Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Pre-AGM Financial and Operational Update

16 Dec 2021 07:00

RNS Number : 8033V
Egdon Resources PLC
16 December 2021
 

 

 

16 December 2021

EGDON RESOURCES PLC

("Egdon" or "the Company")

Pre-AGM Financial and Operational Update

Egdon Resources plc (AIM:EDR) a UK-based exploration and production company primarily focused on the hydrocarbon-producing basins of onshore UK, is pleased to provide the following Financial and Operational Update ahead of its Annual General Meeting. The meeting will be held at the offices of Norton Rose Fulbright, 3 More London Riverside, London, SE1 2AQ at 11.30 am today.

Revenues

· Unaudited revenue for the three-month period from August to October 2021 was £1.085 million (2020: £0.173 million)

· Revenue was primarily from Wressle and Ceres, and was despite Wressle only recommencing flow on 19 August and the Ceres field being shut-in for annual maintenance for 20 days during September

· This is expected to translate into a step change in revenues and cash flow for the Company for the current financial year, with full-year revenue from the Company's 2020/21 financial year (£1.09 million) matched after the first quarter of the current year (August to October)

Wressle PEDL180/182 (Egdon 30%):

· The Wressle-1 well has continued to exceed our expectations since the successful completion of the proppant squeeze and subsequent coiled tubing operations on the 19 August 2021.

· Works have been completed to upgrade the gas incineration system

· Despite being flowed under a highly restricted choke (20/64 inch), whilst upgrade works are ongoing, Wressle produced at an average rate of 666 barrels of oil per day (bopd) (c. 200 bopd net to Egdon) plus 368,000 cubic feet of gas over the last 7 days period (727 barrels of oil equivalent per day)

· No formation water has been produced to date

· A secondary separator system has been designed and manufactured and is expected to be installed before year end to optimise gas/oil separation

· Early 2022 will see completion of testing of the full potential of the well

· Decisions will be made early in 2022 on the plateau production rate, to match with the longer-term operational objectives and prudent reservoir management of this important asset

· Downhole pressure data has been acquired and is currently being interpreted to further inform these decisions

· The focus in 2022 will move to progressing the optimal method of gas monetisation and finalising plans for the development of other hydrocarbon bearing sequences to access the identified contingent resources, with particular focus on the Penistone Flags reservoir

Ceres P1241 (Egdon 10%):

· The Ceres Gas Field is undergoing a late-life renaissance for the Company

· Gas realisations averaged 195p/therm in October and November 2021 (an equivalent of $157/boe)

· Given the low operating costs, strong gas market fundamentals and forward curve we believe the field could remain profitable for some years to come

Biscathorpe PEDL253 (Egdon 35.8%):

· On 1 November 2021, the planning application for a side-track drilling operation, associated testing and long-term oil production at the Biscathorpe site, was refused by Lincolnshire County Council (LCC), despite being recommended for approval by the Council's planning officers

· The formal decision notice was issued on 6 December and we are currently reviewing in detail the reasons for refusal with our planning and legal advisors and considering our options which is likely to lead to an appeal

North Kelsey PEDL241 (Egdon 50%):

· Planning applications were submitted to LCC in early December to extend the existing planning consents by twelve months and amend the proposed bottom hole target location for the planned North Kelsey well

· The applications have now been validated and the consultation period has begun

· Subject to receipt of planning consent this well could be drilled later in 2022

 

Keddington PEDL005R (Egdon 45%):

· A detailed sub-surface review of the Keddington oil field and the surrounding licence area has highlighted an opportunity to increase production via a new development side-track well for which planning consent is already in place 

· Reservoir engineering work has been completed by ERCE and has confirmed a target area in the south-east of the field which would add 85,000 to 120,000 barrels of recoverable oil

· Well specific reservoir modelling and detailed well planning will be completed in the coming period with a view to being in a position to drill the side-track well during 2022

· Additional near-field exploration opportunities have been identified at Keddington South, (gross Mean Prospective Resources of 635,000 barrels of oil) and the Louth Prospect (gross Mean Prospective Resources of 600,000 barrels of oil) which could be accessed from the existing production site in due course

Waddock Cross PL090 (Egdon 55%)

· Reservoir modelling has shown that a new horizontal well on the field could yield commercial oil production (500-800 bopd)

· Given the large in-place oil volume (Mean oil in place of c. 57 million barrels of oil) Waddock Cross has been high graded as planning consent and facilities are in place to test this significant opportunity

· Well design and surface facilities design work has been completed

· Further detailed design and costings are in preparation to support a potential JV investment decision during 2022 to drill a side-track well and reinstate production

Mark Abbott, Managing Director of Egdon, commented:

"Strong production performance and high oil and gas prices are combining to provide the Company with material operating cashflows which strengthens the balance sheet and will support our planned 2022 investment programme."

