Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEland Oil & Gas Regulatory News (ELA)

  • There is currently no data for ELA

Operations Update

26 Oct 2018 07:00

RNS Number : 2604F
Eland Oil & Gas PLC
26 October 2018
 

26 October 2018

Eland Oil & Gas PLC

("Eland" or the "Company")

 Operations Update

 

Eland Oil & Gas PLC (AIM: ELA), an oil & gas production and development company operating in West Africa with an initial focus on Nigeria, is pleased to announce the following operations update.

 

Opuama

Drilling operations have been completed, with the Opuama-11 well being handed over to the Opuama field production team. The Company, through its joint-venture subsidiary Elcrest Exploration and Production Nigeria Ltd ("Elcrest") is now flow testing the well into the production facilities and on to export. The long string producing from the deepest of these reservoirs the D4000, flowed at 1,610 barrels of oil per day ("bopd") on a 24/64" choke with a flowing tubing head pressure ("FTHP") of 100bar (1450 psi) and the short string, producing from the D3500, flowed at 2,453 bopd on a 28/64" choke with a FTHP of 42 bar (609 psi). It is expected following completion of testing that stabilised initial production from Opuama-11 will be between 4,000 - 6,000 bopd (1,800 - 2,700 bopd net to Elcrest), in-line with previous guidance.

 

As previously announced, the Opuama-7 sidetrack well has experienced increased water-cut from the current D2000 completion. A production log was run in order to confirm water containment options ahead of a future planned re-completion on the D1000 reservoir, the well's primary target.

 

Aggregate production from the Opuama field is currently 26,325bopd (11,846 bopd net to Elcrest). Following completion of Opuama-11 testing, aggregate production from the Opuama field is expected to be approximately 30,000 bopd (13,500 bopd net to Elcrest).

 

Gbetiokun

Upon completion of Opuama-11 drilling operations, the OES Teamwork Rig mobilised to the Gbetiokun field where it will re-enter the Gbetiokun-1 well and drill the Gbetiokun-3 well as part of the initial phase of the field development.

The Gbetiokun field will be brought on stream through an early production system ("EPS"). The Gbetiokun EPS will receive production from the existing Gbetiokun-1 well, which will be completed to produce from the E2000 and E6000 reservoirs, as well as the planned Gbetiokun-3 infill well, which will produce from the D9000 and E7000 reservoirs. Initial production through the Gbetiokun EPS is estimated to be approximately 15,000 bopd.

The Gbetiokun field is located in the south-east of OML 40. It was discovered in 1987 and was appraised by three wells in 1990 and 1991. It is a simple, un-faulted, three-way dip closed structure and contains twenty oil-bearing reservoirs at depths between 5,000 and 10,000 feet.

The reserves certifier (NSAI) assesses gross reserves at 21.5 MMstb (1P) - 38 MMstb (2P) - 53.8 MMstb (3P).

 

Ubima

Workover operations on the Ubima-1 well have now been completed and the rig has been demobilised. Further to the RNS of 18 September 2018, in which the Company announced that the F7000 reservoir was tested at flow rates of up to 2,500 barrels of oil per day ("bopd") on a 24/60" choke, testing operations on the D1000 reservoir at 4,908 feet subsea have now been completed. During the test, sand production prohibited flow to surface, but an oil sample with about 15 API gravity was recovered. The Company will now evaluate options for the further appraisal and potential development of the D1000 sands.

A dual completion has been installed and a production test will be carried out on the E1000 / E2000 reservoirs to further assess volumes and productivity. Initial results from the production test are expected in the coming weeks and the Company will update the market once these results are evaluated.

George Maxwell, CEO of Eland, commented:

"We are pleased with what is expected to be another highly successful infill well on the Opuama field and we look forward to further record field production levels once testing has been completed. At current oil prices, these record levels of production from Opuama field are leading to significant cashflows for all of OML 40's stakeholders.

The prolific nature of OML 40 combined with the Company's experienced and resourceful team and supportive stakeholders means that we move development operations swiftly to the Gbetiokun field and the opportunity to increase production by a further 50% in the near-term.

Furthermore, the conversion of Ubima-1 into a producing well following the initial workover is a milestone for the Company and following the test of the E1000 and E2000 reservoirs we shall begin to evaluate monetisation opportunities for production from this well. Further evaluation of the D1000 sands are required to consider options for any full field development and we will update the market as we progress these studies.

We look forward to updating the market on the progress of both the Gbetiokun Early Production System and the evaluation of Ubima."

