The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Star Zinc - New Drilling Programme Commences

14 Aug 2018 07:00

RNS Number : 6642X
Galileo Resources PLC
14 August 2018
 

 

 

For immediate release

 

14 August 2018

Galileo Resources Plc

("Galileo" or "the Company")

Star Zinc Project - New Drilling Programme Commences

Galileo is pleased to announce the commencement of a 2nd diamond-drilling programme (Programme) on its highly prospective 85%-owned Star Zinc Project ("Star Zinc") in Zambia.

Highlights

 

· The Programme is scheduled for about 1000 metres (m) of diamond core drilling to depths of up to 80m, with average depth likely to be around 60 m

· Drilling will initally target areas that are open ended east-north-east and south-east of the known mineralised zone, which previously modelled conceptual grade tonnage (CGT) estimate (announced 4 June 2018) highlighted as having the exploration potential to extend

· Drilling will also target several nearby, "bulls-eye" high-gravity geophysics anomalies. An independent review of Star Zinc's historical geophysics data showed good correlation of gravity anomalies with the mineralisation intersected in the 1st drilling (or Initial) programme (announced 23 July 2018)

· Drilling is expected to be completed during Otober and the Company will provide regular udpates on core appearance, portable XrF spectrometry indications and actual laboraory assays consistent with that adopted in the Intitial programme

 

Colin Bird, Chief Executive Officer, said: "The Initial programme confirmed the presence of very high grade williemite (up to 38% Zn) adjacent to the collapsed ("pit") area in the mineralised zone with extensions to the east and west of this area. The Initial programme highlighted the presence of lower but still relatively high zinc values in the karstic material. 3D-modelling defined the presence and orientation of the two types of mineralisation We believe that this Programme should extend the known ore zone to the east and potentially identify near-surface mineralisation in areas highlighted by the geophysics review.

The overall assessment showed further, the presence of heightened lead values in the deposit. This is recognised, academically, as a marker for the potential of a nearby feeder source for mineralisation. The Company, depending on results, may test this theory for the presence of a deeper feeder source during this Programme.

Star Zinc has the potential for a stand-alone project as well as a supplier of run-of-mine ore for the Kabwe project.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

Technical Sign-Off

 

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014

 

You can also follow Galileo on Twitter: @GalileoResource

 

For further information, please contact: Galileo Resources PLC

 

Colin Bird, Chairman

Andrew Sarosi, Executive Director

Tel +44 (0) 20 7581 4477

Tel +44 (0) 1752 221937

Beaumont Cornish Limited - Nomad & Joint Broker

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

Novum Securities Limited - Joint Broker

Colin Rowbury /Jon Belliss

+44 (0) 20 7399 9400

 

The Star Zinc Project

The Star Zinc project is a historical small-scale open pit mine from where, reportedly, low tonnage, but high grade willemite (a zinc silicate mineral) was extracted intermittently in the 1950s to 1990s.

 

The Star Zinc project is located approximately 18km NNW of Lusaka (see Figure 3.1 below), and is accessible via the tarred "Great North Road" and a good all weather graded road, with the journey time from central Lusaka of approximately 30 minutes (traffic allowing).

 

There is adequate power, water, rail & telecommunications, with the International Airport at Lusaka, less than 45 minutes away.

 

The Mines and Minerals Development Act No. 7 of 2008, which grants a Large Scale Prospecting Licence for a maximum of 7 years, governs the mineral tenement. Recent changes to the Act now provides for an initial 4 years with a further two 3-year extensions totalling 10 years, with a mandatory 50% reduction of licence area at the completion of the 1st grant and 2nd grant periods respectively. The first renewal period initially expired 13 August 2016 but was extended to 13 August 2018. The Company has submitted an application for the next renewal period.

 

The Star Zinc Willemite project was mapped in the 1960s by several geologists of the Northern Rhodesia (now Zambia) Geological Survey.

 

At Star Zinc, two main fracture trends are present, one E - W, and another N - S. Both sets of fractures are nearly vertical and are irregularly mineralised. Willemite generally replaces the host rock marbles in the form of massive ore bodies, but it occurs also in veins

 

In addition, karstic (pertaining to landscape underlain by limestone which has been eroded by dissolution, producing ridges, fissures, sinkholes and other characteristic landforms) mineralisation and red soils (terra rossa) are locally heavily mineralised with detrital willemite and supergene zinc minerals. Zinc values measured in soils at Star Zinc reach up to 15,600 ppm and are accompanied by the pathfinder elements Ag (silver), Pb (lead), Ba (barium), Sb (antimony) and Cd (cadmium). The karst infill has a zinc (Zn) content up to 45wt.% Zn, up to 35wt.% Fe and up to 5g/t Ag.

 

The mineralogical assemblage of Zn nonsulphides includes a whole number of minerals, but the main economic phases present are Zn-silicates (willemite, hemimorphite, Zn-bearing clays), Zn- Pb carbonates (smithsonite, cerussite), hydrated Zn- Pb carbonates (hydrozincite, hydrocerussite) and Zn- Mn- Fe- oxides (zincite, franklinite, gahnite).

 

Limited independent metallurgical testwork by others has clearly shown that the willemite present at Star Zinc is amenable to acid leaching with positive results for two samples tested. Zinc leaching efficiencies obtained ranged from 89% and 92%. The testwork indicated polymerisation of dissolved silica in the leachate.

