Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.499
Bid: 0.471
Ask: 0.55
Change: 0.0405 (8.62%)
Spread: 0.079 (16.773%)
Open: 0.499
High: 0.50
Low: 0.499
Prev. Close: 0.47
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Alvares 1 Testing and Operations Update

30 Aug 2018 07:00

RNS Number : 2400Z
Empyrean Energy PLC
30 August 2018
 

This announcement contains inside information

 

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

30 August 2018

Empyrean Energy PLC ("Empyrean" or the "Company")

 

Alvares 1 Testing and Operations Update, Sacramento Basin, California

 

Empyrean Energy (EME: AIM), the oil and gas development company with interests in China, Indonesia and the United States, is pleased to announce that it has been informed by Sacgasco Limited (ASX: SGC) ("Sacgasco"), the operator of the Company's interests in the Sacramento Basin, onshore California, that it has obtained regulatory approval to test the potential for over-looked natural gas in the Alvares 1 well with re-entry targeted for early Q4 2018. Empyrean has a 25% working interest in the Alvares prospect ("Alvares").

 

The aim of the Alvarez appraisal work is to prove up large gas resources by appraising extensive natural gas shows in a 1982 well (that was focused on oil targets), by re-entering and testing the integrity of the existing wellbore, before testing a conventional reservoir zone, as well as a new fractured reservoir play concept.

 

The initial task is to test the integrity of the existing casing, then log through the casing to select perforation zones; and then test various zones of gas saturated reservoirs in the well. Consistent with good oilfield practice and for evaluation efficiency, Sacgasco have designed the programme with flexibility to respond to the results of testing.

 

The Alvares well had a drilled section of over 5,000 feet of high pressure gas shows which were not fully evaluated at the time of drilling due to the oil focus of the operators. The Alvares 1 well is one of only three on-structure wells in the under-explored part of the Northern Sacramento Basin that flowed pipeline quality natural gas to the surface on test. At Alvares, the flow stage of the open hole test in the Stoney Creek Formation failed almost immediately as the test equipment in the well bore was dislodged by high pressures.

 

The target Stoney Creek Formation at Alvares is separate from, and older than any of the formations tested at the Company's Dempsey well or the Tulainyo well recently drilled by the Company's JV partner. Stoney Creek rocks have only rarely been drilled in the 100 years of exploration in the Sacramento Basin.

 

The two wells that drilled significant portions of the Stoney Creek Formation, James 1 (1947) and Alvares 1 (1982), flowed natural gas to surface from Stoney Creek reservoirs when oil was the commercial focus. Under the revised programme, the well bore will be assessed for its suitability for directly flow testing various gas saturated reservoirs interpreted from petrophysical and mud logs, and seismic in the Alvares well.

 

State-of-the-art through-casing gas detection logs, and high penetration perforating tools are planned to be utilised for the testing.

 

Empyrean notes that Pancontinental Oil & Gas NL's subsidiary, Bombora Natural Energy Pty Ltd, has executed an agreement with Sacgasco to fund 50% (up to US$200,000) of drilling and pressure testing costs to assess the previously plugged Alvares 1 well bore integrity prior to planned flow testing.

 

Dempsey Project

 

Following the previously announced recommencement of gas production from the Dempsey 1-15 well, Sagasco has advised that some water accumulated in the well bore and reduced gas production. Production of gas from the Dempsey well has been shut-in temporarily for pressure build-up as a means to clear water from the well bore before recommencing gas production.

 

The Dempsey 1-15 well is the first deeper well in the eastern area of the northern Sacramento Basin to be based on 3D seismic. For the first time in 100 years of exploration in the Sacramento Basin, natural gas has flowed to sales from older under-explored sediments. Extensive gas shows over 5,000 feet of sediments demonstrate gas charged systems with characteristics similar to productive Basin Centered Gas Systems in other basins. Moreover, the seismic data demonstrates multiple opportunities for improved reservoir development away from the Dempsey well bore.

 

Further information will be released on the planned programme at Alvarez in due course.

 

Empyrean CEO Tom Kelly commented, "We are looking forward to the commencement of testing at Alvarez in Q4 2018. The Alvares 1 well has previously flowed pipeline quality gas to the surface from the targeted reservoir formation and we believe that given the relative costs of re-entering the existing well bore are a fraction of the cost of a new well, it is definitely worth ascertaining whether the old well bore can be efficiently utilised. The gas shows whilst drilling for oil back in the 1980's offer a very enticing initial target with significant potential.