 

For further information:

 

Eland Oil & Gas PLC (+44 (0)1224 737300)

www.elandoilandgas.com

George Maxwell, CEO

Ronald Bain, CFO

Finlay Thomson, IR

 

Canaccord Genuity Limited (+44 (0)20 7523 8000)

Henry Fitzgerald O'Connor / James Asensio

 

Panmure Gordon (UK) Limited (+44 (0)20 7886 2500)

Adam James / Atholl Tweedie

James Stearns

 

Camarco (+44 (0) 203 757 4980)

Billy Clegg / Georgia Edmonds / Tom Huddart

 

 In accordance with the guidelines of the AIM Market of the London Stock Exchange, Yannis Korakakis, MSc of Leoben University, with 32 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

 

Notes to editors:

Eland Oil & Gas is an AIM-listed independent oil and gas company focused on production and development in West Africa, particularly the highly prolific Niger Delta region of Nigeria.

Through its joint venture company Elcrest, Eland's core asset is a 45% interest in OML 40 which is in the Northwest Niger Delta approximately 75km northwest of Warri and has an area of 498km². 

In addition, the Company has a 40% interest in the Ubima Field, onshore Niger Delta, in the northern part of Rivers State.

The OML 40 licence holds gross 2P reserves of 83.4 mmbbls, gross 2C contingent resources of 40.4 mmbbls and a best estimate of 254.5 mmbbls of gross un-risked prospective resources*

The Ubima field holds gross 2P reserves of 2.4 mmbbls of oil and gross 2C resource estimates of 31.1 mmbbl**

Net production figures relate to Elcrest Exploration and Production Nigeria Ltd ("Elcrest"), Eland's joint venture company. Production rates, when oil is exported via Forcados, are as measured at the Opuama PD meter, are subject to reconciliation and will differ from sales volumes.

*Netherland, Sewell & Associates Inc CPR report 31 December 2017

**AGR TRACS April 2016

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDGGBDGRUDBGIL
Date   Source Headline
28th Jun 201610:25 amRNSResult of Annual General Meeting
3rd Jun 20163:25 pmRNSNotice of AGM
3rd Jun 201611:42 amRNSStatement re press speculation
31st May 20167:01 amRNSOlivier Serra joins as Chief Financial Officer
31st May 20167:00 amRNSFinal Audited Results
11th May 201610:48 amRNSHolding(s) in Company
10th May 201612:56 pmRNSHolding(s) in Company
10th May 201612:50 pmRNSHolding(s) in Company
29th Apr 20162:32 pmRNSResults of Placing
29th Apr 20167:00 amRNSPlacing to Raise $15m
28th Apr 20166:29 pmRNSPlacing to Raise $15m
27th Apr 20167:00 amRNSReserve and Corporate Update
25th Apr 201611:51 amRNSOpuama-3 Workover Update
20th Apr 20167:00 amRNSUbima Reserves & Resources Update
14th Apr 20167:00 amRNSOpuama-3 Workover Update
23rd Mar 20164:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20164:35 pmRNSPrice Monitoring Extension
18th Mar 20164:26 pmRNSHolding(s) in Company
18th Mar 20164:26 pmRNSHolding(s) in Company
8th Mar 20164:40 pmRNSSecond Price Monitoring Extn
8th Mar 20164:35 pmRNSPrice Monitoring Extension
8th Mar 20161:46 pmRNSHolding(s) in Company
23rd Feb 20167:00 amRNSConversion of Shares
16th Feb 20167:00 amRNSOperational Update
5th Jan 201612:00 pmRNSIssue of Options
5th Jan 20167:00 amRNSBoard Changes
3rd Dec 201511:54 amRNSHolding(s) in Company
25th Nov 20154:43 pmRNSSecond Price Monitoring Extn
25th Nov 20154:37 pmRNSPrice Monitoring Extension
16th Nov 20157:00 amRNSOperational Update
5th Nov 20154:32 pmRNSHolding(s) in Company
13th Oct 20153:37 pmRNSTR-1: Notification of major interest in shares
9th Oct 201512:15 pmRNSTR-1: Notification of major interest in shares
30th Sep 20157:00 amRNSInterim results for the six months to 30 June 2015
28th Aug 20157:00 amRNSChange of Adviser
7th Aug 20157:00 amRNSOperations and Corporate Update
19th Jun 20152:14 pmRNSResult of AGM
28th May 20159:52 amRNSPosting of Financial Statements and Notice of AGM
27th May 20152:58 pmRNSHolding(s) in Company
26th May 20152:26 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
22nd May 20157:00 amRNSAudited Results for Year ended 31 December 2014
18th May 20152:02 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
14th May 20154:28 pmRNSHolding(s) in Company
11th May 20153:12 pmRNSHolding(s) in Company
11th May 20157:00 amRNSOML 40 Operatorship Update
23rd Apr 20158:08 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
21st Apr 20157:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Apr 201510:47 amRNSHolding(s) in Company
11th Mar 20157:00 amRNSOperations and Corporate Update
8th Jan 20157:00 amRNS$75 million Reserves Based Lending Facility Agreed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.