 

An independent competent person's report commissioned by BMR concluded. In summary, the Star Zinc project has good potential to become a viable project.

 

Note: the information about Star Zinc is sourced primarily from Competent Person's Report for the Star Zinc Project, Zambia; Wardell Armstrong, January 2016

 

Glossary

Detrital loose fragments or grains that have been worn away from rock

Calcite mineral of calcium carbonate

Dolomite mineral composed of calcium magnesium carbonate

Dolomitic pertaining to dolomite  

Floats pieces of rock that have been removed and transported from their original outcrop

Hematite reddish-black mineral consisting of ferric oxide. It is an important ore of iron.

ICP-OES/MS inductively coupled plasma - optical emission spectrometry/mass spectrometry

Karst landscape underlain by limestone (calcium carbonate), which has been eroded by dissolution, producing ridges, fissures and so on

Karstic pertaining to karst

 

Leaching chemical process of solubilising metals in rock into solution

ppm parts per million

XRF Spectrometer analytical instrument for determining chemical composition using x-ray fluorescence spectrometry

 

Supergene  pertaining to processes or enrichment that occurs relatively near surface 

Willemite zinc silicate ore mineral

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKNDKABKDOFD
Date   Source Headline
2nd May 20249:52 amRNSReceipt of cash payment for Glenover sale
23rd Apr 20245:04 pmRNSDirector's Dealings
19th Mar 20247:00 amRNSKamativi Lithium-Tin Project – Drill Assay Results
29th Feb 20247:00 amRNSUpdate on 51% interest in Lithium & Gold Projects
1st Feb 20247:00 amRNSNew Targets Defined on PL039/2018 and PL040/2018
30th Jan 20247:00 amRNSThree Copper Targets Discovered on PL253/2018
28th Dec 20233:18 pmRNSHalf-year Report
8th Nov 20233:29 pmRNSResult of AGM
7th Nov 20237:00 amRNSAppointments to Galileo Technical Team
7th Nov 20237:00 amRNSZambia Drilling Cuts Wide Mineralised Breccia Zone
17th Oct 20237:00 amRNSKamativi Project Update
11th Oct 20237:00 amRNSExploration and Projects Update
4th Oct 202311:02 amRNSTotal Voting Rights
29th Sep 202310:38 amRNSFinal Results
20th Sep 20237:00 amRNSExploration Update at Shinganda, Zambia
5th Sep 20231:46 pmRNSZambian Exploration Licence joint venture
21st Aug 20234:43 pmRNSUpdate on Lithium Discovery - Kamativi Project
10th Aug 20237:00 amRNSNew lithium discovery in Kamativi initial drilling
24th Jul 20237:00 amRNSWide Pegmatite Intercepts at Kamativi Project
20th Jul 20237:00 amRNSChange of auditor
29th Jun 20237:00 amRNSDelineation of Gold Targets at Bulawayo Project
27th Jun 20237:00 amRNSJoint Venture Option exercised at Shinganda
23rd Jun 20237:00 amRNSUpdate on Afrimat Option to acquire Glenover
15th Jun 20237:00 amRNSDrill Programme over Kamativi Lithium Project
15th May 20237:00 amRNSExploration Developments over KCB Licences
29th Mar 20237:00 amRNSKalahari Copper Belt - Exploration Update
23rd Mar 20237:00 amRNSKamativi Lithium Project – New Discoveries
22nd Mar 20237:00 amRNSUpdate on Glenover sale and Bulawayo Gold Project
9th Feb 20237:00 amRNSJORC 2012 Inferred MRE for the Luansobe Project
2nd Feb 20237:00 amRNSExploration Results from wider area at Shinganda
18th Jan 20237:00 amRNSFurther Drilling Extends Shinganda Project
30th Dec 202211:46 amRNSInterim Results
30th Dec 202210:00 amRNSInterim Results
8th Dec 20227:00 amRNSKamativi Lithium Project - Exploration Update
30th Nov 20227:00 amRNSDelineation of Gold and Nickel Targets at Bulawayo
28th Nov 20229:54 amRNSIssuance of share options
23rd Nov 202210:00 amRNSCompletion of Drilling at Luansobe Project
1st Nov 20227:00 amRNSUpdate on Fieldwork on Targets at Bulawayo Project
25th Oct 20221:46 pmRNSHolding(s) in Company
20th Oct 20227:00 amRNSUpdate on Afrimat Option regarding Glenover
13th Oct 20222:30 pmRNSResult of AGM
3rd Oct 20222:53 pmRNSAcquisition of 29% shareholding in BCV
21st Sep 202212:00 pmRNSFinal Results
26th Aug 20229:12 amRNSDiscovery of Nickel Targets at Bulawayo Project
16th Aug 202212:46 pmRNSBulawayo Gold - surveys and target selection
10th Aug 202212:45 pmRNSAgreement to acquire further interest in BCV
8th Aug 20222:05 pmRNSSecond Price Monitoring Extn
8th Aug 20222:00 pmRNSPrice Monitoring Extension
4th Aug 20227:00 amRNSCommencement of drilling at the Luansobe Project
28th Jul 202210:35 amRNSIssue of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.