We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFerro-alloy Re. Regulatory News (FAR)

Share Price Information for Ferro-alloy Re. (FAR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.95
Bid: 4.70
Ask: 5.20
Change: 0.00 (0.00%)
Spread: 0.50 (10.638%)
Open: 4.75
High: 4.95
Low: 4.75
Prev. Close: 4.95
FAR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Full Updated Ore-Body 1 Mineral Resource Estimate

2 May 2023 14:20

RNS Number : 1516Y
Ferro-Alloy Resources Limited
02 May 2023
 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF THE MARKET ABUSE REGULATION (EU) NO. 596/2014 (INCLUDING AS IT FORMS PART OF THE LAWS OF ENGLAND AND WALES BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018 ("MAR").

 

 

 

2 May 2023

Ferro-Alloy Resources Limited

("Ferro-Alloy" or the "Group" or the "Company")

 

Full Updated Ore-Body 1 Mineral Resource Estimate

 

Ferro-Alloy Resources Limited (LSE:FAR), the vanadium producer and developer of the large Balasausqandiq vanadium deposit in Southern Kazakhstan, is pleased to announce the full results of the updated mineral resource estimate ("MRE") from SRK Consulting Ltd ("SRK") prepared in accordance with the terms and guidelines of the Australian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves ("JORC" or the "JORC Code") for Ore-Body 1 ("OB1") at the Balasausqandiq deposit.

MRE Highlights Include:

· An Indicated Mineral Resource of 32.9 million tonnes for OB1, at a mean grade of 0.62% V2O5, reported at a marginal cut-off grade of 0.4% V2O5 - equating to 203,364 contained tonnes of vanadium pentoxide ("V2O5")

· An increase of 8.6 million tonnes (35.4%) of mineral resource and an increase of 38,058 tonnes (23%) of contained V2O5 by comparison with the estimate contained in the Company's 2018 Competent Persons Report 

· The results of the previously reported infill drilling and trenching programmes completed during 2021/22 have been successful in converting 100% of the Resources to Indicated for the OB1 deposit. No Measured or Inferred Resource are stated

· A total of 75 diamond core holes and 88 trenches were used to define the Resource (a reduction of drill section spacing to 250 metres from the original 500 metres increased confidence)

· Confirmation that there are reasonable prospects for eventual economic extraction by constraining the Mineral Resources to an optimised open pit shell (50 degree slopes and a revenue factor of 1) using a selling price for 98% V2O5 flake of USD9.82 /lb

 

Commenting on the MRE, Nick Bridgen, CEO of Ferro-Alloy Resources said:

"We are delighted with the results of this MRE for OB1 which has not only upgraded the classification of all the resources to the Indicated category, but increased the contained V2O5 at OB1 by 23%. Exploration of OB2, 3 and 4 has been completed and the mineral resource estimate for those ore-bodies is expected later this year.

We look forward to publishing the results of the feasibility study for Stage 1 of the Balasausqandiq project, expected to be completed in the final quarter of 2023, with the feasibility study for Stage 2 to follow in 2024."

 

Overview of the April 2023 Mineral Resource Estimate for Balasausqandiq OB1 Deposit

The MRE for the Balasausqandiq OB1 vanadium deposit was based on the historic and latest infill trench and diamond drill programme completed in 2021-2022. The Resource has been estimated from 35 new drillholes and 29 new trenches and was aimed to verify historic diamond drilling and trenching. A total of 75 diamond core holes and 88 trenches have now been used to define the Resource.

The current estimate is based on diamond core and trench profiles sections at a 250 m spacing along the strike of the OB1 deposit. A pit optimization study has also been conducted to assess the reasonable prospects for eventual economic extraction. The latest TetraTech testwork shows high recoveries in the order of 85 to 95% V2O5 across all grade ranges. The pit optimisation used an overall slope angle of 50 degrees, a processing recovery of 85% and a revenue factor of 1.0 for a selling price of USD9.82 /lb to give a conservative evaluation and achieve the head grade for which the 85% processing recovery was applicable at the marginal cut-off grade.

