Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.15
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Star Zinc Project Update

6 Nov 2017 07:00

RNS Number : 5902V
Galileo Resources PLC
06 November 2017
 

 

 

 

 

 

 

For immediate release

 

6 November 2017

Galileo Resources Plc

("Galileo" or "the Company")

Star Zinc Project Update

Highlights

· Galileo appoints Africa Technical Consultants Limited ("ATC") to assist with and provide services for an environmental and exploration programme ("EP") for the Star Zinc Project ("Project") in Zambia

 

· The EP environmental scope will involve an environmental update including engaging and meeting with interested parties in preparation for collecting of soil samples and a drilling programme in due course

 

· Soil sampling with portable XRF (x-ray fluorescence) spectrometry will be carried out on a 400m x 200m grid pattern covering the accessible and exploitable areas of the licence

 

· Estimated EP and assessment duration is six weeks

 

Colin Bird CEO said, "We have completed a review of the project and now have much greater confidence in being able to enlarge the size of the estimated pit. Furthermore, we believe that there now exists considerable potential for other zinc mineralisation types in the deposit and we will aggressively pursue this concept. On completion of this programme and its assessment, we will design a drill programme aimed at confirming the current resource estimate and testing the project's prognosis for an enlarged resource. During this concept phase we will also investigate the potential for a possible sulphide feeder origin for the current willemite and other non-sulphide zinc mineralisation in and around the pit." 

Galileo (AIM:GLR) is pleased to announce it has appointed Africa Technical Consultants Limited ("ATC") to assist with and provide services for a fast track exploration programme for its Star Zinc Project in Zambia . This is the first step in the Company's objective (previously announced 4 October 2017) to initiate a fast track drilling programme in order to upgrade the Projects current non-compliant resource and to test the potential to increase the resource size.

This programme envisages, initially twin-hole drilling in the current non-compliant resource in order to upgrade it to JORC code (2012) compliance, followed by new drilling to test the potential to extend the high grade resource east and west and in new ground to the south. The occurrence of high grade (>50% Zn) float (pieces of rock that have been removed and transported from their original outcrop) 200m south of the current open pit presents an exciting prospective new target for mapping and exploration.

Environmental and Exploration Programme

The scope of the environmental work will include, as part of the environmental update and mining regulatory requirements, engaging and meeting with local communities, authorities, Chiefs and farm owners with regard to the Company's exploration programme for collecting of soil samples over all the accessible exploitable areas of the Licence and drilling in due course; the latter within an approximate 500m radius of the Projects' deposit itself.

Soil Sampling and Analysis Programme

Licence scale soil sampling will collect soil samples on a 400m x 200m N-S grid lines and rapidly analysed on site utilising portable XRF (x-ray fluorescence) spectrometry. Initial work will include recording of pertinent sampling site details as well as any obvious feature (geological and other) of interest. The data obtained will be used to re-look, re-model and re-interpret historical soil geochemical data collected by others over part of the Southern portion of the Licence.

Star Zinc Project

The Company recently acquired a 51% interest in the Star Zinc project, a historical, high-grade zinc ("Zn") open pit mine operated intermittently in the 1950s to 1990s. The Zn mineral is predominantly willemite (zinc silicate) hosted in mainly limestone and dolostone (dolomitic rock).

An Independently verified non-JORC compliant hard rock resource has been estimated at 275,166 tonnes @ 20.2% Zn with a cut-off grade of 14% Zn ("pragmatic case") based on historical approximately 59 diamond drill holes for total 2 578m. At cut off grade of 12% Zn non-JORC resource tonnage increases (18%) to 325,941 tonnes @19.1% Zn (11% increase in Zn metal).

In addition, karstic fill deposits and red soil are locally heavily mineralised with detrital willemite and supergene zinc minerals, which may provide further potential increase to the known resource.

Mineralisation is interpreted to form two shallowly dipping lenses east and west of the open pit, mineralisation of which is around 40m deep, based on the independent model used for the resource calculation.

A number of sub vertical structures recognised in pit outcrop suggests possibility of both vertical and horizontal control of Zn mineralisation.

The Willemite at Star Zinc, fluoresces a bright green in short wave UV light, a mineral characteristic that may find an application in optical sorting. Willemite also, is denser (3.9 g/cm3) than the dolomitic (2.9 g/cm3) host rock, a feature that may find an application in heavy medium separation process, with the potential for reducing the acid consuming dolomite in the ore.

Preliminary metallurgical testwork indicates that the ore is amenable to acid leaching with more than 90% of the zinc leached into solution.

The Company has committed to undertake an 18-month work programme ("Programme") at a cost of US$250,000 using reasonable endeavours to complete a preliminary economic assessment of Star Zinc ("PEA"), following which further new shares in Enviro Zambia, the owner of the Project will be issued to Galileo to increase its aggregate equity interest in therein to 85%; accordingly it expects the Programme to meet this obligation.

