Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFDI.L Regulatory News (FDI)

  • There is currently no data for FDI

Tsabong Project Update

27 Mar 2009 07:00

RNS Number : 5782P
Firestone Diamonds PLC
27 March 2009
 



Firestone Diamonds plc

Tsabong project update

LONDON: 27 March 2009

Firestone Diamonds plc, ("Firestone" or "the Company"), the AIM-quoted diamond mining and exploration company (ticker: AIM:FDI), today announces results from bulk sampling at its Tsabong kimberlite project in Botswana. The Tsabong kimberlite field contains 85 kimberlites, including the 180 hectare MK1 kimberlite, which is one of the largest diamondiferous kimberlites in the world.

HIGHLIGHTS:

·; Macrodiamonds recovered from 5 of 6 kimberlites sampled 
·; Good results from MK1 
- 21 macrodiamonds recovered 
- good indicator mineral chemistry received
·; Encouraging results from MK38 
·; Joint venture discussions at an advanced stage

 

 

Of the fourteen high interest kimberlites that have been identified at Tsabong, six were sampled using a large diameter drill ("LDD") rig in 2008. Processing of these samples has been completed, and results are encouraging, with macrodiamonds being recovered from five kimberlites.

With eight more high interest kimberlites awaiting bulk sampling, a further 71 kimberlites to evaluate and the likelihood of new discoveries being made with over 80 known geophysical drill targets, the Company continues to believe that the Tsabong kimberlite field has significant economic potential.

In December 2008 the Company announced that it intended to focus its resources on more advanced projects that were closer to cash flow, such as BK11, and that it would consider the introduction of a joint venture partner to finance further work on Tsabong. Interest in the project has been high and negotiations are currently underway with a number of potential joint venture partners.

Philip Kenny, CEO of Firestone Diamonds, commented: "We consider Tsabong to be one of the most attractive large scale diamond exploration and evaluation projects in the market. The results of the work that we have carried out are encouraging and we believe that the project has the potential to contain significant economic deposits. The project has attracted substantial interest from potential joint venture partners despite the recent downturn in the rough diamond market, and we look forward to continuing work on Tsabong with a new partner later in 2009."

MK1

MK1 produced the best results, yielding 21 macrodiamonds, all clear, white gemstones. Nineteen of these diamonds came from the deeper of the two LDD holes drilled. When combined with the recovery of 252 microdiamonds from core drilling in 2008, from which a macrodiamond grade estimate of 25 carats per hundred tonnes ("cpht") was made, and recent analyses of indicator mineral chemistry, these results support the Company's belief that MK1 has significant economic potential and that further evaluation work is warranted.

MK38

Two LDD holes were drilled on MK38, but both were terminated at a depth of 150m due to difficult drilling conditions being encountered. The high interest zone in MK38 was not sampled as a result. The recovery of six macrodiamonds from the small amount of shallow material that was sampled is considered very encouraging. Previous analysis of the size frequency distribution of microdiamonds recovered from MK38 indicated a potential macrodiamond grade of 25 to 30 cpht. Deeper LDD holes will be drilled on MK38 when work at Tsabong resumes. 

MK51, MK52 and MK84

Two diamonds were recovered from MK51 and one from each of MK52 and MK84. While it does not appear that these kimberlites have economic potential, these results prove that diamond mineralisation occurs across multiple kimberlites in the Tsabong field. 

MK45

MK45 did not produce any diamonds despite the very abundant presence of kimberlitic indicator minerals in the material sampled, which are typically correlated with diamond mineralisation. Further analysis is required to determine whether more LDD drilling is warranted on MK45.

LDD results

Results from processing of each of the LDD holes drilled are provided below:

Kimberlite

Hole ID

Depth sampled (m)

Sample size

(Tonnes)

Macrodiamonds recovered

 

 

From

To

 

 

MK1

MK1-301

184

404

142

2

MK1

MK1-302

125

515

251

19

MK38

MK38-301

99

137

27

5

MK38

MK38-302

90

150

43

1

MK45

MK45-301

68

312

160

0

MK51

MK51-301

75

252

114

2

MK52

MK52-301

84

344

167

1

MK84

MK84-301

30

315

183

1

For further information, visit the Company's web site at www.firestonediamonds.com, or contact:

Philip Kenny, Firestone Diamonds

+44 20 8834 1028/+44 7831 324 645

Jos Simson/Gareth Tredway, Conduit PR

+44 20 7429 6603/+44 7899 870 450

Mike Jones/Ryan Gaffney, Canaccord Adams (Joint Broker)

+44 020 7050 6500

Jerry Keen, Blue Oar (Joint Broker)

+44 20 7448 4492/+44 777 069 7358

Alexander Dewar, Brewin Dolphin 

(Nominated Adviser)

+44 131 529 0276

Background information on Firestone Diamonds:

AIM quoted Firestone Diamonds plc ("FDI.L") is an international diamond mining and exploration company with operations in Botswana and South Africa. Botswana is the world's largest and lowest cost producer of diamonds, with annual production worth over $2.5 billion, and is considered to be one of the most prospective countries in the world to explore for diamonds.

