase Trend, including Homase North, Homase Pit and Homase South.

 

The project hosts two former mines, the Akrokerri Ashanti Mine Ltd, which produced 75,000 oz gold @ 24 g/t recovered grade in the early 1900s, and the Homase Pit which AngloGold Ashanti developed in 2002/03 producing 52,000 oz gold @ 2.5 g/t recovered. It is the Company's intention to build a portfolio of high-quality gold projects in Ghana, with a particular focus on the highly prospective Ashanti Gold Belt.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBRGDRRGGBGIC
Date   Source Headline
27th Sep 20217:00 amRNSExercise of Warrants
20th Sep 202111:30 amRNSExtension of Gold Loan
17th Sep 20212:06 pmRNSSecond Price Monitoring Extn
17th Sep 20212:00 pmRNSPrice Monitoring Extension
17th Sep 202112:59 pmRNSExercise of Warrants
17th Sep 20217:00 amRNSOperational Update
10th Sep 202111:38 amRNSResult of AGM
2nd Sep 20217:00 amRNSExtension of Gold Loan Interest Payment
26th Aug 20212:00 pmRNSNotice of AGM
29th Jul 20218:00 amRNSExercise of Warrants
12th Jul 20217:00 amRNSOperational Update, Bond Settlement and Gold Loan
28th Jun 20217:00 amRNSFinal Results
8th Jun 20217:00 amRNSExercise of Warrants
2nd Jun 20217:00 amRNSExercise of Warrants
1st Jun 20217:30 amRNSExercise of Warrants
13th May 20217:00 amRNSCommencement of Ore Stacking & Production Schedule
15th Apr 20219:06 amRNSSecond Price Monitoring Extn
15th Apr 20219:00 amRNSPrice Monitoring Extension
15th Apr 20217:00 amRNSOperational Update
17th Mar 20217:00 amRNSUpdate on Unsecured Bond Notes
1st Mar 20217:00 amRNSGold Loan Update and Exercise of Warrants
19th Feb 20217:00 amRNSPermits Granted and Change of Broker
12th Feb 20217:00 amRNSEnvironmental Permit Granted
18th Jan 20217:00 amRNSSettlement of Claim by Former Director
18th Dec 20207:23 amRNSExercise of Warrants and Gold Loan Update
18th Dec 20207:01 amRNSExercise of Warrants and Update re Gold Loan
3rd Dec 20207:00 amRNSExpanded Mining Lease and update re Homase South
12th Nov 20207:00 amRNSOperational Update
30th Sep 20207:00 amRNSInterim Results
6th Aug 20204:40 pmRNSSecond Price Monitoring Extn
6th Aug 20204:35 pmRNSPrice Monitoring Extension
4th Aug 202012:00 pmRNSResult of AGM
17th Jul 20205:55 pmRNSNotice of AGM
17th Jul 20207:00 amRNSExtended resource drilling and updated DEP
10th Jul 20207:00 amRNSIssue of Fee Shares
30th Jun 20207:00 amRNSFinal Results
29th Jun 202012:15 pmRNSHolding(s) in Company
22nd Jun 20207:00 amRNSGold Loan Agreement Finalised
11th Jun 20202:15 pmRNSReinstatement and Restoration of Trading on AIM
11th Jun 20202:15 pmRNSRestoration - Goldstone Resources Limited
30th Apr 20208:30 amRNSCorporate Update
8th Apr 20203:07 pmRNSSuspension of Trading
8th Apr 20201:30 pmRNSSuspension - Goldstone Resources Limited
16th Mar 20207:00 amRNSFunding of up to US$4.3m to commence production
14th Feb 20203:01 pmRNSMining Lease Awarded
20th Nov 20197:00 amRNSMinisterial Approval for Mining Lease
23rd Sep 20197:00 amRNSInterim Results
20th Sep 20197:00 amRNSUpdated Company Presentation
2nd Sep 20197:00 amRNSDirectorate Change
6th Aug 20192:00 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.