The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFTO.L Regulatory News (FTO)

  • There is currently no data for FTO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Liulin Coal Bed Methane Update

25 Mar 2010 07:00

RNS Number : 1639J
Fortune Oil PLC
25 March 2010
 



25 March 2010

 

 

FORTUNE OIL PLC

("Fortune Oil" or "the Company")

 

Liulin Coal Bed Methane Update

 

Highlights

 

Fortune Oil is pleased to announce the following significant advancements for the Liulin Coal Bed Methane ("CBM") block:

 

·; An extension of the exploration period for the Production Sharing Contract ("PSC") for the Liulin CBM block has been approved by the Ministry of Commerce for a further two years to 29 March 2012.

 

·; As a consequence, under the arrangements with Arrow Energy International Pte Ltd ("Arrow International"), Arrow will now pay US$5.3 million to Fortune (which was deferred pending renewal of the PSC exploration period) after which Arrow International will hold a 35 per cent interest in Fortune Liulin Gas ("FLG"). Arrow International has already paid US$8 million to the Fortune Oil Group in December 2009, US$6 million of which has been invested in FLG to fund the current field operations.

 

·; Fortune Oil is confident that the ongoing involvement and investment by Arrow International in Liulin will not be affected by the proposed restructuring of its parent company, Arrow Energy Limited. Staff from Arrow International have already been integrated into the FLG operations team.

 

·; FLG has now commenced the drilling of lateral wells in Liulin, which will significantly enhance production capacity from the field.

 

·; FLG is working alongside China United Coalbed Methane Corporation (CUCBM) under the framework of the Liulin State Pilot Project. The agreed objective of the combined drilling campaign is to demonstrate for the State Pilot Project a gas production capacity of 50 million cubic metres per year (1.8 billion cubic feet per year) from the wells drilled in 2009 and 2010. Gas sales agreements are currently being negotiated for the future sale of CBM from the Liulin block.

 

 

Fortune Liulin Gas

 

The Ministry of Commerce has approved the extension of the PSC exploration period for the Liulin CBM block for a further two years to 29 March 2012.

 

Further to the Subscription and Shareholders Agreement dated 18 December 2009, and as detailed in the Company announcement of the same day, Arrow Energy International ("Arrow International") will as a result pay a further US$5.3 million to Fortune Green Energy Limited ("FGE") after which Arrow International will have a 35 per cent interest in FLG. The remaining 65 per cent interest will be held by FGE, in which Fortune Oil has an 85 per cent controlling interest. Completion of this transaction is expected within the coming week.

 

On 22 March 2010 the Board of Arrow Energy Limited, the parent company of Arrow International, recommended to its shareholders the acceptance of an offer from Shell and PetroChina as a result of which Arrow International would become part of a demerged Australian Stock Exchange listed entity to be called Dart Energy Ltd. Dart Energy Ltd would house all the international assets and several of the early stage CBM exploration assets of Arrow Energy Limited, along with the existing staff of Arrow International and a number of the current senior executives of Arrow Energy Limited. Fortune Oil views this as a positive outcome for the continuing involvement of Arrow International in the Liulin block and the ongoing ability to leverage Arrow International's technical expertise and field development experience. Personnel from Arrow International have already been seconded to FLG and are now fully integrated into the FLG operations team, for example in the design and supervision of the new lateral wells.

 

Quarterly Drilling Update

 

The Company is pleased to announce that the first of two lateral wells has been spudded in Liulin by FLG. These lateral wells are targeting production from seams 8 and 9 in the northern section of the Liulin block, and each will comprise two 1,000 metre branches. These two wells will complement the two lateral wells being drilled by FLG's government partner, CUCBM, in the northern section of the block. The Company expects that a significant portion of the Liulin block will be developed using lateral wells as they have a far greater production capacity than vertical wells.

 

FLG is also in the process of fracture-stimulating the 6 vertical cluster wells that were drilled in late 2009 in the southern section of the block. These wells complement the 17 vertical production wells drilled by CUCBM in late 2009, also in the south. It is planned to drill further vertical wells in the southern section in 2010.

 

FLG and CUCBM have a joint objective under the Liulin State Pilot Project to demonstrate gas production capacity of 50 million cubic metres per year (1.8 billion cubic feet per year) from the wells drilled in 2009 and 2010. Negotiations have already commenced concerning an initial gas sales agreement with CUCBM Shanxi, an existing joint venture between Fortune Oil and CUCBM. It is envisaged that CUCBM Shanxi will construct facilities in the Liulin block for marketing the early CBM production as Compressed Natural Gas ("CNG"). The higher gas volumes anticipated in the later production phase will require additional marketing infrastructure and discussions have already commenced with regional pipeline companies for this.

