Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive drill results from the Muze deposit

10 Jan 2013 07:00

RNS Number : 1982V
Edenville Energy PLC
10 January 2013
 



10th January 2013

 

Edenville Energy

("Edenville" or the "Company")

 

Positive Drill Results from Muze Deposit,

Rukwa Coal Project, Tanzania

 

Evaluation of small scale mining potential at Namwele

 

Edenville Energy plc (AIM:EDL), the coal focused African energy exploration and development company, today announces receipt of the diamond drill core float and sink assay results from drillholes MZ12-01, -02, -03 and -04 and -05; collared and drilled at the Muze Deposit on the Rukwa Coalfield project in south western Tanzania in the latter part of the 2012 drill season. Muze is located 10km northeast of Mkomolo.

 

Highlights:

·; The Company's maiden drilling programme at Muze confirms coal with similar characteristics to that defined in the Mkomolo JORC compliant resource of 39 million tonnes sub-bituminous thermal coal

·; Coal measures intersected outside of the identified JORC resource block; these will add to the overall project resource

·; Preliminary draft of Environmental Impact Assessment ("EIA") for Namwele/Mkomolo pending comments from Tanzania's National Environment Management Council

·; Evaluation of small scale mining potential at Namwele to be undertaken with external consultants with a view to generating near-term revenues

 

Float and sink analysis results have been received for all the Muze drillholes completed during the first phase drill programme at the end of 2012 (MZ12-01, MZ12-02, MZ12-03, MZ12-04 and MZ12-05). All drill holes are located within the known outline of the Muze deposit with holes covering a strike length of 1,100m. Muze lies outside of the area defining the April 2012 resource statement.

 

These results have confirmed both thermal coal grades and the continuity of coal measures within the area. Coal measures intersected vary from 10 to 36m in thickness, with strong upside potential for the Muze resource to increase significantly, as future step-out drilling into the deeper interpreted portion of the basin is completed.

 

In terms of corporate strategy, the Company is also in the process of evaluating the small scale mining potential at Namwele, located 4km to the south east of Mkomolo. This will potentially provide near-term cash flow generation and a greater level of technical information on the deposit. Initial discussions held in Tanzania have indicated a local market exists for Edenville's thermal coal. Small scale mining has taken place at Namwele previously, with the coal being sold as lump-coal to end users in Mbeya, an industrial centre located some 330km by road. The major arterial roads in this part of Tanzania are in the process of being tarred (financed through the Millennium Fund) which is expected to have a positive impact on Edenville's costs.

 

An update on the EIA has been received from our consultants in Tanzania. The preliminary draft of the EIA Report for the Mkomolo/Namwele Project portion of the Rukwa Coalfield was submitted to the National Environment Management Council (NEMC) on 29th September 2012. The comments from NEMC are pending. Once this has been received and any comments addressed, the process will continue with the Environmental Certificate being included into the Feasibility Study being conducted by the consultants.

 

Simon Rollason, Chairman of Edenville, commented today: "I am pleased to announce these very encouraging initial results from Muze. The results will have a positive impact on the resource statement when it is updated and emphasise the highly prospective nature of the project. Our intention in 2013, alongside the continued drilling at Muze, is to evaluate the feasibility of initiating small scale mining of the Namwele deposit; this has the potential of generating near-term revenues.

 

Additionally, discussions continue with a number of parties who have shown interest in partnering with Edenville to build a mine-mouth power station on the project, utilising the Mkomolo and Muze coal via an off-take agreement. Our previously stated objective of increasing the confidence in the quantity and quality of Edenville's existing resource at the Rukwa coal project remains firmly in place."

 

Coal Quality and Resource Testing

 

Float & sink analysis from holes MZ12-01, MZ12-02, MZ12-03, MZ12-04 and MZ12 cored during the 2012 drill programme has now been received from the Alfred H Knight Laboratory, Scotland, an internationally accredited coal analysis laboratory. This analysis indicates the amount (% yield) and quality of coal that could be obtained from the deposit by mining and processing.

 

The coal bearing strata, defined here as the Coal Measures, intersected by the drillholes comprises an interlaminated/interbedded sequence of coals and mudstones, which includes coal-rich horizons comprising a high proportion of coal.

 

All drillholes were drilled vertically.

 

Extracts from the results are summarised below:

 

 

 

Hole ID

From (m)

To (m)

Interval (m)

Wash R.D.

