Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Burton on the Wolds-1 well timing update

18 Sep 2014 07:00

RNS Number : 9590R
Egdon Resources PLC
18 September 2014
 



 

 

18 September 2014

EGDON RESOURCES PLC

("Egdon" or "the Company")

 

Timing Update - Burton on the Wolds-1 exploration well (PEDL201)

 

Egdon Resources plc (AIM:EDR) is pleased to provide an update on the expected timing of the Burton on the Wolds-1 conventional exploration well in UK Onshore Licence PEDL201 located in Leicestershire.

The drilling rig and associated equipment has been demobilised from the Wressle-1 well-site following the completion of that well for future testing operations. The rig will now drill a single well for Alkane Energy plc, which was deferred to enable the Wressle-1 well to be drilled, before then mobilising to Burton on the Wolds. Well-site construction at Burton on the Wolds has been completed and it is anticipated that operations will commence by mid-October.

We will provide a further update to shareholders on commencement of drilling operations.

The Burton on the Wolds Prospect is defined on proprietary 2D seismic data which was acquired by Egdon in May 2011. Evaluation has highlighted a conventional oil prospect with targets at two distinct Carboniferous stratigraphic levels. The shallower target, the Rempstone Sandstone, is productive at the nearby Rempstone oil field. A seismic anomaly, possibly indicative of a carbonate reef, underlies the Rempstone Sandstone and provides a deeper secondary target. The mean combined Prospective Resources for the two target objectives, as calculated by Egdon are estimated to be 3.8 million barrels of oil.The planned vertical well will be relatively shallow with a drilled depth of around 1,000 metres. It has been designed to intersect both targets in a structurally favourable position near the crest of the Burton on the Wolds structure.

The interests in Licence PEDL201 and the Burton on the Wolds-1 well are:

Egdon Resources U.K. Limited 32.50% (operator)

Celtique Energie Petroleum Limited 32.50%Terrain Energy Limited 12.50%Corfe Energy Limited 12.50%Union Jack Oil plc 10.00%As a result of previously announced farm-outs, Egdon's net share of the cost of the Burton on the Wolds-1 well will be 15%.

 

For the avoidance of doubt the Burton on the Wolds prospect is a conventional oil prospect and our operations will not, either now or in the future, involve the process of hydraulic 'fracking' for shale gas since the area around the Burton on the Wolds prospect has neither the required conditions nor the specific rock-types present for shale gas exploration.

 

For further information please contact:

 

Egdon Resources plc

Mark Abbott, Jerry Field 01256 702 292

 

Buchanan

Richard Darby, Anna Michniewicz 020 7466 5000

 

Nominated Adviser and Broker - Cantor Fitzgerald Europe

David Porter, Sarah Wharry (Corporate Finance) 020 7894 7000

Richard Redmayne (Corporate Broking)

 

Joint Broker - VSA Capital Limited

Andrew Monk, (Corporate Broking) 020 3005 5000

Andrew Raca (Corporate Finance)

 

 

 

Notes to Editors:

 

Egdon Resources plc

 

Egdon Resources plc (LSE:EDR) is an established UK-based exploration and production company primarily focused on onshore exploration and production in the hydrocarbon-producing basins of the UK and France.

 

Egdon currently holds interests in thirty six licences in the UK and France and has an active programme of exploration, appraisal and development within its balanced portfolio of oil and gas assets. Egdon is an approved operator in both the UK and France.

 

Egdon was formed in 1997 and listed on AIM in December 2004.

 

In accordance with the AIM Rules - Note for Mining and Oil and Gas Companies, the information contained in this announcement has been reviewed and signed off by the Managing Director of Egdon Resources plc Mark Abbott, a Geoscientist with over 26 years' experience.

 

Evaluation of Prospective Resources has been assessed in accordance with 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEASNXFFFLEFF
Date   Source Headline
1st Nov 20167:00 amRNSIndependent Gas in Place Estimates
26th Oct 20167:00 amRNSUK Onshore Licence Interest Acquisitions
18th Oct 20167:00 amRNSNotification of Results
7th Oct 20163:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th Oct 201610:15 amRNSSprings Road Planning Adjournment
3rd Oct 20167:00 amRNSUK 14th Onshore Licensing Round Final Awards
26th Sep 20167:00 amRNSCPR on Wressle-1 and Broughton North Prospect
26th Aug 20162:35 pmRNSExercise of options
22nd Aug 20167:00 amRNSAcquisition of additional interest in PEDL068
15th Aug 201612:49 pmRNSHargreave Hale TR1
15th Jul 20167:00 amRNSNotification of Major Shareholding
4th Jul 20167:00 amRNSUK Licence Changes
27th Jun 20167:05 amRNSExtension of Licence PEDL143
13th Jun 20167:00 amRNSFarm-out of Interest in PEDL182
24th May 20164:35 pmRNSPrice Monitoring Extension
26th Apr 20167:00 amRNSInterim Results
4th Apr 20167:00 amRNSNotification of Interim Results
14th Mar 20161:00 pmRNSCompletion of drilling - Laughton-1 exploration
15th Feb 20167:00 amRNSCommencement drilling operations Laughton-1 Well
8th Feb 20167:00 amRNSKeddington-5 Development Well
26th Jan 20167:00 amRNSFarm-out of Interest in the Laughton-1 Well
18th Jan 20167:00 amRNSCommencement of Drilling Keddington-5 Well
5th Jan 20161:41 pmRNSDirectors Share Dealing
4th Jan 20161:53 pmRNSDirectorate Changes
17th Dec 20153:32 pmRNSDirectors Share Dealing
17th Dec 20151:25 pmRNSUK 14th Onshore O&G Licensing Round 2nd Tranche
3rd Dec 201512:23 pmRNSResults of AGM
30th Nov 201510:18 amRNSHolding(s) in Company
16th Nov 20158:00 amRNSGrant of Options
3rd Nov 20157:00 amRNSFinal Results for the Year Ended 31 July 2015
22nd Oct 20157:00 amRNSWressle Oil and Gas Discovery: Update
14th Oct 201510:37 amRNSNotice of Results
23rd Sep 20153:08 pmRNSFavourable Holmwood Planning Decision
21st Sep 20157:00 amRNSCompletion of Farm-out of Interests in PEDL005(R)
4th Sep 20158:20 amRNSWressle-1 Update and Forward Plan
18th Aug 20152:35 pmRNSEgdon to be offered blocks in 14th Onshore Round
7th Aug 20153:31 pmRNSFavourable Holmwood Planning Inspectorate Decision
21st Jul 20157:00 amRNSWressle-1 EWT Update
14th Jul 20157:00 amRNSFarm-out of Interests in Licence PEDL005(R)
29th Jun 20157:00 amRNSFarm-out of PEDL143 Holmwood Prospect
22nd Jun 201511:09 amRNSHolding(s) in Company
22nd Jun 20157:00 amRNSFarm-out of further Interest in PEDL253
18th Jun 20157:00 amRNSWressle-1 Commencement of Extended Well Test
5th Jun 20157:00 amRNSPEDL241 - Acquisition of Additional Interest
21st Apr 20157:00 amRNSInterim Results
1st Apr 20154:05 pmRNSNotification of interim results
27th Mar 20157:00 amRNSWressle-1 Testing Update Second Penistone Flags
23rd Mar 20157:01 amRNSCompletion of drilling at Kiln Lane-1
16th Mar 20153:00 pmRNSPlanning Permission Granted for Biscathorpe-2 well
3rd Mar 20157:00 amRNSUpdate on Wressle-1 Well Testing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.