Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmerald Energy Regulatory News (EEN)

  • There is currently no data for EEN

Well update

23 Jun 2009 07:00

RNS Number : 3095U
Emerald Energy PLC
23 June 2009
 



Emerald Energy Plc

23 June 2009

Colombia - Gigante No.2 Well

Emerald Energy Plc ("Emerald" or the "Company") is pleased to provide the following update on operations in the Gigante No.2 well in the Matambo Association Contract in Colombia. Emerald is the Operator and Ecopetrol S.A, the Colombian national oil company, is a partner in these operations.

Drilling of the Gigante No.2 well has been completed and a production liner is being run in preparation for testing operations. 

Gigante No.2 has been planned primarily as a development well in the currently producing Tetuan reservoir and also to evaluate the exploration potential of the deeper Caballos formation. 

The well has been drilled to a total depth of 15,630 feet, encountering hydrocarbon shows in both the Tetuan and Caballos formations. The tops of the Tetuan and Caballos formations were encountered approximately 378 feet and 338 feet structurally higher, respectively, than in the Gigante No.1A well which is significantly better than the pre-drill estimate of 260 feet.

A preliminary analysis of the drilling and wireline logging data acquired to date indicates a potentially oil bearing sandstone interval of approximately 32 feet (gross and net) in the Tetuan formation with an average porosity of approximately 10%, similar to the porosity in the Gigante No.1A production well.

In the Caballos formation, a preliminary analysis of the data indicates a 163 feet gross (107 feet net) sandstone interval with an average porosity of approximately 9%. The analysis of wireIine logging data acquired to date has not been able to confirm if the Caballos formation is oil bearing.

Due to difficult open hole conditions in the well, the Operator has decided to curtail the wireline logging operations and to run a production liner across the open hole section of the well before proceeding with flow testing of both the Tetuan and Caballos formations. 

Following the liner running operation, the Operator plans to demobilise the drilling rig from the location and mobilise a smaller, lower cost rig for the testing operations. This smaller rig is expected to be operational within two weeks and the subsequent flow testing operations are expected to take up to one month to conduct.

Emerald's Chief Executive Officer, Angus MacAskill, said:

"We are very pleased with the progress in the Gigante No.2 well, having successfully drilled this deep and technically complex well, and having encountered the target formations significantly higher on the structure than in the existing Gigante No.1A production well. We now look forward with our partner, Ecopetrol S.A., to the results of the testing operations and future production from this well."

Enquiries: Lisa Hibberd 020 7925 2440

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAKKAAAANEFE
Date   Source Headline
10th Sep 20099:30 amRNSEPT Disclosure
9th Sep 20099:22 amRNSEPT Disclosure
9th Sep 20097:00 amRNSOperations Update - Syria, Block 26
8th Sep 20099:58 amRNSEPT Disclosure
7th Sep 20097:00 amRNSPosting of scheme circular
3rd Sep 20092:04 pmRNSRule 8.3- Emerald Energy PLC
3rd Sep 20099:22 amRNSEPT Disclosure
2nd Sep 20092:43 pmRNSHolding(s) in Company
2nd Sep 20098:00 amRNSMirto No.1 Well Operations Update
2nd Sep 20097:00 amBUSRule 8.3 - Emerald Energy Plc
1st Sep 200911:59 amRNSRule 8.3- Emerald Energy
1st Sep 20099:32 amRNSEPT Disclosure
28th Aug 20097:00 amBUSRule 8.3 - Emerald Energy Plc
27th Aug 20099:14 amRNSEPT Disclosure
27th Aug 20099:00 amRNSRule 8.3- (Emerald Energy plc)
27th Aug 20097:00 amBUSRule 8.3 - Emerald Energy Plc
26th Aug 200910:08 amRNSEPT Disclosure
25th Aug 20099:37 amRNSEPT Disclosure
24th Aug 200911:20 amRNSRule 8.3- (Emerald Energy Plc)
24th Aug 200911:02 amRNSHolding(s) in Company
24th Aug 200911:01 amRNSHolding(s) in Company
24th Aug 200910:43 amRNSEPT Disclosure
21st Aug 20096:14 pmRNSRule 8.3- Emerald Energy Plc
21st Aug 20092:03 pmRNSRule 8.3- Emerald Energy Plc
21st Aug 20091:08 pmRNSRule 8.3- Emerald Energy Plc
21st Aug 200911:26 amRNSEPT Disclosure
21st Aug 200910:58 amRNSRule 8.3- Emerald Energy Plc
21st Aug 200910:04 amRNSHolding(s) in Company
21st Aug 20099:51 amRNSRule 8.3- Emerald Energy PLC
20th Aug 20094:02 pmRNSHolding(s) in Company
20th Aug 20093:58 pmRNSHolding(s) in Company
20th Aug 20093:22 pmRNSRule 8.3- EMERALD ENERGY
20th Aug 200911:14 amRNSEPT Disclosure
20th Aug 200911:10 amRNSRule 8.3- Emerald Energy
20th Aug 200910:53 amRNSRule 8.3- Emerald Energy
20th Aug 20098:32 amRNSRule 8.3-Emerald Energy plc
20th Aug 20097:00 amRNSOperations update
19th Aug 20093:31 pmRNSRule 8.3- EMERALD ENERGY
19th Aug 20092:13 pmRNSRule 8.3- Emerald Energy Plc
19th Aug 200910:12 amRNSEPT Disclosure
19th Aug 20097:00 amRNSRule 8.3- Emerald Energy Plc
18th Aug 200911:14 amRNSEPT Disclosure
18th Aug 20099:41 amRNSRule 8.3- (Emerald Energy Plc)
18th Aug 20097:00 amRNSRule 8.3- Emerald Energy Plc
17th Aug 20092:39 pmRNSRule 8.3- Emerald Energy Plc
17th Aug 200911:11 amRNSEPT Disclosure
17th Aug 200911:11 amRNSEPT Disclosure
14th Aug 20092:23 pmRNSRule 8.3- (EMERALD)
14th Aug 200912:46 pmRNSHolding(s) in Company
14th Aug 200910:14 amRNSEPT Disclosure

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.