 

In December 2009 FLG and CUCBM completed the application for certification of reserves totalling 5 billion cubic metres (180 billion cubic feet) for seams 3, 4 and 5 in a northern section of the block. The formal certification is still awaiting a final sign-off from the Ministry of Land and Resources. Application for reserves certification for additional coal seams across the block will be possible once the 2010 drilling campaign has been completed.

 

Mr Qian Benyuan, Chairman of Fortune Oil PLC, commented:

 

"We are very pleased to commence our spring drilling campaign in partnership with Arrow Energy International and CUCBM. All parties are committed to ensuring that Liulin is one of the first commercial producers of CBM in China as envisaged under the State Pilot Project. The new lateral wells, coming at the same time as the PSC extension, are a key step forward towards achieving this goal."

 

 

 

Enquiries:

 

Fortune Oil PLC

John Pexton - Deputy Chief Executive Tel: 00 852 2583 3113 (Hong Kong)

Pelham Bell Pottinger

Archie Berens Tel: 020 7337 1509 or 07802 442 486

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEELBLBXFZBBQ
Date   Source Headline
6th Mar 201512:27 pmRNSCourt confirms Capital Reduction
4th Mar 20155:46 pmRNSCourt sanctions scheme of arrangement
4th Mar 20157:37 amRNSSuspension - FORTUNE OIL PLC
4th Mar 20157:30 amRNSStatement re. Suspension
4th Mar 20157:30 amRNSSuspension
13th Feb 20155:13 pmRNSResult of Meeting
16th Jan 20157:00 amRNSOffer Document Posted
9th Jan 20153:46 pmRNSDistribution of interim report
7th Jan 20151:27 pmRNSForm 8.3 - JTC Trustees Limited (Replacement)
6th Jan 20155:58 pmRNSForm 8.3 - China North Industries (Replacement)
6th Jan 20155:53 pmRNSForm 8.3 - Maoming Petrochem Corp (Replacement)
6th Jan 20155:51 pmRNSForm 8.3 - China Nat Electronics (Replacement)
6th Jan 20155:50 pmRNSForm 8.3 - China National Aero-Tech (Replacement)
6th Jan 20154:09 pmRNSForm 8.3 - JTC TRUSTEES LIMITED
6th Jan 20153:56 pmRNSForm 8.3 - China North Industries Corporation
6th Jan 20153:53 pmRNSForm 8.3 - Maoming Petrochemical Corporation
6th Jan 20153:53 pmRNSForm 8.3 - China Nat Electronics Import & Exports
6th Jan 20153:51 pmRNSForm 8.3- China National Aero-Technology
2nd Jan 20152:37 pmRNSForm 8.3 - [Fortune Oil Plc]
30th Dec 201410:38 amRNSForm 8.3 - Fortune Oil Plc
22nd Dec 20143:51 pmRNSForm 8 (OPD) - Fortune Oil Plc
22nd Dec 20149:38 amRNSForm 8.3 - Fortune Oil Plc
22nd Dec 20149:34 amRNSForm 8.3 - Fortune Oil
19th Dec 20143:57 pmRNSForm 8.3 - Fortune Oil Plc
18th Dec 201411:59 amRNSForm 8 (OPD) Fortune Dynasty Holdings Limited
18th Dec 20147:57 amRNSOffer for Fortune Oil
28th Nov 20147:00 amRNSInterim Report Announcement
26th Sep 20143:36 pmRNSResult of AGM
23rd Sep 201412:23 pmRNSGrants and vesting for Directors and PDMRs
17th Sep 201412:19 pmRNSCorrection to Key Performance Indicator
29th Aug 20149:34 amRNSNotice of AGM
19th Aug 20143:16 pmRNSAcquisition
15th Aug 20147:00 amRNSInterim Management Statement
24th Jul 20141:19 pmRNSAnnual Information Update
24th Jul 201411:00 amRNSAnnual Financial Report
9th Jun 20141:24 pmRNSDirectorate Change
20th May 20145:07 pmRNSLong Term Incentive Plan (LTIP) - change to dates
24th Mar 201410:17 amRNSPosting of second interim report
26th Feb 201412:21 pmRNSSecond Interim Report 2013
10th Jan 20142:06 pmRNSDirector Declaration
5th Dec 20134:40 pmRNSSecond Price Monitoring Extn
5th Dec 20134:35 pmRNSPrice Monitoring Extension
2nd Dec 20139:30 amRNSRe: Armenian Iron Ore Project
2nd Dec 20139:14 amRNSAppointment of Acting CEO / Change of Year End
27th Nov 201310:30 amRNSAllotment and Issuance of CGH Shares
27th Nov 201310:30 amRNSRegulatory Approval For New SPM
22nd Nov 20137:43 amRNSDirectors' shares vested in the EBT
21st Nov 20139:38 amRNSChina Gas Holdings Consideration Election
19th Nov 20137:00 amRNSInterim Management Statement
13th Nov 20139:58 amRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.