Bulk Sampling Results for Namwele

20 Dec 2016 07:00

RNS Number : 2882S
Edenville Energy PLC
20 December 2016
 

 

20 December 2016

 

 

EDENVILLE ENERGY PLC

("Edenville" or the "Company")

 

Bulk Sampling Results for Namwele

 

 

Edenville Energy plc (AIM:EDL), the Company developing an integrated coal to power project in western Tanzania, is pleased to announce the third, and final, set of results the Company has received from SGS Laboratories in relation to the recent bulk sampling programme carried out on the Mkomolo and Namwele deposits and detailed in the Company's announcement on 27 September 2016.

 

These results cover seam NM1 and follow the results of the sampling of seam MK2 announced on 15 November 2016 and MK1 on 5 December 2016.

 

Key Points:

 

· Results from seam NM1 for the Namwele deposit confirm coal as suitable for the provision of power plant feed;

 

· It is considered no washing will be needed for the Namwele seam to be used as power plant feed;

 

· Namwele NM1 seam results have exceeded expectations with approximately 60% of the coal averaging an energy value of 20MJ/kg;

 

· The results from the sampling and wash tests of NM1 further support and validate the results from the Mkomolo MK1 and MK2 seams and the recently constructed financial model and Resource Technical Assessment; and

 

· The Company is working with potential local customers assessing the options to establish mining operations in 2017.

 

 

Rufus Short, CEO of Edenville, commented: "The encouraging results from NM1 complete the wash test analysis on the bulk samples taken in September of this year. Namwele averaged above 15MJ/kg with 60% averaging 20MJ/kg and we consider we will not need to wash this coal in order for it to be used in the planned power plant. This along with the previous test work from Mkomolo has shown our coal is ideal for power plant use with mining and treatment costs being moderate to low. The work done at Mkomolo and Namwele is critical to giving confirmation around the characteristics of the fuel supply for the power plant and gives us a high degree of confidence in the quality and resulting economic viability of the project.

 

"The coal quality has exceeded our expectations we are subsequently looking at the possibility of including this coal in planned commercial sales and we are in advanced discussions with customers to open up production in 2017.

 

"With the completion of the bulk sampling programme, we are now in a position to advance talks with several potential buyers of our coal and plan an initial mining operation. Several aspects of the mining project including a stockpile area, access for road trucks, a detailed schedule and plan for 2017 and enlargement of the camp area at site are currently being worked on. I very much hope to be able to update shareholders soon on all of these areas."

 

Technical Details

 

The results from seam NM1 confirm that the coal is well suited for use in thermal power generation. As previously stated this data will form a crucial part of the process going forward to design and construct a coal fired power plant at the Rukwa project site.

 

The bulk sample produced results which indicate no washing would be needed to produce a coal suitable for use in the power generation process. The raw coal averaged 15.2MJ/kg and would therefore fit the existing parameters for thermal power generation. Significantly, high energy values were seen throughout the coal with over 78% of the bulk sample averaging coal of 18MJ/kg whilst approximately 60% averaged 20MJ/kg.

 

Sample NM1 which lies in the southern end of the Namwele deposit produced raw unwashed values as shown in Table 1.

 

Table 1 Raw Coal

 

Inherent Moisture

Ash

Volatile Matter

Fixed Carbon

Calorific Value

Total Sulphur

%

%

%

%

MJ/kg

%

7.0

40.1

25.2

27.6

15.2

3.8

 

 

Applying a moderate or partial wash to the raw coal based on a density of 1.7 the following product was obtained as shown in Table 2. The yield from this wash was high at approximately 60%.

 

Table 2 Washed Coal

 

Inherent Moisture

Ash

Volatile Matter

Fixed Carbon

Calorific Value

Total Sulphur

%

%

%

%

MJ/kg

%

6.8

25.5

31.3

36.5

20.6

3.6

 

The coal is considered suitable for the combustion process and typical of many coals used in power generation worldwide.

 

All values have been calculated on an air dried basis.

 

Subsequent to these latest results, the Company can now confirm the suitability of the both the Mkomolo and Namwele coals to provide a sustained and reliable fuel supply to a power plant project. The results provide a high degree of validation around the coal deposit quality and the subsequent fuel supply characteristics at Rukwa. This is critical where a power plant will rely on a single source of fuel as is the case in Tanzanian coal fired projects and the bulk sample work has been viewed as an essential step in moving the project forward to bankable status. Moving forward, the information gathered will directly contribute to the power plant design process.