 

"Empyrean has already been part of a significant discovery of approximately 373 billion cubic feet of gas at its 10% owned Mako Gas Field in Indonesia which now offers low risk appraisal with significant upside. The opportunity to explore efficiently for large gas accumulations relatively close to infrastructure in the energy hungry Californian market really compliments Empyrean's portfolio that is spearheaded by its offshore China permit offering best case prospective resources from three mature drill targets of over 770 million barrels of oil."

 

This report has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 29 years experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

Tom Kelly

Tel: +61 8 9380 9920

Cenkos Securities plc

Neil McDonald

Tel: +44 (0) 131 220 9771

Beth McKiernan

Tel: +44 (0) 131 220 9778

St Brides Partners Ltd

Lottie Wadham

Frank Buhagiar

 

Tel: +44 (0) 20 7236 1177

Tel: +44 (0) 20 7236 1177

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDWGUMGRUPRUAU
Date   Source Headline
27th Jun 20147:30 amRNSProduction and Operational Update
25th Jun 20147:29 amRNSProduction and Operational Update
9th Jun 20144:04 pmRNSHolding(s) in Company
20th May 20147:00 amRNSMAJOR UPGRADE TO SUGARLOAF AMI RESERVES+RESOURCES
13th May 201412:05 pmRNSComment on Aurora Oil and Gas Announcement
1st Apr 20149:01 amRNSUSD1.5million reypayment on term debt facility
28th Mar 201412:13 pmRNSExercise of Options
20th Mar 201412:30 pmRNSOption Terms Amendment
7th Mar 20141:27 pmRNSMajor Interest in Shares
5th Mar 20147:00 amRNSNew Corporate Presentation
18th Feb 201410:02 amRNSAdmission of Ordinary Shares
12th Feb 20141:30 pmRNSExercise of Options
12th Feb 20147:00 amRNSProduction and Q4 2013 Operational Update
7th Feb 20147:06 amRNSComment on Aurora Oil & Gas Announcement
8th Jan 20147:00 amRNSUpdate re Macquarie Debt Facility
20th Dec 20137:54 amRNS3,512% increase in net profits to £2.384m
18th Dec 201310:45 amRNS2014 Drilling Guidance
13th Dec 20137:00 amRNSMarathon highlights Sugarloaf AMI uplift potential
15th Nov 201310:00 amRNSChange of Auditor
5th Nov 20137:00 amRNSProduction and Operational Update, Sugarloaf AMI
18th Oct 20137:00 amRNSChange of Adviser
3rd Oct 20138:39 amRNSPrincipal Office Change
30th Sep 20137:00 amRNSUSD1m Repayment on Macquarie Debt Facility
23rd Sep 20137:00 amRNSRecommences activity in Block A with Conoco, Texas
12th Sep 20138:00 amRNSSugarloaf: Marathon permit update
14th Aug 20132:22 pmRNSHolding(s) in Company
14th Aug 201311:45 amRNSExercise of Options
8th Aug 20138:15 amRNSAppointment of Public Relations Company
8th Aug 20137:45 amRNSSugarloaf: Marathon Update
2nd Aug 20138:30 amRNSSugarloaf: Hedging contract with Macquarie Bank
1st Aug 20138:15 amRNSSugarloaf - Production and Operational Update
26th Jul 20137:00 amRNSPrincipal Office Change
2nd Jul 20133:56 pmRNSResult of AGM and General Meeting
2nd Jul 20131:16 pmRNSAGM Presentation
2nd Jul 20137:00 amRNSFacility repayment
18th Jun 201311:02 amRNSHolding(s) in Company
14th Jun 201310:08 amRNSNotice of General Meeting
11th Jun 201312:35 pmRNSHolding(s) in Company
10th Jun 20138:35 amRNSInvestor presentation
3rd Jun 20131:13 pmRNSNotice of AGM
29th May 20138:30 amRNSOperations Update: Riverbend Project
15th May 20138:00 amRNSFinal Results
1st May 20134:52 pmRNSOperations Update
1st May 20137:30 amRNSOperational Update
30th Apr 20134:26 pmRNSOperational Update
19th Apr 20137:00 amRNSProduction and Operational Update
28th Mar 20137:02 amRNSDrawndown under Macquarie debt facility
25th Mar 20138:00 amRNSEagle Oil Pool Development Project
6th Mar 20138:30 amRNSOperational Update: Sugarloaf Project
26th Feb 20131:51 pmRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.