Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

10 Jan 2006 16:05

Egdon Resources PLC10 January 2006 10th January 2006 For immediate release EGDON RESOURCES PLC Operations Update Egdon Resources Plc ("Egdon" or "the Company") is pleased to provide an updateon drilling and testing operations on its UK operated licences. The BDF28 drilling rig has completed drilling and logging operations atKirkleatham-4 on licence PEDL068. The Kirkleatham-4 well reached a TD of 936mwithin rocks of Carboniferous age on the 7th January 2006. During drilling gasshows were encountered within the target Permian age Zechstein carbonates.Logging operations have now been completed and confirmed the presence of a c.19m gas column within the Cadeby Formation. The top of the Cadeby Formation waspenetrated at 804.3m where a drilling break and high gas readings were observed.Evaluation of wireline log data indicates high gas saturations and goodporosity development within the gas bearing interval. The Kirkleatham-4 wellwill be completed with 7" casing and the BDF28 rig released. Testing operationswill be undertaken using a work-over rig. Further activity at Kirkleatham willbe assessed once test results have been evaluated. On completion of operations at Kirkleatham-4 the drilling rig will mobilise tothe Westerdale-1 well site in North Yorkshire where drilling operations areexpected to commence during the week of 16th January 2006. Westerdale-1 isdesigned to test an accumulation 50.5 m up-dip and 3.7 km to the north of theRalph Cross-1 gas discovery made by Home Oil Limited in 1966. Ralph Cross-1tested gas at flow rates of up to 6 million cubic feet of gas per day from a20.5 m gas column in fractured Zechstein carbonates. Additional reservoirobjectives are present in the Westerdale-1 well both within the Zechstein and inthe underlying Carboniferous sequences. Westerdale-1 will be directionallydrilled to a total depth of around 1250 m and will take around 21 days to drill. On completion of operations at Westerdale-1 the rig will move to Dorset to drillthe Portland-1 well which is designed to test the thickness and suitability of asalt sequence for the creation of caverns for gas storage. Site constructionhas commenced at the Portland-1 well site. The Company can also report that at Waddock Cross-3, testing operations areongoing in the horizontal section drilled in the Cycle 3 of the BridportSandstone. Initial results indicate pump constrained flow rates of 270 to 400barrels of fluid per day with an average 12% oil cut. This equates to 32 to 48barrels of oil per day. The produced oil has not experienced the emulsionproblems encountered with the Waddock Cross-2 well test. Downhole pressuregauges will be recovered during the next week and the data analysed to determineoptions for the future testing and development of the Waddock Crossaccumulation. For further information please contact:Egdon Resources Plc 01256 702292Mark Abbott, Joint Managing DirectorAndrew Hindle, Joint Managing Director Buchanan Communications 020 7466 5000Eric BurnsBen Willey Notes to the Editors: Kirkleatham-4 and Westerdale-1 are located in the PEDL068 licence in theCleveland Basin where the Company holds a 20% working interest but is carriedfor 10% of the first well, Kirkleatham-4, and also holds an option to increaseits interest to 25%. The Waddock Cross-3 well was drilled within the PL090 inthe Wessex Basin where the Company holds a 45% working interest. Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon was formed in 1997 by Dr Andrew Hindle and Mark Abbott. In December 2004,Egdon's shares commenced trading on AIM, having been previously traded on Ofexsince July 2000. The Company is developing two major business areas: 1) An oil and gas exploration and production business which has a portfolio of twenty exploration licences containing identified oil and gas prospects ranging from discoveries under appraisal through to higher risk but higher reward "wild cat" exploration prospects. 2) A gas storage business initially focused on the prospective development of a major salt cavern gas storage facility beneath the Isle of Portland, Dorset. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Dec 20227:00 amRNSAcquisition of Aurora Production (UK) Limited
2nd Dec 202210:14 amRNSPostponement of AGM to 17 January 2023
18th Nov 20222:12 pmRNS2022 Annual Report, Accounts and AGM Documentation
8th Nov 20227:00 amRNSPreliminary Results
2nd Nov 202211:05 amRNSSecond Price Monitoring Extn
2nd Nov 202211:00 amRNSPrice Monitoring Extension
1st Nov 20224:40 pmRNSSecond Price Monitoring Extn
1st Nov 20224:36 pmRNSPrice Monitoring Extension
1st Nov 20227:00 amRNSTotal Voting Rights
28th Oct 202212:24 pmRNSGovernment Reintroduction of Moratorium
26th Oct 20222:06 pmRNSSecond Price Monitoring Extn
26th Oct 20222:00 pmRNSPrice Monitoring Extension
26th Oct 20227:00 amRNSNotice of Results and Investor Presentation
24th Oct 202211:26 amRNSNotification of Major holdings
12th Oct 202211:05 amRNSSecond Price Monitoring Extn
12th Oct 202211:00 amRNSPrice Monitoring Extension
4th Oct 20227:00 amRNSNotification of Major Holdings
3rd Oct 202210:25 amRNSTotal Voting Rights
27th Sep 20224:40 pmRNSSecond Price Monitoring Extn
27th Sep 20224:36 pmRNSPrice Monitoring Extension
27th Sep 20222:05 pmRNSSecond Price Monitoring Extn
27th Sep 20222:00 pmRNSPrice Monitoring Extension
23rd Sep 20228:51 amRNSResponse to Ministerial Statement
22nd Sep 20222:00 pmRNSPrice Monitoring Extension
8th Sep 202212:39 pmRNSResponse to Lifting of Shale Gas Moratorium
8th Sep 202211:05 amRNSSecond Price Monitoring Extn
8th Sep 202211:00 amRNSPrice Monitoring Extension
5th Sep 202211:05 amRNSSecond Price Monitoring Extn
5th Sep 202211:00 amRNSPrice Monitoring Extension
30th Aug 202211:05 amRNSSecond Price Monitoring Extn
30th Aug 202211:00 amRNSPrice Monitoring Extension
16th Aug 20222:05 pmRNSSecond Price Monitoring Extn
16th Aug 20222:00 pmRNSPrice Monitoring Extension
15th Aug 20229:05 amRNSSecond Price Monitoring Extn
15th Aug 20229:00 amRNSPrice Monitoring Extension
8th Aug 20227:00 amRNSSubmission of North Kelsey Planning Appeal
1st Aug 20227:00 amRNSTotal Voting Rights
27th Jul 20224:11 pmRNSNotification of Major Holdings
4th Jul 202211:58 amRNSNotification of Major Holdings
4th Jul 20227:00 amRNSBLOCK LISTING APPLICATION
1st Jul 202212:12 pmRNSSignificant Shareholders,Takeover Panel Waiver,TR1
17th Jun 20224:17 pmRNSExercise of Warrants and Total Voting Rights
8th Jun 20227:00 amRNSExercise of Warrants and Total Voting Rights
30th May 20227:00 amRNSApproval of Wressle Field Development Plan
26th May 20227:00 amRNSQuarterly Financial Update and Loan Repayment
25th May 202212:29 pmRNSExercise of warrants and total voting rights
20th May 202211:14 amRNSNotification of Major Holdings
5th May 20227:00 amRNSExercise of Warrants, Issue of New Shares and TVR
26th Apr 202212:33 pmRNSReplacement - Interim Results
26th Apr 20227:00 amRNSWithdrawal of Shell from P1929 and P2304

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.