Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Namwele Drilling Results

3 Jul 2012 07:00

RNS Number : 7164G
Edenville Energy PLC
03 July 2012
 



3rd July 2012

 

EDENVILLE ENERGY PLC ("Edenville" or the "Company")

 

Namwele Drilling Results

 

Edenville Energy plc (AIM:EDL), the African coal exploration and development company, is pleased to announce that all the remaining results from the 2011 drill program at Namwele have now been received.

 

The Namwele Project lies 4km to the south east of the Mkomolo Deposit, where a JORC compliant inferred resource of 39 million tonnes of thermal coal was defined by Edenville earlier this year. Namwele hosts an old open pit mine which was previously worked on a small scale providing lump coal to industries located at Mbeya, some 300km to the south by road.

 

In late 2011 Edenville drilled eight vertical diamond drill holes close to the Namwele open pit and out along strike of the coal mineralisation. In total, 869.80 metres were drilled covering a strike length of 2.2 kilometres. Float & Sink analysis of the samples was conducted at the Inspectorate Laboratory in South Africa, with the analysis indicating the amount (per cent yield) and quality of coal that could be obtained from the deposit by mining and processing.

 

Hole No.

From

To

Interval

Moisture

Ash

Volatile

F.C.

Sulphur

Gross C.V.

Cumulative Yield

(m)

(m)

(m)

%

%

%

%

%

MJ/kg

%

NM11-01

85.82

86.82

1.00

4.9

36.8

20.9

37.3

0.7

17.2

34.0

NM11-02

124.85

127.50

2.65

4.6

31.4

27.2

36.8

3.1

19.9

25.2

NM11-02

127.50

129.62

2.12

4.4

30.4

29.1

36.0

3.0

19.7

42.6

NM11-03

Low quality intersections within coal measures intersected between 76.30 - 87.30m

NM11-04

28.00

28.61

0.61

4.5

30.5

30.1

34.8

5.5

19.8

73.4

NM11-04

28.61

31.61

3.00

5.2

30.3

29.5

35.0

5.5

19.5

23.0

NM11-04

31.61

32.60

0.99

5.2

33.1

27.0

34.7

3.6

18.8

24.3

NM11-05

79.05

81.45

2.40

5.7

27.5

30.1

36.7

6.1

20.3

62.3

NM11-05

82.52

83.98

1.46

5.7

35.2

26.0

33.2

3.2

17.9

29.7

NM11-05

85.00

85.79

0.79

5.7

35.2

26.0

33.2

3.2

17.9

29.7

NM11-06*

Abandoned above coal measures

NM11-07

91.10

92.21

1.11

5.2

34.4

29.2

31.2

6.0

17.9

100.0

NM11-07

92.21

93.62

1.41

4.8

30.6

29.3

35.3

7.2

19.1

26.4

NM11-08

103.68

106.50

2.82

5.4

32.4

27.0

35.1

6.4

18.5

40.9

Cumulative Results from Fractional analysis (Results are reported on an air-dry basis)

 F.C. - Fixed Carbon, C.V. - Calorific Value

*NM11-06 was abandoned at 127.00m and did not reach the coal measures sequence.

 

The drill spacing was not close enough to produce a JORC-compliant resource tonnage estimate however results confirm the quality and continuity of coal mineralisation at Namwele. Drilling was conducted at the end of the field season and it is the intention of the company to return to Namwele to drill sufficient in-fill holes as to allow for a resource estimation to be undertaken.

 

The planned down-hole geophysics has been delayed to mid-July as the drill contractor has yet to deliver the correct equipment to site in order to flush clean the 2011 drill holes selected for geophysical logging. It is likely that additional down-hole geophysics will be undertaken during the course of the current drill programme.

 

In accordance with the AIM Rules, the information in this announcement has been reviewed by Mark Pryor, Managing Director of Edenville Energy PLC, a qualified geologist with over 25 years' experience.

