The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.20
Bid: 1.15
Ask: 1.25
Change: 0.00 (0.00%)
Spread: 0.10 (8.696%)
Open: 1.20
High: 1.20
Low: 1.20
Prev. Close: 1.20
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Star Zinc Project Update

15 Oct 2018 07:00

RNS Number : 9593D
Galileo Resources PLC
15 October 2018
 

 

 

For immediate release

15 October 2018

Galileo Resources Plc

("Galileo" or "the Company")

Star Zinc Project - Phase-2 Drilling Programme Update

Galileo, further to its announcement of 14 August 2018, is pleased to announce completion of its phase-2, 1000metre (m) diamond-drilling programme and reports on the preliminary (a) independent assay results ("Preliminary Results") from for an initial 8 diamond drill holes (Initial DDHs) on its highly prospective 80.75%-owned Star Zinc Project ("Star Zinc") in Zambia.

 

Highlights

 

· Completed the phase-2 drilling programme comprising 24 diamond drill holes (DDHs) totalling approximately 1000m to depths, from surface, of between 25m and 105m downhole

 

· Preliminary Results from four of the Initial DDHs - predominantly from the eastern body of the deposit- intersected high-grade mineralisation of between 14% Zn and 26% Zn and good widths. The other five of the initial DDHs intersected grades and widths similar to those reported in phase 1

 

· SZDD030 1 intersected 15.46% Zn over 23m downhole (from 14m to 37m) including 26.21 %Zn over 12m downhole (from 21m to 33m)

 

· SZDD032 intersected 14.32%Zn over 12m downhole (from 10m to 22m) including 22.69% Zn over 7 m downhole (from 12m to 19m)

 

· SZDD034 intersected 9.38% Zn over 5m downhole (from 11.5 m to 17 m) including 23.1% Zn over 2m downhole

· SZDD036 intersected 6.37% Zn over 13m downhole (from 13m to 26m) including 23.59% Zn over 3m downhole (from 18m to 21m)

 

· Elevated germanium (Ge) assays of up to 45 ppm recorded; generally being associated generally with high-grade zinc values

 

· Furthermore, portable hand-held XRF spectrometry ("pXRF") results (b) on a further 9 of 11 DDHs 2,3 (mainly from the western body of the deposit), showed significantly more persistent higher pXRF Zn grades ranging from 12% Zn to 40.4.5% Zn and widths of up to 19m downhole (see table 2 below)

· The transfer to Galileo of the 15% interest (indirectly 14.25% in the Star Zinc project) in Enviro Zambia Ltd. (EZL), currently not held by Galileo, is progressing pursuant to the agreement announced on 13 September 2018. On transfer Galileo will hold 95% and the Government 5% of Star Zinc

 

· The Company intends to develop, as soon as practicable, a work programme with the objective of meeting the requirements for the application of a small scale mining licence for Star Zinc

 

1 western side of open pit

2 still to be independently assayed

3 2 DDHs with no significant mineralisation

(a) subject inter alia to Quality Assurance -Quality Control assessment

 (b) average of regular spaced point readings (3 times) over the mineralised intersection. Whole length core samples will be submitted for independent and complete assay and will be announced in due course

 

The two phases of drilling, are believed to have defined the general limits on mineralisation on the currently targeted resource area, though there are still potential additional drilling targets, which may be warranted to test later, subject to resource/optimisation/financial modelling. These targets include several geophysical gravity highs, outcropping hematite bodies and beyond the fringes of defined mineralisation, south east of which, for example holes SZDD034 reported 5.5m @ 9.4% Zn from 11.5m and SZDD036, 13m @ 6.7% from 13m.

 

Licence

 

Star Zinc's large-scale exploration licence 19653-HQ-LEL was renewed on 24 August 2018 for a further three years.