Firestone is the largest holder of mineral rights in Botswana's diamondiferous kimberlite fields, controlling over 29,000 square kilometres around the major Orapa and Jwaneng mines and the entire Tsabong kimberlite field. Firestone has 95 kimberlites in its portfolio, of which 24 have been proven to be diamondiferous. Sixteen of Firestone's kimberlites are at the bulk sampling stage, of which BK11 is the most advanced. 

Note:

The information in this statement has been reviewed by Mr. Tim Wilkes, B Sc, Pr Sci Nat, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies. Mr. Wilkes is Chief Operating Officer of Firestone Diamonds plc and has over 27 years experience in diamond exploration, mineral resource management and mining. Mr. Wilkes is a member of the sub-committee for diamonds of the South African Mineral Resource Committee (SAMREC). 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJFMRTMMITBRL
Date   Source Headline
18th Jun 20147:00 amRNSBoard Changes
6th Jun 201410:37 amRNSHolding(s) in Company
6th Jun 201410:37 amRNSHolding(s) in Company
6th Jun 20147:00 amRNSShare Consolidation
5th Jun 20144:06 pmRNSHolding(s) in Company
4th Jun 201411:17 amRNSHolding(s) in Company
2nd Jun 20144:52 pmRNSHolding(s) in Company
2nd Jun 20144:48 pmRNSHolding(s) in Company
2nd Jun 20144:47 pmRNSHolding(s) in Company
28th May 20142:33 pmRNSAdmission of the new Ordinary Shares
27th May 20147:00 amRNSFinancing agreements entered into for Liqhobong
28th Apr 20141:50 pmRNSResult of GM
28th Apr 20147:05 amRNSResult of Open Offer
28th Apr 20147:00 amRNSMining Lease Agreement and Fundraising Timetable
11th Apr 20147:00 amRNSPosting of Circular and Notice of General Meeting
6th Mar 20147:00 amRNSInterim Results
27th Feb 20147:00 amRNSAppointment of Chief Project Officer
19th Feb 20147:00 amRNSDelisting from the Botswana Stock Exchange
30th Jan 20147:00 amRNSDirectorate Change
15th Jan 20147:00 amRNSUS$222.4 million Project Funding for Liqhobong
29th Nov 20133:52 pmRNSResult of AGM
27th Nov 20133:14 pmRNSShareholdings in the Company and Director dealing
25th Nov 20137:00 amRNSCredit Committee Approval for Debt Facility
5th Nov 20136:28 pmRNSHolding(s) in Company
5th Nov 20137:00 amRNSUpdated Definitive Feasibility Study Results
23rd Oct 20137:00 amRNSIncrease in diamond values at Liqhobong
21st Oct 201311:30 amRNSHolding(s) in Company
10th Oct 20137:00 amRNSDirector Share Issues
4th Oct 20137:00 amRNSFinal results for the year ended 30 June 2013
24th Sep 20137:00 amRNSAdviser Appointments
12th Aug 20137:00 amRNSStuart Brown appointed CEO
6th Aug 201311:59 amRNSHolding(s) in Company
1st Aug 201311:55 amRNSResult of GM
16th Jul 20137:00 amRNSPlacing to raise approximately US$6.0m
20th May 20137:00 amRNSProject Finance Update
7th May 20137:00 amRNSResults of Diamond Tenders
28th Mar 20137:01 amRNSInterim Results
27th Mar 201312:45 pmRNSSuccessful Court Ruling
29th Jan 20137:00 amRNSResponse to press speculation
17th Dec 20127:00 amRNSResults of Diamond Tenders
14th Dec 20122:46 pmRNSResult of AGM
28th Nov 20124:39 pmRNSHolding(s) in Company
23rd Nov 20124:18 pmRNSAward of Share Options to Directors
13th Nov 20127:00 amRNSFinal results for the year ended 30 June 2012
6th Nov 20121:39 pmRNSHolding(s) in Company
30th Oct 20122:19 pmRNSHolding(s) in Company
29th Oct 201212:57 pmRNSHolding(s) in Company
29th Oct 20127:00 amRNSChange of Adviser
25th Oct 201210:18 amRNSHolding(s) in Company
25th Oct 20127:00 amRNSLiqhobong Definitive Feasibility Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.