Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEnwell Energy Regulatory News (ENW)

Share Price Information for Enwell Energy (ENW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 18.325
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.65 (3.611%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 18.325
ENW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ukrainian Operations Update

29 Nov 2021 07:00

RNS Number : 7990T
Enwell Energy PLC
29 November 2021
 

29 November 2021

 

Enwell Energy plc("Enwell" or the "Company")

 

Ukrainian Operations Update

 

Enwell Energy plc (AIM: ENW), the AIM-quoted oil and gas exploration and production group, provides an update on operations at its Mekhediviska-Golotvshinska (MEX-GOL) and Svyrydivske (SV) gas and condensate fields and its Svystunivsko-Chervonolutskyi (SC) exploration licence in Ukraine.

 

At the SV field, testing operations on the SV-29 development well were delayed for a period due to local shortages of materials required in the operations, but supplies have now improved and progress has been made with the initial testing of the well. The well was spudded in February 2021 and drilled to a final depth of 5,450 metres. The primary target of the well was the V-22 reservoir within the Visean formation, and to date, one interval within this reservoir, at a drilled depth of 5,246 - 5,249 metres, has been perforated. Testing of this interval is underway using a variety of choke sizes, and initial results are promising, with gas flows and an unexpectedly high, but somewhat variable, proportion of condensate. The higher than anticipated condensate rates have required that the testing procedures be modified, such that a longer period of initial testing of this interval will be required. Once completed, it is intended to perforate and test a further interval, at a drilled depth of 5,228 - 5,232 metres, in the V-22 reservoir. Thereafter, the well will be run through the gas processing facilities to allow longer-term production testing to be conducted in order to optimise the operating parameters of the well. The well was also appraising the V-21 and V-23 horizons, and within these horizons, there were indications of hydrocarbons based on well logs which warrant further investigation in due course.

 

Drilling of the SV-31 well at the SV field is ongoing, with the well having reached a depth of approximately 4,489 metres. This well was spudded in September 2021, and has a target depth of 5,250 metres. The well is a development well, targeting production from the V-21 and V-22 reservoirs in the Visean formation, which have demonstrated good productivity in an existing nearby well. Drilling operations are scheduled to be completed by the end of the first quarter of 2022, and, subject to successful testing, production hook-up is scheduled during the second quarter of 2022.

 

In addition, the SV-2 well at the SV field has experienced water ingress and consequently has been taken off production. A workover of this well is being undertaken to investigate the cause of, and seek to remedy, the water ingress, which is planned to include the replacement of the production string. However, the well was drilled in the early 1980s, and so the condition of the equipment in the well may be poor and require alternative work to remedy the water ingress. This well is operated under a joint venture agreement with PJSC Ukrnafta, the majority State-owned oil and gas producer, pursuant to which the gas and condensate produced is sold under an equal net profit sharing arrangement between the Company and PJSC Ukrnafta.

 

At the MEX field, the MEX-109 well has also experienced water ingress and as a result has been taken off production. This well was drilled by the Company and completed in 2017, and therefore technical information on the well is readily available to the Company's technical team to assist with the investigation of the cause of the water ingress. A workover of the well is underway, and logging will be undertaken shortly to identify the source of the water ingress, followed by appropriate remedial works.  

 

The shut-in of the SV-2 and MEX-109 wells has impacted current production rates and, depending on the duration of the requisite remedial works, will potentially have a material impact on the Company's overall production volumes for Q4 2021. However, continued high hydrocarbons sales prices will help to offset the anticipated overall lower production volumes and the resultant impact on revenues in Q4 2021.

 

At the SC licence, drilling of the SC-4 well is continuing, with the well having reached a depth of approximately 4,613 metres. This well was spudded in August 2021, and has a target depth of 5,565 metres. The well is primarily an appraisal well, targeting production from the V-22 horizon, as well as exploring the V-16 and V-21 horizons, in the Visean formation. Drilling operations are scheduled to be completed in mid-2022.

 

Also at the SC licence, the acquisition of 150 km2 of 3D seismic has commenced, and is expected to be completed early in 2022, with processing and interpretation of the acquired seismic data scheduled for completion in Q2 2022.

 

Finally, construction work on the upgrades to the gas processing facilities at the MEX-GOL and SV fields is underway. In total, the upgrade works are scheduled to take approximately three and a half months to complete. These works involve an upgrade of the LPG extraction circuit, an increase to the flow capacity of the facilities, and a significant increase to the liquids tank storage capacity, which are designed to improve overall plant efficiencies, improve the quality of liquids produced and boost recoveries of LPG, while reducing environmental emissions.

 

Further updates on the progress of the abovementioned operational activities will be made in due course as further information becomes available.

