Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Oil & Gas Regulatory News (EOG)

Share Price Information for Europa Oil & Gas (EOG)

Share Price is delayed by 15 minutes
Get Live Data
1.60    0.04 (2.67%)
Bid:
1.50
Ask:
1.70
Spread: 0.20 (13.333%)
Market Cap: £20.27m
EOG Live PriceLast checked at - London Stock Exchange

Intraday Europa Oil & Gas Share Chart

Pre-AGM Operational Update

14 Dec 2010 07:00

Europa Oil & Gas (Holdings) plc

14 Dec 2010

Pre-AGM Operational Update

The Directors of Europa Oil & Gas (Holdings) plc are pleased to provide updates on the Barchiz oil discovery and the West Frisby-9 drilling operations ahead of today's AGM.

Barchiz-1 Oil Discovery - Well Suspended for re-entry appraisal in the Spring

The re-run DST sample contained crude oil along with mud filtrate and formation water, indicating that the well is located in the lower part of an oil column (transition zone) adjacent to an up-dip oil accumulation. It was not possible, with the equipment currently available in-country, to lift the well and conduct a prolonged flow test of the zone.

Due to the mountain winter conditions, no further work on the well can take place until the spring. Accordingly, the well has been suspended and the rig demobilised from site.

The options being planned for this future work programme are a full flow test of the well, and/or a possible up-dip sidetrack. The Barchiz structure is a strongly westerly dipping feature similar to the 50mmbo Geamana Field, 10km along trend to the south, such that testing a significantly up-dip location to the east can be easily achieved from the existing wellbore.

In the meantime, the data from the well test will be assessed, including crude oil sample analysis, a second iteration of reservoir log analysis with the fluid property data and incorporation of the well seismic survey into the structural interpretation.

West Firsby-9 Drilling Update

Work is progressing on the new West Firsby-9 well, designed to be a near-horizontal oil production well in the core area of the West Firsby structure. The concrete pour to complete the well cellar construction was achieved on the 11th December and the forward programme is for the 17 ½" hole to be pre-drilled and cased ahead of mobilisation of the Geometric HH102 rig in late December to drill the main section of the well.

Paul Barrett, Managing Director of Europa, said "The evidence from the Barchiz well suggests it was drilled on the edge of a Geamana-style oil accumulation. It is, however, too early to assess potential reserves and eventual flow rates that can be achieved with a full flow test and an up-dip sidetrack. Future operations are expected to provide these numbers. Meanwhile, at West Firsby, we are on-track to drill a multi-zone producing well."

Further information:

Europa Oil & Gas

Paul Barrett / Phil Greenhalgh Tel: +44 1235 553 266

finnCap

Sarah Wharry / Henrik Persson, Corporate Finance Tel: +44 207 220 0567 Joanna Weaving, Corporate Broking Tel: +44 207 600 1658

This announcement has been reviewed by Paul Barrett BSc, MSc, a geologist with 30 years of experience in the mainstream oil and gas industry.

EUROPA OIL & GAS (HOLDINGS) PLC
Date   Source Headline
23rd Dec 201012:38 pmPRNWest Firsby Drilling Update
14th Dec 20104:31 pmRNSResult of AGM
14th Dec 20104:17 pmRNSHolding(s) in Company
14th Dec 20107:00 amPRNPre-AGM Operational Update
8th Dec 20101:18 pmPRNBarchiz - Oil recovered on DST
25th Nov 20107:00 amPRNBarchiz Test Plans
22nd Nov 20107:00 amPRNProduction Operations Update
17th Nov 20107:00 amPRNWest Firsby Drilling Plans
1st Nov 20108:17 amPRNDrilling Report
26th Oct 201012:06 pmPRNAnnual Financial Report
18th Oct 20107:00 amPRNSpud of Romanian Exploration Well
14th Oct 20107:01 amRNSPlacing, Change of Adviser & Director's Dealing
14th Oct 20107:00 amRNSPreliminary results for year ended 31 July 2010
29th Sep 20109:19 amPRNTrading Update
20th Sep 20107:00 amPRNWest Firsby Reserves Upgrade
9th Sep 20107:00 amPRNAurelian Romania and Barchiz Update
24th Aug 20109:21 amPRNKey Projects Update
18th Aug 20107:00 amPRNUnconventional Resource Licence Award
13th Aug 201010:00 amPRNDirectorate Change
21st Jun 20107:00 amPRNRomania Operations Update
24th May 20103:52 pmPRNHolmwood Planning Update
24th May 20107:00 amPRNTesting Update - Voitinel Frac
19th Apr 20107:00 amPRNIssue of Equity
15th Apr 20107:00 amPRNVoitinel Test Update
9th Apr 201012:32 pmPRNDirector/PDMR Shareholding correction
9th Apr 201011:50 amPRNDirector/PDMR Shareholding
8th Apr 20107:05 amPRNAppointment of Chairman
8th Apr 20107:00 amPRNChange of Nomad and Broker
7th Apr 20107:00 amPRNInterim Management Statement
6th Apr 20107:00 amPRNHykeham Well Update
11th Mar 20109:00 amPRNOperational Update - Hykeham
24th Feb 20107:00 amPRNRomania Resources Update
10th Feb 20107:00 amPRNHykeham-1 Flow Test
4th Feb 201010:13 amPRNDirector/PDMR Shareholding
3rd Feb 201010:41 amPRNHykeham Timetable Update
28th Jan 20102:57 pmPRNPlanned Investor Presentation
21st Jan 20107:00 amPRNOperations Update - Hykeham
21st Dec 20097:00 amPRNRegulatory Approvals
16th Dec 20098:58 amPRNResult of AGM
9th Dec 20097:00 amPRNLicence Update
8th Dec 20097:00 amPRNHykeham-1 Further Update
4th Dec 200911:26 amPRNHykeham-1 to be completed
17th Nov 20097:00 amPRNVoitinel Gas Discovery Update
13th Nov 20097:00 amPRNHykeham Drilling Update
10th Nov 20099:17 amPRNDirector/PDMR Shareholding
28th Oct 20098:56 amPRNGrant of stock options
26th Oct 20093:53 pmPRNDrilling update
26th Oct 20096:00 amPRNHykeham Update
20th Oct 20097:00 amPRNAnnual Financial Report
24th Sep 20097:00 amPRNDrilling plans update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.