Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.045    0.00 (0.00%)
Bid:
0.04
Ask:
0.05
Spread: 0.01 (25.00%)
Market Cap: £2.57m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Block A Update

14 Apr 2008 07:15

Empyrean Energy PLC14 April 2008 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Sugarloaf Block A, Texas USA ---------------------------- • Empyrean confirms significant discovery at the Sugarloaf Project area.• First well tested from five drilled to date (Sugarloaf Blocks A & B) flows commercial quantities of gas and condensate on test.• Four further wells which have all encountered hydrocarbon shows whilst drilling are yet to be tested. Empyrean, the AIM listed energy company with exploration andproduction assets in Germany and USA today announces the followinginitial test results from its TCEI JV Block A-3 well on Block A atthe Sugarloaf Project in Texas: Initial flow testing of the TCEI JV Block A-3 well has recorded flowrates using 12/64" choke close to 1.9 mmcfgpd (million cubic feetgas per day) with over 460 bcpd (barrels of condensate per day) and75 bwpd (barrels of water per day - normal under thesecircumstances) with a FTP (Flow Tubing Pressure) of almost 4000 psi.On the present day prices for condensate and gas whilst convertingthe condensate to a gas equivalent, the equivalent gas flow rateexceeds (using a 10:1 conversion) 6.5 mmcfepd (million cubic feetgas equivalent per day). This open hole test has been conducted without stimulation and istesting the vertical pay section in the upper part of the CretaceousAustin Chalk reported in our announcement of 15 November 2007 (peakreadings 350 units - 10 times background levels). The drilling ofthis well ceased 2,700 feet short of the proposed length assignificant gas shows and flares whilst drilling were encounteredprompting the operator to prepare the well for an open hole flowtest, to see if the well would flow without stimulation, as reportedin our announcement of 11 January 2008. Much work is now being conducted to correlate these early resultswith that of a similar field in the region to help establish bestpractice for completions moving forward on this substantial andsignificant gas condensate discovery. The Brookeland Field in TylerCounty is one such field and early comparisons are very favorable. Atypical well drilled by one of the operators in the Brookeland Fieldhas an approximate equivalent rate of 1.4 mmcfepd per thousand feetof horizontal (comparing favorably to Empyrean's TCEI JV Block A-3well at approximately 2.4 mmcfepd per thousand feet of horizontal).The typical well for one operator at the Brookeland Field hasapproximately 12,000 feet of horizontal with average initial ratesof over 16 mmcfepd. Commenting today, Empyrean Executive Director Tom Kelly said "Theimportance of this comparison is that Empyrean's TCEI JV Block A-3well has approximately 2800 feet of horizontal and a much higherequivalent production rate per thousand feet of horizontal wellindicating that at the Sugarloaf Project there is every chance thatbetter production rates may be able to be gained by increasing thelength of the horizontal portion of the wells." After some 20 hours of flow testing the TCEI JV Block A-3 well hasbeen shut in to conduct pressure measurements and other reservoirdata measurements as part of the normal engineering procedures tomeasure the parameters of this discovery. Further testing will berequired to confirm the extent of the reservoir and the fielddeliverability. At this early stage there is no clear indication onthe time it will take to determine these important factors. Empyrean has a 7.5 % working interest in the TCEI JV Block A-3 welland further announcements will follow as significant developmentscome to hand. Tom Kelly added "This is terrific news for Empyrean and ourshareholders. The initial recorded flow rates are excellent using achoke that was not fully opened and the pressure is high. Much isbeing learnt from this well and the comparison with Brookeland thatshould see many of our future wells flowing even better than thisone. After a very patient wait Empyrean's shareholders are beingrewarded with being part of a major discovery. This is the firstflow test from 5 drilled wells that have all encountered hydrocarbonshows whilst drilling on this project's extended area. We still have4 already drilled wells to test which is very exciting. Moreimportantly, this first well tested has confirmed a significant gas/condensate discovery, and with oil fetching over US$100 a barrel theeconomics are even more attractive." The information contained in this announcement was completed andreviewed by the Technical Director of Empyrean Energy Plc, Mr FrankBrophy BSc (Hons) who has over 40 years experience as a petroleumgeologist. For further information: Empyrean Energy plcTel : +44(0) 207 182 1746 Rod Venables / Cecil JordaanHB CorporateTel: +44(0) 207 510 8600 Jonathan Charles / Ed PortmanConduit PRTel: +44 (0) 207 429 6611 / +44 (0) 7791 892 509 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Sep 20219:50 amRNSAGM Company Presentation
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development
16th Dec 20204:41 pmRNSSecond Price Monitoring Extn
16th Dec 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20207:14 amRNSBorba Drilling Program
2nd Oct 20207:59 amRNSAppointment of Joint Broker
22nd Sep 202011:06 amRNSResults of Annual General Meeting
22nd Sep 20209:45 amRNSAGM Company Presentation and Question & Answers
21st Sep 20207:00 amRNSDirector/PDMR Shareholding
15th Sep 20208:34 amRNSAward of Options
15th Sep 20208:32 amRNSUpdate re: Annual General Meeting
11th Sep 20207:15 amRNSEmpyrean completes £640,500 Placement
11th Sep 20207:00 amRNSEmpyrean completes £200,000 Placement
21st Aug 202010:11 amRNSFinal Results
3rd Jun 20207:00 amRNSExtension agreed for first phase at Block 29/11
26th May 20207:00 amRNSMako Resource Audit Confirms Significant Upgrade
22nd May 20207:00 amRNSDuyung PSC Update, Indonesia
21st May 20207:00 amRNSBlock 29/11, China - Seismic Inversion Project
12th May 20207:40 amRNSResult of Open Offer
29th Apr 20207:00 amRNSCompany Update
22nd Apr 20207:26 amRNSLaunch of Open Offer
17th Apr 202010:57 amRNSUpdate on Fundraising
14th Apr 20207:30 amRNSSubscription and Proposed Placing
14th Apr 20207:00 amRNSResource Upgrade of Mako Gas Field
25th Mar 20202:11 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.