 

Sergii Glazunov, Chief Executive Officer, said: "We are pleased to finally have some initial results from the SV-29 well, after the delays caused by the supply constraints in Ukraine, and look forward to making further progress with the testing of this well. We are also pleased with the good progress we are making in the drilling of the SV-31 and SC-4 wells, the commencement of the acquisition of 3D seismic at the SC licence and the initiation of the construction works at the MEX-GOL and SV gas processing facilities. It is unfortunate that both the SV-2 and MEX-109 wells have suffered water ingress around the same time, but we have moved quicky to commence workover operations on both wells and hope to remedy the issues encountered in the near future."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014, which forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018, as amended.

 

 

For further information, please contact:

 

Enwell Energy plc

Tel: 020 3427 3550

Chris Hopkinson, Chairman

Sergii Glazunov, Chief Executive Officer

Bruce Burrows, Finance Director

Strand Hanson Limited

Tel: 020 7409 3494

Rory Murphy / Matthew Chandler

Arden Partners plc

Tel: 020 7614 5900

Ruari McGirr / Elliot Mustoe (Corporate Finance)

Simon Johnson (Corporate Broking)

Citigate Dewe Rogerson

Tel: 020 7638 9571

Ellen Wilton

 

 

Dmitry Sazonenko, MSc Geology, MSc Petroleum Engineering, Member of AAPG, SPE and EAGE, Director of the Company, has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM Rules.

 

 

Definitions

 

km2

square kilometre

LPG

liquefied petroleum gas

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFLDLELTFIL
12
Date   Source Headline
2nd May 20244:20 pmRNSResults of Annual General Meeting
19th Apr 20247:00 amRNSQuarterly Operations Update
5th Apr 20247:00 amRNSNotice of Annual General Meeting
20th Mar 20245:14 pmRNSHolding(s) in Company
20th Mar 20245:07 pmRNSHolding(s) in Company
8th Mar 20247:00 amRNSBoard and Management Changes
17th Jan 20247:00 amRNSQuarterly Operations Update
29th Dec 20237:30 amRNSRestoration - Enwell Energy PLC
29th Dec 20237:00 amRNS2023 INTERIM RESULTS
21st Dec 20233:28 pmRNS2022 AUDITED RESULTS
10th Oct 20237:00 amRNSQuarterly Operations Update
31st Jul 202310:38 amRNSStandard form for notification of major holdings
31st Jul 202310:35 amRNSStandard form for notification of major holdings
26th Jul 20237:00 amRNSQuarterly Operations Update
3rd Jul 20237:30 amRNSSuspension - Enwell Energy plc
24th May 20237:00 amRNSInterim Dividend
22nd May 20237:00 amRNSUpdate on Auditor, 2022 Annual Report and Accounts
4th May 20235:44 pmRNSSuspension of VAS and SC Licences
4th May 20237:00 amRNSArkona - Successful Appeal in SC Licence Case 
28th Apr 202311:23 amRNSQuarterly Operations Update
12th Apr 20234:14 pmRNSRegulatory Actions by Ukrainian Authorities
3rd Mar 20237:00 amRNSCourt Decision on VAS Licence Order
26th Jan 20233:50 pmRNSChange of Broker
26th Jan 20233:04 pmRNSStandard form for notification of major holdings
26th Jan 20232:56 pmRNSStandard form for notification of major holdings
17th Jan 20235:16 pmRNSSmart Holding Restructuring
12th Jan 20237:00 amRNSQuarterly Operations Update
4th Jan 20237:00 amRNSNew Natural Resources Legislation in Ukraine
20th Dec 20227:02 amRNSSpud of GOL-107 Well
20th Dec 20227:00 amRNSResignation of Auditor and Posting of Statement
9th Dec 20224:57 pmRNSRestrictive Measures Affecting Major Shareholder
4th Nov 20227:00 amRNSArkona - Legal Challenge to Validity of SC Licence
31st Oct 20227:00 amRNSResults of SC-4 Well
11th Oct 20227:00 amRNSQuarterly Operations Update
5th Oct 20224:41 pmRNSSecond Price Monitoring Extn
5th Oct 20224:36 pmRNSPrice Monitoring Extension
30th Sep 20227:00 amRNS2022 INTERIM RESULTS
28th Sep 20223:48 pmRNSResults of Annual General Meeting
1st Sep 20223:00 pmRNSNotice of Annual General Meeting
25th Aug 20227:00 amRNSBoard Changes
8th Jul 20227:00 amRNSQuarterly Operations Update
29th Jun 20227:00 amRNS2021 Audited Results
4th May 20227:00 amRNSEnwell Energy plc Results of SV-31 Well
13th Apr 20227:00 amRNSQuarterly Operations Update
15th Mar 20227:00 amRNSPartial Restart of Production Operations
24th Feb 20224:49 pmRNSShut down of field operations
24th Feb 20224:40 pmRNSSecond Price Monitoring Extn
24th Feb 20224:35 pmRNSPrice Monitoring Extension
17th Jan 20227:00 amRNSUkraine Update
13th Jan 20227:00 amRNSUkraine Update
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.