Glossary

Detrital loose fragments or grains that have been worn away from rock

Dolomite mineral composed of calcium magnesium carbonate

Dolomitic pertaining to dolomite  

Floats pieces of rock that have been removed and transported from their original outcrop

Karstic pertaining to landscape underlain by limestone (calcium carbonate), which has been eroded by dissolution, producing ridges, fissures and so on

Leaching chemical process of solubilising metals in rock into solution

Supergene pertaining to processes or enrichment that occurs relatively near the surface 

Willemite zinc silicate mineral

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

Technical Sign-Off

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

You can also follow Galileo on Twitter: @GalileoResource

For further information, please contact:

Galileo Resources PLC

Colin Bird, Chairman

Andrew Sarosi, Executive Director

Tel +44 (0) 20 7581 4477 

 

Tel +44 (0) 1752 221937

 

 

Beaumont Cornish Limited - Nomad 

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

 

 

Beaufort Securities Limited - Broker

Jon Bellis/Elliot Hance

Tel +44 (0) 20 7382 8416

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDUVRRRBWAARUA
Date   Source Headline
2nd May 20249:52 amRNSReceipt of cash payment for Glenover sale
23rd Apr 20245:04 pmRNSDirector's Dealings
19th Mar 20247:00 amRNSKamativi Lithium-Tin Project – Drill Assay Results
29th Feb 20247:00 amRNSUpdate on 51% interest in Lithium & Gold Projects
1st Feb 20247:00 amRNSNew Targets Defined on PL039/2018 and PL040/2018
30th Jan 20247:00 amRNSThree Copper Targets Discovered on PL253/2018
28th Dec 20233:18 pmRNSHalf-year Report
8th Nov 20233:29 pmRNSResult of AGM
7th Nov 20237:00 amRNSAppointments to Galileo Technical Team
7th Nov 20237:00 amRNSZambia Drilling Cuts Wide Mineralised Breccia Zone
17th Oct 20237:00 amRNSKamativi Project Update
11th Oct 20237:00 amRNSExploration and Projects Update
4th Oct 202311:02 amRNSTotal Voting Rights
29th Sep 202310:38 amRNSFinal Results
20th Sep 20237:00 amRNSExploration Update at Shinganda, Zambia
5th Sep 20231:46 pmRNSZambian Exploration Licence joint venture
21st Aug 20234:43 pmRNSUpdate on Lithium Discovery - Kamativi Project
10th Aug 20237:00 amRNSNew lithium discovery in Kamativi initial drilling
24th Jul 20237:00 amRNSWide Pegmatite Intercepts at Kamativi Project
20th Jul 20237:00 amRNSChange of auditor
29th Jun 20237:00 amRNSDelineation of Gold Targets at Bulawayo Project
27th Jun 20237:00 amRNSJoint Venture Option exercised at Shinganda
23rd Jun 20237:00 amRNSUpdate on Afrimat Option to acquire Glenover
15th Jun 20237:00 amRNSDrill Programme over Kamativi Lithium Project
15th May 20237:00 amRNSExploration Developments over KCB Licences
29th Mar 20237:00 amRNSKalahari Copper Belt - Exploration Update
23rd Mar 20237:00 amRNSKamativi Lithium Project – New Discoveries
22nd Mar 20237:00 amRNSUpdate on Glenover sale and Bulawayo Gold Project
9th Feb 20237:00 amRNSJORC 2012 Inferred MRE for the Luansobe Project
2nd Feb 20237:00 amRNSExploration Results from wider area at Shinganda
18th Jan 20237:00 amRNSFurther Drilling Extends Shinganda Project
30th Dec 202211:46 amRNSInterim Results
30th Dec 202210:00 amRNSInterim Results
8th Dec 20227:00 amRNSKamativi Lithium Project - Exploration Update
30th Nov 20227:00 amRNSDelineation of Gold and Nickel Targets at Bulawayo
28th Nov 20229:54 amRNSIssuance of share options
23rd Nov 202210:00 amRNSCompletion of Drilling at Luansobe Project
1st Nov 20227:00 amRNSUpdate on Fieldwork on Targets at Bulawayo Project
25th Oct 20221:46 pmRNSHolding(s) in Company
20th Oct 20227:00 amRNSUpdate on Afrimat Option regarding Glenover
13th Oct 20222:30 pmRNSResult of AGM
3rd Oct 20222:53 pmRNSAcquisition of 29% shareholding in BCV
21st Sep 202212:00 pmRNSFinal Results
26th Aug 20229:12 amRNSDiscovery of Nickel Targets at Bulawayo Project
16th Aug 202212:46 pmRNSBulawayo Gold - surveys and target selection
10th Aug 202212:45 pmRNSAgreement to acquire further interest in BCV
8th Aug 20222:05 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20227:00 amRNSCommencement of drilling at the Luansobe Project
28th Jul 202210:35 amRNSIssue of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.