 

Colin Bird, Chief Executive Officer, said: "This has been an extremely satisfactory drilling program, which has effectively delineated the mineralisation limits of the current targeted resource area. Good results have been obtained in both the eastern and western "ore" bodies, with the latter suggesting significantly higher grades than in the east. We believe we have extended the zone of mineralisation from that reported previously and expect, on incorporating these latest boreholes in the current model, to show an increase in contained metal. The previously announced programme objectives (April and May 2018) have been achieved. We did not pursue, to any extent, identifying a possible feeder source because the programme, as it developed, was directed, amongst other things to focus on defining the parameters necessary for an open pit design. Our understanding of Star Zinc's geology and controls has increased. We intend now to proceed to scoping study stage to include resource modelling of the data and an initial pit design. The Company believes it has adequately delineated a resource to design an open pit and generate a maiden JORC compliant resource estimate. The Company has engaged an independent consultant to undertake this exercise. When the Company entered into the Term Sheet agreement to acquire Star Zinc (31 August 2017), it undertook that on proven success it would provide ore feed for the Kabwe zinc project. An offtake agreement to this effect is under discussion and negotiation."

 

 

Table 1 Initial independent assay drilling results (C)

 

Hole_ID SZDD

From (m)

To (m)

Width (m)

Zn_ %

Ge_ ppm

Ag _ppm

029

3

4

1

0.51

0.5

11

 

7

8

1

0.43

2

13

 

12

13

1

0.41

1

6

 

 

 

 

 

 

 

030

0

10

10

4.27

6.45

6.8

030

14

37

23

15.47

14.39

4.39

 

21

33

12

26.21

23.16

5.25

 

 

 

 

 

 

 

031

0

2

2

0.45

2

4.5

031

5

30

25

2.98

1.92

8.96

031

18

19

1

10.78

8

33

 

 

 

 

 

 

 

032

0

5

5

0.46

2.8

3.8

032

10

22

12

14.32

14.96

16.66

032

12

19

7

22.69

24.28

22.14

 

 

 

 

 

 

 

033

0

12

12

1.4

2.625

6.08

 

 

 

 

 

 

 

034

11.5

17

5.5

9.38

9.55

8.18

034

13

15

2

23.1

23

7.5

 

 

 

 

 

 

 

035

16

21

5

2.4

0.5

2.75

 

 

 

 

 

 

 

036

0

1

1

1.45

3

3

036

7.4

8.65

1.25

0.97

2

12

036

13

26

13

6.7

11.05

18.69

036

18

21

3

23.59

45.4

12.66

 

 

 

 

 

 

 

027

No significant intersection

028

No significant intersection 

 

(C) Analysis by Accredited Intertek Genalysis Laboratory Services: Zn and Ge by peroxide fusion finish with ICP-OES/MS; Ag by 4-Acid digestion with MS. Analyses subject QA/QC quality assurance/checks

 

Table 2 pXRF drilling results (d) for holes that intersected mineralisation (subject to independent assay)

 

Hole ID

SZDD

EOH (e)

(m)

From(m)

To(m)

Drill Width (m)

pXRF_Zn%

 

 

 

 

 

 

038

56.7

35

52

16

11.8

038

56.7

35

45

10

18

 

 

 

 

 

 

039

62.7

36

52

16

15.44

039

62.7

44

51

7

29.18

 

 

 

 

 

 

040

44.9

23

41

18

21.88

040

44.9

25

38

13

29

 

 

 

 

 

 

041

55

14

21

7

5.4

041

55

34

49

15

18.26

041

55

36

47

11

24.3

 

 

 

 

 

 

042

38.9

0

7

7

1.35

042

38.9

24

31

7

15.5

 

 

 

 

 

 

043

35.7

15

28

13

16.50.

043

35.7

19

24

5

40.3

 

 

 

 

 

 

044

38.6

30

32

2

14.72

044

38.6

30.86

32

1.14

26.81

 

 

 

 

 

 

045

44.6

17

20

3

18.8

 

 

 

 

 

 

048

51.7

30

49

19

26.63

048

51.7

31

47

16

31.51

 

(d) average of regular spaced point readings (3 times) over the mineralised intersection . Whole length ¼ core samples will be submitted for independent and complete assay and will be announced in due course

(e) EOH - end of hole

 

Note pXRF Zn Determinations:

