We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.475
Bid: 0.40
Ask: 0.55
Change: 0.00 (0.00%)
Spread: 0.15 (37.50%)
Open: 0.475
High: 0.00
Low: 0.00
Prev. Close: 0.475
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Duyung PSC, Operational Update - Tambak -1

13 Nov 2019 07:00

RNS Number : 2356T
Empyrean Energy PLC
13 November 2019
 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

 

13 November 2019

 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update - Tambak -1

 

Highlights

·; Top reservoir depth came in at circa 1,276 feet TVDSS as predicted

·; Very well-developed upper sandstone unit of approximately 17 feet with wireline logs confirming excellent porosity & permeabilities

·; Tambak-1 encountered a much better developed intra-Muda sand package than expected:

Ø In addition to the upper sandstone unit, a thick lower sandstone unit of almost 66 feet was found

Ø Overall gross thickness of ~ 82 feet of intra-Muda sandstone, (compared to a 23.9 feet reservoir sandstone seen in Mako South-1)

·; Pressure data confirm Tambak-1 is in the same pressure system as Mako South-1 & Tambak-2

·; Gas samples recovered from the reservoir confirm gas composition as seen in Mako South-1

·; Gas-water contact found in the main upper sandstone unit, 5 feet below the gas-water contact at Mako South-1 and Tambak-2, providing volumetric upside potential for the field

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the drilling campaign in the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

 

Tambak-1, located approximately 4.5 km north of the Mako South-1 well, has been drilled to an intermediate depth of 1,683 feet true vertical depth sub-sea ("TVDSS"). The well has intersected the intra-Muda reservoir of the Mako field and a full suite of wireline logs have been acquired together with a pressure survey and extensive fluid and gas samples recovered. These data have established the well as a successful appraisal of the Mako gas field and confirm the large, areally extensive single tank model for the field.

 

As previously reported, the Tambak-1 well is designed as both an appraisal of the northeast flank of the Mako gas field as well as an exploration test of the Tambak prospect. An independent review by Gaffney Cline & Associates had previously ascribed gross 2C resources of 276 Bcf (48.78 MMboe) of recoverable dry gas in the Mako field with gross 3C resources of 392 Bcf (69.3 MMboe) representing additional field upside. The results of the successful appraisal drilling in both Tambak-1 and -2 provide significant volumetric upside potential for the field, representing a very significant value addition.

 

As a next step, the well will be drilled to a total depth of approximately 4,495 feet TVDSS in order to test the potential of the deeper Tambak prospect. Tambak is estimated as having a mid-case prospective resource potential of 250 Bcf and a geological chance of success of 45%. The Tambak-1 well is planned to be plugged and abandoned once operations are complete.

 

The gross cost of the two well programme is expected to be approximately $17MM-19MM to the PSC partners on a fully tested basis, including rig mobilisation and de-mobilisation, for which Coro Energy Plc ("Coro") is funding US$10.5MM. Empyrean will fund 8.5% of the additional drilling campaign costs over and above the Coro funding.

 

Tom Kelly, Empyrean CEO commented," The successful appraisal of the Mako gas discovery (intra-Muda sands) to date has clearly added significant confidence in the resource and has created value that is normally only achieved through additional exploration. Any subsequent success at the deeper Tambak exploration prospect will add further value to an already successful drilling campaign".

 

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 30 years' experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

 

Tom Kelly

Tel: +61 8 9380 9920

 

 

 

 

Cenkos Securities plc

 

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

 

 

 

St Brides Partners Ltd

 

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

 

Near Field Exploration Potential, To Be Tested in 2019

 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFFUSMDFUSEDF
Date   Source Headline
27th Jun 20147:30 amRNSProduction and Operational Update
25th Jun 20147:29 amRNSProduction and Operational Update
9th Jun 20144:04 pmRNSHolding(s) in Company
20th May 20147:00 amRNSMAJOR UPGRADE TO SUGARLOAF AMI RESERVES+RESOURCES
13th May 201412:05 pmRNSComment on Aurora Oil and Gas Announcement
1st Apr 20149:01 amRNSUSD1.5million reypayment on term debt facility
28th Mar 201412:13 pmRNSExercise of Options
20th Mar 201412:30 pmRNSOption Terms Amendment
7th Mar 20141:27 pmRNSMajor Interest in Shares
5th Mar 20147:00 amRNSNew Corporate Presentation
18th Feb 201410:02 amRNSAdmission of Ordinary Shares
12th Feb 20141:30 pmRNSExercise of Options
12th Feb 20147:00 amRNSProduction and Q4 2013 Operational Update
7th Feb 20147:06 amRNSComment on Aurora Oil & Gas Announcement
8th Jan 20147:00 amRNSUpdate re Macquarie Debt Facility
20th Dec 20137:54 amRNS3,512% increase in net profits to £2.384m
18th Dec 201310:45 amRNS2014 Drilling Guidance
13th Dec 20137:00 amRNSMarathon highlights Sugarloaf AMI uplift potential
15th Nov 201310:00 amRNSChange of Auditor
5th Nov 20137:00 amRNSProduction and Operational Update, Sugarloaf AMI
18th Oct 20137:00 amRNSChange of Adviser
3rd Oct 20138:39 amRNSPrincipal Office Change
30th Sep 20137:00 amRNSUSD1m Repayment on Macquarie Debt Facility
23rd Sep 20137:00 amRNSRecommences activity in Block A with Conoco, Texas
12th Sep 20138:00 amRNSSugarloaf: Marathon permit update
14th Aug 20132:22 pmRNSHolding(s) in Company
14th Aug 201311:45 amRNSExercise of Options
8th Aug 20138:15 amRNSAppointment of Public Relations Company
8th Aug 20137:45 amRNSSugarloaf: Marathon Update
2nd Aug 20138:30 amRNSSugarloaf: Hedging contract with Macquarie Bank
1st Aug 20138:15 amRNSSugarloaf - Production and Operational Update
26th Jul 20137:00 amRNSPrincipal Office Change
2nd Jul 20133:56 pmRNSResult of AGM and General Meeting
2nd Jul 20131:16 pmRNSAGM Presentation
2nd Jul 20137:00 amRNSFacility repayment
18th Jun 201311:02 amRNSHolding(s) in Company
14th Jun 201310:08 amRNSNotice of General Meeting
11th Jun 201312:35 pmRNSHolding(s) in Company
10th Jun 20138:35 amRNSInvestor presentation
3rd Jun 20131:13 pmRNSNotice of AGM
29th May 20138:30 amRNSOperations Update: Riverbend Project
15th May 20138:00 amRNSFinal Results
1st May 20134:52 pmRNSOperations Update
1st May 20137:30 amRNSOperational Update
30th Apr 20134:26 pmRNSOperational Update
19th Apr 20137:00 amRNSProduction and Operational Update
28th Mar 20137:02 amRNSDrawndown under Macquarie debt facility
25th Mar 20138:00 amRNSEagle Oil Pool Development Project
6th Mar 20138:30 amRNSOperational Update: Sugarloaf Project
26th Feb 20131:51 pmRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.