Results of the updated MRE are an Indicated Mineral Resource of 32.9 million tonnes (Mt) at a mean grade of 0.62% V2O5 reported at a marginal cut-off grade of 0.4% V2O5.

No Measured or Inferred Resources are reported. Table 1 below presents a summary of the OB1 MRE broken down by metal and Resource Classification.

Table 1. Summary Report for April 2023 MRE OB 1 Resource

Classification

Zone

Tonnage (Mt)

% V2O5

% Mo 

% U 

% C

Indicated

 

 

Oxide

Transitional

Fresh (Sulphide)

1.57

0.67

0.014

0.0047

7.16

1.25

0.66

0.014

0.0045

7.17

30.08

0.61

0.015

0.0052

8.83

Total

32.90

0.62

0.015

0.0051

8.69

Notes for Mineral Resource Estimate:

· Mineral Resources have an effective date of 1st April 2023 

· Reported Mineral Resources are those remaining below the depleted current historic pits and topographic surface as of 1st April 2023

· All Resources are reported above a cut-off grade of 0.4% V2O5  

· The MRE established that there are reasonable prospects for eventual economic extraction by constraining the Mineral Resources to an optimised open pit shell (50 degree slopes and a revenue factor of 1) using a selling price for 98% V2O5  flake of USD9.82 /lb

· Tonnages are reported in metric units, grades in percent (%). All contained metal is reported in tonnes. Tonnages, grades, and contained metal totals are rounded appropriately. Rounding as required by reporting guidelines may result in apparent summation differences in Table 1

 

 

Table 2. Comparison of 2018 and 2023 MRE Estimates

Estimate

Tonnage (Mt)

% V2O5

Contained V2O5 (t) 

 2018 MRE COG 0.0% (Ind + Inf)

24.3

0.68

165,306

2023 MRE Indicated COG 0.4% (Indicated)

32.9

0.62

203,364

 

 

The Competent Person for the declaration of Mineral Resources is Mr Peter Gleeson (CEng, MIMMM, AIGS), an employee of SRK. The Mineral Resource estimate was prepared by a team of consultants from SRK.

 

For further information, visit www.ferro-alloy.com or contact:

 

Ferro-Alloy Resources Limited

Nick Bridgen (CEO) / William Callewaert (CFO)

info@ferro-alloy.com

 

Shore Capital 

(Joint Corporate Broker)

 

Liberum Capital Limited

(Joint Corporate Broker)

Toby Gibbs/John More

 

 

Scott Mathieson/William King

 

+44 207 408 4090

 

 

+44 20 3100 2000

 

St Brides Partners Limited

(Financial PR & IR Adviser)

Catherine Leftley/Ana Ribeiro

+44 207 236 1177

 

About Ferro Alloy Resources Limited:

The Company's operations are all located at the Balasausqandiq deposit in Kyzylordinskoye Oblast in the South of Kazakhstan. Currently the Company has two main business activities:

a) the high grade Balasausqandiq vanadium project (the "Project"); and

b) an existing vanadium concentrate processing operation (the "Existing Operation")

Balasausqandiq is a very large deposit, with vanadium as the principal product together with several by-products. Owing to the nature of the ore, the capital and operating costs of development are very much lower than for other vanadium projects.

The most recent mineral resource estimate for ore-body one (of five) provided an Indicated Mineral Resource of 32.9 million tonnes at a mean grade of 0.62% V2O5 equating to 203,364 contained tonnes of V2O5. In the system of reserve estimation used in Kazakhstan the reserves are estimated to be over 70m tonnes in ore-bodies 1 to 5 but this does not include the full depth of ore-bodies 2 to 5.

The Project will be developed in two phases, Phase 1 and Phase 2, treating 1m tonnes per year and an additional 3m tonnes per year. Production will be some 5,600 tonnes of V2O5 from Phase 1, rising to 22,400 tonnes V2O5 after Phase 2 is commissioned.