2-3 Single Point Determinations on 1m of Whole Core Averaged

No lower cut-off grade applied

No high grade cut off applied

Minimum Intersection drilled width of 3m

Internal dilution not considered

No Criteria Applied

Represent a Relevant 'Total Mineralised Interval'

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

Technical Sign-Off

 

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014

 

You can also follow Galileo on Twitter: @GalileoResource

 

For further information, please contact: Galileo Resources PLC

 

Colin Bird, Chairman

Andrew Sarosi, Executive Director

+44 (0) 20 7581 4477

+44 (0) 1752 221937

Beaumont Cornish Limited - Nomad

Roland Cornish/James Biddle

+44 (0) 20 7628 3396

Novum Securities Limited - Joint Broker

Colin Rowbury /Jon Belliss

+44 (0) 20 7399 9400

 

Star Zinc

The Star Zinc project "(Project") is a historical small-scale open pit mine from where, reportedly, low tonnage, but high-grade willemite (a zinc silicate mineral) was extracted intermittently in the 1950s to 1990s.

 

The Project is located approximately 18km NNW of Lusaka (see Figure 3.1 below), and is accessible via the tarred "Great North Road" and a good all weather graded road, with the journey time from central Lusaka of approximately 30 minutes (traffic allowing).

 

There is adequate power, water, rail & telecommunications, with the International Airport at Lusaka, less than 45 minutes away.

 

The Mines and Minerals Development Act, No 11 of, 2015, which grants a Large Scale Exploration Licence (LSEL), governs the mineral tenement. The Act provides for an initial 4 years with a further two 3-year extensions totalling 10 years, with a mandatory 50% reduction of licence area at the completion of the 1st grant and 2nd grant periods respectively. The first renewal period initially expired 13 August 2016 but was extended to 13 August 2018. The LSEL was renewed on 24 August 2018 for a further 3 years.

 In the 1960s, geologists of the Northern Rhodesia (now Zambia) Geological Survey mapped the Project.

 

At Star Zinc, two main fracture trends are present, one E - W, and another N - S. Both set of fractures are nearly vertical and are irregularly mineralised. Willemite generally replaces the host rock marbles in the form of massive ore bodies, but it occurs also in veins

 

In addition, karstic (pertaining to landscape underlain by limestone which has been eroded by dissolution, producing ridges, fissures, sinkholes and other characteristic landforms) mineralisation and red soils (terra rossa) are locally heavily mineralised with detrital willemite and supergene zinc minerals. Zinc values measured in soils at Star Zinc reach up to 15,600 ppm and are accompanied by the pathfinder elements Ag (silver), Pb (lead), Ba (barium), Sb (antimony) and Cd (cadmium). The karst infill has a zinc (Zn) content up to 45wt.% Zn, up to 35wt.% Fe and up to 5g/t Ag.

 

The mineralogical assemblage of Zn non sulphides  includes a whole number of minerals:  the main economic phases present are Zn-silicates (willemite, hemimorphite, Zn-bearing clays), Zn- Pb carbonates (smithsonite, cerussite), hydrated Zn- Pb carbonates (hydrozincite, hydrocerussite) and Zn- Mn- Fe- oxides (zincite, franklinite, gahnite).

 

Limited independent metallurgical testwork by others has clearly shown that the willemite present at Star Zinc is amenable to acid leaching with positive results for two samples tested. Zinc leaching efficiencies obtained ranged from 89% and 92%. The testwork indicated polymerisation of dissolved silica in the leachate.

 

In summary, Star Zinc has good potential to become a viable project.

 

Note: the information about Star Zinc is sourced primarily from Competent Person's Report for the Star Zinc Project, Zambia; Wardell Armstrong, January 2016

 

Glossary

Detrital loose fragments or grains that have been worn away from rock

Calcite mineral of calcium carbonate

Dolomite mineral composed of calcium magnesium carbonate

Dolomitic pertaining to dolomite  

Floats pieces of rock that have been removed and transported from their original outcrop

Germanium (Ge) semi metal element commonly used in the semiconductor industry, wide-angle camera lenses and fibre optics. 

Hematite reddish-black mineral consisting of ferric oxide. It is an important ore of iron.