 

The higher energy value coal, both in Mkomolo and Namwele, also has the potential to be sold into the market for local industrial usage and we are working with potential customers to determine suitable products.

 

 

Qualified Person Review

 

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

 

For further information please contact:

 

 

 

Edenville Energy Plc

Jeff Malaihollo - Chairman

Rufus Short - CEO

+44 (0) 20 7652 9788

 

Northland Capital Partners Limited

(Nominated Adviser)

Gerry Beaney

David Hignell

 

 

+44 (0) 20 3861 6625

 

Optiva Securities Limited

(Broker)

Jeremy King

Graeme Dickson

 

 

+44 (0) 20 3137 1902

IFC Advisory

(Financial PR and IR)

Tim Metcalfe

Graham Herring

Heather Armstrong

Miles Nolan

+44 (0) 20 3053 8671

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDFFLFWUFMSESE
Date   Source Headline
26th Nov 20137:00 amRNSEdenville Energy Strategy Update
22nd Oct 201311:49 amRNSGrant of Options
26th Sep 20138:43 amRNSHolding(s) in Company
24th Sep 20139:20 amRNSHolding(s) in Company
20th Sep 20137:01 amRNSHalf Yearly Report
20th Sep 20137:00 amRNSDirectorate Change
17th Sep 20138:00 amRNSDraw Down of Funds & Issue of Equity for drawdown
11th Sep 20137:00 amRNSEngagement of RAFCOGROUP & EIA Update
9th Sep 20137:00 amRNSRukwa Coal Project Scoping Study Results
30th May 201311:40 amRNSResult of AGM
7th May 20137:00 amRNSFinal Results
29th Apr 20138:57 amRNSHolding(s) in Company
22nd Apr 20138:23 amRNSDraw Down of Funds and Issue of Equity
22nd Apr 20137:00 amRNSOperational update
28th Mar 201311:51 amRNSHolding(s) in Company
27th Mar 20137:00 amRNS£5 million Financing Facility Agreed
26th Mar 20137:00 amRNSUpdated mineral resource estimate
19th Mar 20132:40 pmRNSHolding(s) in Company
7th Mar 20133:34 pmRNSHolding(s) in Company
5th Mar 20137:00 amRNSDirectorate Change
18th Feb 20137:00 amRNSAppointment of Non-Executive Director
13th Feb 20134:04 pmRNSHolding(s) in Company
21st Jan 20134:45 pmRNSHolding(s) in Company
15th Jan 201312:33 pmRNSHolding(s) in Company
10th Jan 20137:00 amRNSPositive drill results from the Muze deposit
27th Dec 20124:11 pmRNSHolding(s) in Company
26th Nov 20121:59 pmRNSHolding(s) in Company
21st Nov 20122:00 pmRNSHolding(s) in Company
16th Nov 20122:46 pmRNSExercise of Warrants
29th Oct 201212:04 pmRNSHolding(s) in Company
16th Oct 20124:01 pmRNSHolding(s) in Company
10th Oct 20129:08 amRNSHolding(s) in Company
8th Oct 20127:00 amRNSMkomolo Drill Results
2nd Oct 20127:00 amRNSChange of Adviser
19th Sep 20123:45 pmRNSHolding(s) in Company
17th Sep 20124:53 pmRNSHalf Yearly Report
28th Aug 20127:00 amRNSPositive Drill Results from the Rukwa Coal Project
20th Aug 20127:00 amRNSOption Exercised on Rukwa Coalfield Project
17th Aug 20124:53 pmRNSHolding(s) in Company
13th Aug 20129:45 amRNSInitial Mkomolo 2012 Drill Results
31st Jul 20127:00 amRNSRukwa Coalfield Update
12th Jul 20125:19 pmRNSHolding(s) in Company
4th Jul 201210:55 amRNSHolding(s) in Company
3rd Jul 20123:49 pmRNSHolding(s) in Company
3rd Jul 20127:00 amRNSNamwele Drilling Results
2nd Jul 20121:59 pmRNSHolding(s) in Company
27th Jun 20125:30 pmRNSHolding(s) in Company
27th Jun 201212:13 pmRNSResult of AGM
19th Jun 20122:30 pmRNSHolding(s) in Company
18th Jun 20123:57 pmRNSMuze Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.