Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksG3 Exploration Regulatory News (G3E)

  • This share is currently suspended. It was suspended at a price of 27.40
  • There is currently no data for G3E

Operations Update

26 Jul 2016 07:00

RNS Number : 2155F
Green Dragon Gas Ltd
26 July 2016
 

26 July 2016

GREEN DRAGON GAS LTD.

("Green Dragon" or the "Company")

Operations Update

Green Dragon Gas Ltd. (LSE: GDG), one of the largest independent companies involved in the production and sale of Coalbed Methane ("CBM") gas in China, is pleased to announce an operations update for the six-months ended 30 June 2016.

In H1 2016 Green Dragon has continued to focus on the implementation of its infrastructure programme aimed at increasing gas processing and sales capacity from its existing drilled wells. The programme is concentrating on the connection of existing drilled wells to sales infrastructure together with the installation of significant additional compression across the production circuits. By increasing and rebalancing the compression installed across the production circuits, the Company is seeking to lower wellhead pressure resulting in significantly increased gas recoveries from existing wells.

Operational highlights

· GSS H1 2016 sales volume up 62% and 43% versus H1 and H2 2015 respectively

· Reached a H1 2016 sales peak of 6.0mmcf/day (170,000m3/day) at GSS, an increase of 18% compared to 31 December 2015

· Continued focus on infrastructure and compression across the GSS production circuits

· First screw compressor installed at GSS in April 2016, allowing wellhead pressure to be taken to vacuum,resulting in an increase in gas sales of 45% from the well

· Run-time efficiency of compressors at GSS of 87% in H1 2016 with average uptime of 93% recorded through June 2016

· The Company reiterates its exit rate production capacity target of 16 bcf for year end 2016

Randeep S. Grewal, Chairman and Founder of Green Dragon, commented:

"I am pleased with the continued progress we have made in the first half of 2016 in relation to infrastructure and creating the foundation for continued increases in sales volumes from the existing well stock. We have demonstrated the potential of our wells by consistently delivering increased sales volumes and with our focus on compression and production infrastructure we expect this to continue through the end of 2016 and into 2017. Our final challenge on our large GSS project is increasing gas sales by reducing casing pressure at the well bore on the currently drilled well stock where production capacity is significantly higher than the current gas sales. I am satisfied with the first well head screw compressor installed on well GSS188, which has resulted in the 45%increase in its gas sales. As the proof of concept has been successful, we can now focus on repeating the same technological improvement on the rest of the well stock.

"This year marks the Company's 10th anniversary of admission to trading on the London Stock Exchange and the turning point for our operations. The road here has been long and, at times, challenging. However, with continued perseverance I am confident of delivering significant value to our shareholders."

 

Upstream

Production and Infrastructure

· Continued focus on infrastructure and increasing gas production for sale

· 708 wells producing gas for sale across all blocks (2015: 666)

· H1 2016 well counts across all blocks summarised as follows:

 

GSS

GCZ

GSN

GPX

GQY-A

GQY-B

GFC

GGZ

Total Wells

1,588

114

201

12

7

52

30

33

Wells producing gas for sale

621

87

0

0

0

0

0

0

 

· Gross production capacity across all licence areas increased to 6.01 bcf (H2 2015: 5.44 bcf)

Exploration

· Significant progress made on GGZ block ahead of planned Chinese Reserve Report this year

· 2 wells tested successfully across 3 production horizons

· 5 wells came online with 2 producing gas

Downstream

· Green Dragon equity gas H1 2016 sales mix split was 94% PNG and 6% CNG (2015: 95% PNG; 5% CNG)

· Sales at GSS increased to 1.07 bcf (H2 2015: 0.75 bcf) an increase of 42% versus H2 2015

· Sales and production for the last 3 periods are summarised as follows:

 

H1 2015

H2 2015

H1 2016

Sales GSS (Bcf)

0.66

0.75

1.07

PNG

0.55

0.52

0.67

CNG

0.33

0.38

0.28

Power

0.08

0.09

0.12

Sales GCZ (Bcf)

0.94

0.88

0.83

 

10.00% Green Dragon Gas Ltd. Bond ISIN: NO 001 072437.0

As stated in the 2015 financial statements published on 27April, 2016, the results do not include the Group's share of CNOOC GSN transactions or operated GSS 1,388 well's revenue, associated costs and results margins. The sales revenues and volumes associated with the CNOOC operated areas of GSS and GSN, for period ending year end 2015, will be reported in due course as they are currently being audited by independent auditors.