 

 

For further information please contact:

Egdon Resources plc

Mark Abbott, Martin Durham 01256 702 292

 

Buchanan

Ben Romney, Jon Krinks 020 7466 5000

 

Nominated Adviser & Joint Broker - WH Ireland Limited

Chris Hardie, Megan Liddell 020 7220 1666

Joint Broker & Financial Advisors - VSA Capital Limited

Andrew Monk (Corporate Broking) 020 3005 5000

Andrew Raca (Corporate Finance)

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). Upon the publication of this announcement via Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCEAXASFANFFFA
Date   Source Headline
6th Jan 20217:00 amRNSPreliminary Results
6th Jan 20217:00 amRNSResolution 3D Survey Update
5th Jan 20217:00 amRNSNotice of Results
26th Nov 20207:00 amRNSWressle Development Update and Loan Facility
10th Nov 20207:00 amRNSBiscathorpe Planning Update
16th Oct 20207:05 amRNSPEDL143 Relinquishment
14th Oct 20207:00 amRNSPEDL241 (North Kelsey) Alignment of Interests
7th Sep 20202:30 pmRNSNorth Kelsey Planning Update
26th Aug 20207:00 amRNSSettlement Proceeds Received
25th Aug 20207:00 amRNSShell Farm-in Update
3rd Aug 20207:00 amRNSWressle Development Update
29th Jun 20208:08 amRNSREPLACEMENT: Appointment of Nomad and joint Broker
29th Jun 20207:00 amRNSAppointment of Nomad and joint Broker
24th Jun 20207:00 amRNSHumber Oil & Gas PEDL253 Biscathorpe settlement
8th Jun 20207:00 amRNSUpdate on Licences P1929 and P2304
13th May 20207:00 amRNSWressle Update
27th Apr 20201:02 pmRNSDirector / PDMR Dealing
27th Apr 20207:00 amRNSTranche 2 of Equity Fundraising
22nd Apr 20207:00 amRNSDirector / PDMR Dealing
21st Apr 20207:00 amRNSInterim Results
14th Apr 20207:00 amRNSEquity Fundraising of approximately £500,000
2nd Apr 20207:00 amRNSCoronavirus (COVID-19) and Trading Update
30th Mar 20207:00 amRNSBiscathorpe Update - Significant Commercial Upside
18th Mar 20207:00 amRNSWressle Development Update
9th Mar 20207:15 amRNSEast Humber Basin Update
26th Feb 20207:00 amRNSProduction update and notice of results
21st Jan 20201:00 pmRNSP1929 and P2304 Farm-In Agreement with Shell U.K.
20th Jan 20207:00 amRNSUpdate on P1929 and P2304 Agreement
17th Jan 20203:00 pmRNSWressle Development Appeal Granted
19th Dec 20192:02 pmRNSResults of Annual General Meeting
27th Nov 20197:00 amRNSGrant of Licence Extensions: P1929 and P2304
19th Nov 20197:00 amRNSFinal Results
12th Nov 20192:05 pmRNSSecond Price Monitoring Extn
12th Nov 20192:00 pmRNSPrice Monitoring Extension
8th Nov 20197:00 amRNSWressle Development Public Inquiry Concluded
4th Nov 20197:00 amRNSGovernment Moratorium on Hydraulic Fracturing
4th Nov 20197:00 amRNSP1929 and P2304 Farm-out Exclusivity Agreement
1st Oct 20197:00 amRNSOperations Update
12th Sep 20197:00 amRNSSprings Road Update - Resource Density Results
4th Sep 20194:41 pmRNSSecond Price Monitoring Extn
4th Sep 20194:36 pmRNSPrice Monitoring Extension
20th Aug 20197:00 amRNSLicence Extension on PEDL143 "A24" Prospect
29th Jul 20197:00 amRNSWressle Planning Update
19th Jul 20197:00 amRNSNotification of Major Holdings
15th Jul 20197:00 amRNSBiscathorpe-2 Update
27th Jun 20197:00 amRNSSprings Road-1 Well Results
5th Jun 20197:00 amRNSCorrection
4th Jun 20197:00 amRNSOpen Offer Results
3rd Jun 201912:30 pmRNSResult of General Meeting
15th May 20192:00 pmRNSOpen Offer, GM and Production Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.