Moisture %

Ash %

Volatile %

F.C. %

Sulphur %

Gross C.V. MJ/kg

Yield %

MZ12-01

25.07

25.63

0.56

F1.70

3.8

30.1

28.2

37.9

3.63

19.490

61.1

33.42

35.08

1.66

F1.80

3.9

30.8

30.3

35.1

2.85

19.430

72.8

35.08

38.78

3.70

F1.80

4.0

28.1

30.5

37.4

2.07

20.326

69.2

38.78

40.88

2.10

F1.80

3.9

26.5

29.6

40.0

3.00

20.966

79.0

55.87

56.48

0.61

F1.70

3.4

31.7

28.5

36.4

3.51

19.033

75.7

56.48

57.39

0.91

F1.80

4.5

33.7

22.4

39.4

3.14

18.149

89.8

MK12-02

145.10

146.73

1.63

F1.70

5.8

31.5

30.1

32.6

3.61

18.452

62.8

148.75

149.40

0.65

F2.00

4.2

26.2

30.5

39.0

2.55

20.917

92.9

150.30

151.22

0.92

F1.80

4.7

31.7

27.6

36.0

2.30

18.844

44.2

149.40

150.30

0.90

F1.80

5.5

29.9

26.9

37.8

1.96

19.699

42.8

151.22

152.35

1.13

F1.90

5.1

27.8

28.2

39.0

2.54

20.025

86.7

153.65

155.80

2.15

F1.80

5.7

22.4

30.2

41.7

3.39

21.912

76.5

154.33

155.80

1.47

F1.80

5.0

30.2

26.4

38.4

2.64

19.254

51.5

MK12-03

107.60

108.38

0.78

F1.90

4.2

31.3

27.4

37.1

2.09

18.612

82.5

110.60

111.50

0.90

F1.80

4.6

30.2

27.5

37.6

1.97

19.635

71.5

111.50

113.65

2.15

F1.80

5.0

29.0

29.3

36.7

2.00

19.878

68.8

114.07

115.74

1.67

F1.90

5.2

28.1

28.4

38.4

2.56

20.241

73.6

116.60

117.28

0.68

F1.80

5.5

26.5

29.4

38.6

2.95

20.895

47.2

125.79

126.62

0.83

F1.90

4.7

29.4

26.8

39.1

2.04

19.809

83.0

MZ12-04

172.03

173.40

1.37

F1.90

3.8

29.8

28.5

37.9

2.37

19.738

61.3

MZ12-05

59.40

60.05

0.65

F1.80

5.1

30.4

29.2

35.3

2.20

19.007

53.4

57.25

59.40

2.15

F1.90

6.8

28.4

30.8

34.1

2.15

19.628

69.3

60.05

60.85

0.80

F1.90

6.7

22.2

32.5

38.6

3.98

21.867

90.6

60.85

62.80

1.95

F1.80

6.2

26.7

30.6

36.5

2.81

20.243

80.5

82.77

84.25

1.48

F1.90

5.7

27.0

22.8

44.5

2.66

20.502

94.6

84.25

85.00

0.75

F1.70

4.8

35.7

22.8

36.7

2.78

17.316

48.3

Cumulative Results from Fractional analysis (Results are reported on an air-dry basis)

 F.C. - Fixed Carbon, C.V. - Calorific Value

 

In accordance with the AIM Rules, the information in this announcement has been reviewed by Mark J. Pryor, Chief Executive Officer of Edenville Energy plc, a qualified geologist with over 25 years' experience.

 

Contact:

 

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7653 9855 

finnCap

Charlotte Stranner/Geoff Nash

+44 (0) 20 7220 0500

Newgate Threadneedle

Graham Herring/Richard Gotla

+44 (0) 20 7653 9855

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIELFIAIIV
Date   Source Headline
16th Aug 20237:00 amRNSAppointment of Joint Corporate Broker
15th Aug 20237:00 amRNSChange of Admission Date
3rd Aug 20235:40 pmRNSResult of AGM,Directorate Change,Director Dealings
10th Jul 20237:00 amRNSNotice of AGM
4th Jul 202311:14 amRNSHolding(s) in Company
30th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
22nd Jun 20232:51 pmRNSHolding(s) in Company
21st Jun 20235:43 pmRNSHolding(s) in Company
19th Jun 20235:28 pmRNSHolding(s) in Company
5th Jun 20239:30 amRNSHolding(s) in Company
2nd Jun 202311:25 amRNSHolding(s) in Company
2nd Jun 20237:00 amRNSProposed Change of Name
1st Jun 20239:05 amRNSStrategic Investment and Board Changes
24th May 202312:33 pmRNSHolding(s) in Company
23rd May 20234:01 pmRNSHolding(s) in Company
11th Apr 20237:00 amRNSRukwa Production Update
28th Mar 20239:16 amRNSRukwa Operational Update
24th Mar 20234:54 pmRNSHolding(s) in Company
9th Feb 20237:00 amRNSRukwa Operational Update
16th Dec 20229:07 amRNSHolding(s) in Company
14th Dec 20229:26 amRNSHolding(s) in Company
13th Dec 202211:38 amRNSHolding(s) in Company
13th Dec 202210:21 amRNSRejection of Unfair Dismissal Claim
7th Dec 20229:39 amRNSHolding(s) in Company
6th Dec 20227:00 amRNSPlacing to raise £0.4 million & Operational Update
9th Nov 20227:00 amRNSRukwa Operational Update & Corporate Update
13th Oct 20227:00 amRNSDirectors’ Dealings
11th Oct 20227:00 amRNSRukwa Coal Project Operational Update
29th Sep 20229:48 amRNSInterim Results
18th Aug 20225:20 pmRNSDirectors’ Dealings
16th Aug 20227:00 amRNSNew Coal Mining Agreement
4th Aug 20227:00 amRNSDirectorate Change
3rd Aug 20222:05 pmRNSSecond Price Monitoring Extn
3rd Aug 20222:00 pmRNSPrice Monitoring Extension
3rd Aug 202212:00 pmRNSCorporate Update
3rd Aug 202211:27 amRNSResult of AGM
8th Jul 20224:30 pmRNSNotice of AGM
5th Jul 20227:00 amRNSBoard Changes
30th Jun 20227:00 amRNSResults for the year ended 31 December 2021
31st May 20227:00 amRNSTermination of Coal Mining Agreement
26th May 20223:46 pmRNSHolding(s) in Company
18th May 20221:15 pmRNSOperational Update Rukwa Coal Project
4th May 20223:52 pmRNSOperational Update Rukwa Coal Project
3rd Feb 20221:20 pmRNSNew Coal Mining Agreement Signed
12th Jan 20227:00 amRNSAppointment of Broker
4th Jan 20227:00 amRNSAppointment of Interim Broker
7th Dec 20212:06 pmRNSSecond Price Monitoring Extn
7th Dec 20212:01 pmRNSPrice Monitoring Extension
7th Dec 202111:06 amRNSSecond Price Monitoring Extn
7th Dec 202111:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.