ICP-OES/MS inductively coupled plasma - optical emission spectrometry/mass spectrometry

Karst landscape underlain by limestone (calcium carbonate), which has been eroded by dissolution, producing ridges, fissures and so on

Karstic pertaining to karst

 

Leaching chemical process of solubilising metals in rock into solution

ppm parts per million

XRF Spectrometer analytical instrument for determining chemical composition using x-ray fluorescence spectrometry

 

Supergene pertaining to processes or enrichment that occurs relatively near surface 

Willemite zinc silicate ore mineral

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUUANRWUARAAA
Date   Source Headline
8th Aug 20171:00 pmRNSConcordia Project Update
7th Aug 20179:08 amRNSHolding(s) in Company
6th Jul 20178:54 amRNSGlenover Project Update
26th Jun 20174:17 pmRNSConcordia Project Update
12th Jun 20172:12 pmRNSGlenover Phosphate - Pilot Plant Study Proposal
15th May 201710:54 amRNSConcordia Copper Project Update
12th May 20173:17 pmRNSUpdate regarding Orogen Gold JV on Silverton
24th Mar 20175:54 pmRNSUpdate regarding Orogen Gold JV on Silverton
1st Mar 201711:07 amRNSGeneral Update
15th Feb 20177:00 amRNSConcordia Copper Project - Drilling Commencement
9th Feb 201710:30 amRNSHolding(s) in Company
27th Jan 20175:07 pmRNSIssuance of Share Options
17th Jan 20179:39 amRNSConcordia Copper Project Update
9th Jan 20177:00 amRNSSilverton Project Update
20th Dec 20162:43 pmRNSHalf-year Report
19th Dec 20163:08 pmRNSChange of Registered Office
15th Dec 201611:07 amRNSConcordia Copper Project - Exploration Update
30th Nov 20169:04 amRNSConcordia Copper Project - update
1st Nov 20167:00 amRNSConcordia Copper Project Update
25th Oct 20167:00 amRNSNevada Projects Update
29th Sep 201612:29 pmRNSResult of AGM
7th Sep 20161:55 pmRNSFinal Results and Notice of AGM
7th Sep 20167:00 amRNSConcordia Project Update
31st Aug 20161:25 pmRNSSale of Gabbs Gold-Copper Property for US$2.5 m
30th Aug 201612:14 pmRNSLapsing of Agreement to sell interest in JV
30th Aug 20167:00 amRNSSale of Gabbs Gold-Copper Property for US$ 2 mill
22nd Aug 201612:40 pmRNSStudy increases Concordia potential size
27th Jun 20167:00 amRNSGalileo executes Silverton Farm-Out Agreement
15th Jun 20169:05 amRNSUpdate on Concordia Copper Project
10th May 201611:24 amRNSConcordia Project Update
4th May 201612:14 pmRNSTotal Voting Rights
27th Apr 20167:00 amRNSConcordia Copper Mineralisation
21st Apr 20162:00 pmRNSNevada Gold-Silver Deal Signed
21st Apr 20162:00 pmRNSSilverton Project Farm-Out
13th Apr 20169:43 amRNSConcordia Project initial independent modelling
5th Apr 20162:16 pmRNSIssue of Equity
4th Apr 201611:48 amRNSTotal Voting Rights
29th Mar 20161:41 pmRNSConcordia Project initial independent modelling
1st Mar 20162:56 pmRNSIssue of Equity, Directors' Dealings and TVR
26th Feb 20163:51 pmRNSExtension of Agreement to sell interest in JV
14th Jan 20169:06 amRNSConclusion of Concordia JV Agreement
4th Jan 20169:34 amRNSTotal Voting Rights
17th Dec 201512:01 pmRNSIssue of Equity
15th Dec 201512:50 pmRNSHalf Yearly Report
1st Dec 20154:39 pmRNSHolding(s) in Company
17th Nov 20157:00 amRNSCopper Project - Earn-in Option Signed
9th Nov 20151:26 pmRNSHolding(s) in Company
19th Oct 20157:00 amRNSCompany Update
30th Sep 201512:34 pmRNSResult of AGM
7th Sep 20155:14 pmRNSAudited Results and Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.