 

Commenting today Simon Rollason, Chairman of Edenville, said; "The initial drill programme and sampling at Namwele has confirmed the presence of coal bearing strata extending out along strike from the previous workings and occurring at depth. These results provide the basis for follow-up drilling in 2012 which will enable a JORC compliant resource to be calculated for Namwele, adding to the overall coalfield resource tonnage. Edenville's field geologists are actively mapping and sampling the Namwele and Muze Deposits which will enable our team to accurately locate additional drillholes. Drilling is currently in progress at Mkomolo with the objective of upgrading and expanding the current resource. We look forward to providing further market updates during the field season as this exciting project continues to develop and grow. We remain fully funded to complete our planned programme for this year."

Contact:

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7099 1940 

ZAI Corporate Finance Ltd

Ray Zimmerman/ Marc Cramsie

+44 (0) 20 7060 2220

Newgate Threadneedle

Grahame Herring/Richard Gotla

+44 (0) 20 7653 9855

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRLLFVEDDIFIIF
Date   Source Headline
16th Aug 20237:00 amRNSAppointment of Joint Corporate Broker
15th Aug 20237:00 amRNSChange of Admission Date
3rd Aug 20235:40 pmRNSResult of AGM,Directorate Change,Director Dealings
10th Jul 20237:00 amRNSNotice of AGM
4th Jul 202311:14 amRNSHolding(s) in Company
30th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
22nd Jun 20232:51 pmRNSHolding(s) in Company
21st Jun 20235:43 pmRNSHolding(s) in Company
19th Jun 20235:28 pmRNSHolding(s) in Company
5th Jun 20239:30 amRNSHolding(s) in Company
2nd Jun 202311:25 amRNSHolding(s) in Company
2nd Jun 20237:00 amRNSProposed Change of Name
1st Jun 20239:05 amRNSStrategic Investment and Board Changes
24th May 202312:33 pmRNSHolding(s) in Company
23rd May 20234:01 pmRNSHolding(s) in Company
11th Apr 20237:00 amRNSRukwa Production Update
28th Mar 20239:16 amRNSRukwa Operational Update
24th Mar 20234:54 pmRNSHolding(s) in Company
9th Feb 20237:00 amRNSRukwa Operational Update
16th Dec 20229:07 amRNSHolding(s) in Company
14th Dec 20229:26 amRNSHolding(s) in Company
13th Dec 202211:38 amRNSHolding(s) in Company
13th Dec 202210:21 amRNSRejection of Unfair Dismissal Claim
7th Dec 20229:39 amRNSHolding(s) in Company
6th Dec 20227:00 amRNSPlacing to raise £0.4 million & Operational Update
9th Nov 20227:00 amRNSRukwa Operational Update & Corporate Update
13th Oct 20227:00 amRNSDirectors’ Dealings
11th Oct 20227:00 amRNSRukwa Coal Project Operational Update
29th Sep 20229:48 amRNSInterim Results
18th Aug 20225:20 pmRNSDirectors’ Dealings
16th Aug 20227:00 amRNSNew Coal Mining Agreement
4th Aug 20227:00 amRNSDirectorate Change
3rd Aug 20222:05 pmRNSSecond Price Monitoring Extn
3rd Aug 20222:00 pmRNSPrice Monitoring Extension
3rd Aug 202212:00 pmRNSCorporate Update
3rd Aug 202211:27 amRNSResult of AGM
8th Jul 20224:30 pmRNSNotice of AGM
5th Jul 20227:00 amRNSBoard Changes
30th Jun 20227:00 amRNSResults for the year ended 31 December 2021
31st May 20227:00 amRNSTermination of Coal Mining Agreement
26th May 20223:46 pmRNSHolding(s) in Company
18th May 20221:15 pmRNSOperational Update Rukwa Coal Project
4th May 20223:52 pmRNSOperational Update Rukwa Coal Project
3rd Feb 20221:20 pmRNSNew Coal Mining Agreement Signed
12th Jan 20227:00 amRNSAppointment of Broker
4th Jan 20227:00 amRNSAppointment of Interim Broker
7th Dec 20212:06 pmRNSSecond Price Monitoring Extn
7th Dec 20212:01 pmRNSPrice Monitoring Extension
7th Dec 202111:06 amRNSSecond Price Monitoring Extn
7th Dec 202111:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.