 

Upon conclusion of the audit, the Interest Coverage Ratio and Leverage Ratio for the Company's outstanding Bond, currently not compliant, shall be adjusted in accordance with the results.

 

Green Dragon continues to pursue the completion of the CNOOC audit so that they will be able to give a final and conclusive statement of their results for the year to 31 December 2015.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

 

For further information on the Company and its activities, please refer to the website at www.greendragongas.com or contact:

Instinctif Partners

David Simonson / George Yeomans

Tel: +44 20 7457 2020

 

Citigroup

Tom Reid / Luke Spells

Tel: +44 20 7986 4000

 

Peel Hunt

Richard Crichton / Ross Allister

Tel: +44 20 7418 8900

 

About Green Dragon Gas

Green Dragon Gas is a leading independent gas producer with operations in China and is listed on the main market of the London StockExchange (LSE: GDG). The Company has 549Bcf of 2P reserves and 2379Bcf of 3P reserves across eight production blocks covering over7,566km² of licence area in the Shanxi, Jiangxi, Anhui and Guizhou provinces. It holds six Production Sharing Agreements with strong, highly capitalised Chinese partners including CUCBM (CNOOC), CNPC and PetroChina, and has infrastructure in place to support multiple routes to monetise gas production.

 

END

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDDMGZNKVLGVZG
Date   Source Headline
19th Jul 20114:40 pmRNSBuy Back of Shares
13th Jul 201110:29 amRNSTrading Statement
5th Jul 20117:00 amRNSPetroChina Huabei Pipeline Connection
30th Jun 20112:15 pmRNSDirector/PDMR Shareholding
28th Jun 201111:38 amRNSDirector/PDMR Shareholding
27th Jun 20112:44 pmRNSDirector/PDMR Shareholding
24th Jun 20112:31 pmRNSDirector/PDMR Shareholding
15th Jun 20113:16 pmRNSConvertible Bond
15th Jun 20111:46 pmRNSResult of AGM
26th May 201111:26 amRNSPosting of Annual Report & AGM
16th May 201111:02 amRNSSinoenergy Divestment
11th May 20111:58 pmRNSConvertible Bond
11th May 20111:53 pmRNSExercise of Share Options
8th Apr 20118:30 amRNSFinal Results
5th Apr 20117:00 amRNSHolding(s) in Company
5th Apr 20117:00 amRNSDrilling Rig Order
11th Mar 20114:03 pmRNSClarification announcement
8th Mar 20118:30 amRNSSchedule 1 update - Greka Drilling Limited
8th Mar 20117:00 amRNSReserves Upgrade
7th Mar 20116:21 pmRNSDemerger of Greka Drilling - Result of EGM
7th Mar 201110:21 amRNSIssue of Equity
2nd Mar 20118:10 amRNSAppointment of Corporate Broker
18th Feb 20114:40 pmRNSSecond Price Monitoring Extn
18th Feb 20114:35 pmRNSPrice Monitoring Extension
16th Feb 20117:00 amRNSProposed demerger of Greka Drilling Limited
18th Jan 20112:14 pmRNSDirectorate Change
17th Dec 201010:32 amRNSHolding(s) in Company
17th Dec 201010:32 amRNSHolding(s) in Company
15th Dec 201012:25 pmRNSHolding(s) in Company
13th Dec 201012:01 pmRNSExercise of Options
3rd Dec 20101:25 pmRNSDirector/PDMR Shareholding
3rd Dec 201012:19 pmRNSIssue of Equity
8th Nov 20107:00 amRNSCorporate Update
6th Oct 20107:00 amRNSStrategic Acquisition
1st Oct 20107:00 amRNSTotal Voting Rights
23rd Sep 20102:33 pmRNSExercise of Options
23rd Sep 201010:30 amRNSConvertible Bond
15th Sep 20107:00 amRNSAcquisition of Regional CNG Refuelling Network
10th Sep 201011:33 amRNSDirector/PDMR Shareholding
1st Sep 20107:00 amRNSHalf Yearly Report
31st Aug 201011:45 amRNSChange of Broker
27th Aug 201012:48 pmRNSNotification of Interim Results
9th Jun 20102:20 pmRNSConvertible Bond
9th Jun 201011:31 amRNSDirector/PDMR Shareholding
8th Jun 20103:29 pmRNSConvertible Bond
17th May 201010:54 amRNSResult of AGM
23rd Apr 20107:00 amRNSAGM Notice/Posting Accounts/Registered Office
22nd Mar 20107:00 amRNSFinal Results
8th Mar 201012:18 pmRNSNotice of Results
16th Feb 20107:00 amRNSReserves Upgrade and Operations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.