There is an existing concentrate processing operation at the site of the Balasausqandiq deposit. The production facilities were originally created from a 15,000 tonnes per year pilot plant which was then expanded and adapted to recover vanadium, molybdenum and nickel from purchased concentrates.

The existing operation is located on the same site and uses some of the same infrastructure as the Project, but is a separate operation which will continue in parallel with the development and operation of the Project.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCMZGGKFZMGFZM
Date   Source Headline
26th Apr 20247:00 amRNSQ1 2024 Production Results
15th Feb 20241:00 pmRNSSale of 3rd Tranche of Exempt Offer Bond Programme
1st Feb 20247:00 amRNSFeasibility Study Update & Bond Programme
12th Jan 20247:00 amRNSQ4 2023 Production Results
22nd Dec 20237:00 amRNSTrading Update
30th Nov 20237:00 amRNSTotal Voting Rights
22nd Nov 20237:00 amRNSHolding(s) in Company
21st Nov 202312:17 pmRNSDirector/PDMR Shareholding
14th Nov 20237:00 amRNSIssue of Equity
1st Nov 20235:08 pmRNSResult of AGM
17th Oct 20237:00 amRNSExempt Offer Bond Programme - Second Tranche Sale
10th Oct 202312:53 pmRNSExisting Operation Q3 Production Results
6th Oct 20237:00 amRNSNotice of AGM
19th Sep 20237:00 amRNSExempt Offer Bond Programme - Second Tranche
12th Sep 20237:00 amRNSInvestor Presentation
12th Sep 20237:00 amRNSGrant of Share Options
11th Sep 20237:00 amRNSHalf-year Report
21st Aug 20237:00 amRNSTrading Update
27th Jul 20239:00 amRNSLaunch of Bond Programme /Listing of First Tranche
19th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
17th Jul 20237:00 amRNSExisting Operation H1 Production Results
3rd May 20237:00 amRNSInvestor Presentation via Investor Meet Company
2nd May 20232:25 pmRNSDirectors Share Purchase
2nd May 20232:20 pmRNSFull Updated Ore-Body 1 Mineral Resource Estimate
28th Apr 20237:00 amRNS2022 Final Results and Updated Ore-Body 1 MRE
30th Jan 20237:00 amRNSTrading & Operational Update and Grant Funding
20th Dec 20222:05 pmRNSSecond Price Monitoring Extn
20th Dec 20222:00 pmRNSPrice Monitoring Extension
20th Dec 20227:00 amRNSBalasausqandiq Feasibility Study Update
7th Dec 20227:00 amRNSFeasibility Study: Drilling Programme Completes
28th Nov 20224:41 pmRNSSecond Price Monitoring Extn
28th Nov 20224:36 pmRNSPrice Monitoring Extension
28th Nov 20222:05 pmRNSSecond Price Monitoring Extn
28th Nov 20222:00 pmRNSPrice Monitoring Extension
10th Nov 20223:43 pmRNSResult of AGM
13th Oct 20227:00 amRNSNotice of AGM
27th Sep 20226:00 pmRNSHolding(s) in Company
22nd Sep 20227:00 amRNSGrant of Options
15th Sep 20225:15 pmRNSResult of PrimaryBid Offer
15th Sep 202212:20 pmRNSResult of Placing and Subscriptions
15th Sep 20227:02 amRNSPrimaryBid Offer
15th Sep 20227:01 amRNSProposed Placing
15th Sep 20227:00 amRNSInterim Results
1st Jul 20227:38 amRNSBalasausqandiq Feasibility Study Update
1st Jul 20227:00 amRNSBalasausqandiq Feasibility Study Update
29th Jun 20227:00 amRNSGrant of Options
29th Apr 20227:00 amRNSFinal Results
5th Apr 20224:41 pmRNSSecond Price Monitoring Extn
5th Apr 20224:36 pmRNSPrice Monitoring Extension
1st Apr 20227:00 amRNSAppointment of Chief Financial Officer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.