Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCeres Power Regulatory News (CWR)

Share Price Information for Ceres Power (CWR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 181.40
Bid: 182.70
Ask: 184.00
Change: -0.40 (-0.22%)
Spread: 1.30 (0.712%)
Open: 186.00
High: 192.60
Low: 179.50
Prev. Close: 181.80
CWR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Half Yearly Report

30 Mar 2011 07:00

RNS Number : 8693D
Ceres Power Holdings plc
30 March 2011
 



 

30 March 2011

 

Ceres Power Holdings plc

 

Interim results for the six months ended 31 December 2010

 

Ceres Power Holdings plc ("Ceres", "Ceres Power" or "the Group") announces its interim results for the six months ended 31 December 2010.

 

Highlights:

·; Secured CE safety approval for CHP product in-home consumer field trials

·; Successful live demonstration of CHP product delivering flexible power on demand

·; Improved fuel cell module heat-to-power ratio

·; Net cash and short-term investments of £34.2m

  

Financial Highlights:

 

Six months ended 31 December 2010

(Unaudited)

Six months ended 31 December 2009

(Unaudited)

£'000

£'000

Revenue

395

295

Other operating income

98

104

Operating loss

(7,403)

(6,004)

Interest receivable

297

204

Loss for the financial period

(5,932)

(5,919)

Loss per share

(6.88)p

(8.62)p

Net cash and short-term investments

34,217

46,134

 

 

 

Initial Feedback from Consumer Field Trials

On 1 February 2011, the Group announced the first installation under in-home consumer field trials. Over the course of the last eight weeks a further four units have been successfully installed.

The purpose of this initial wave of field trials was to gain valuable real-world experience and to identify any early issues ahead of deploying the next wave of field trial units later this year.

These CHP products, installed and operated in family homes across South East England, have replaced the existing conventional boilers and are fully integrated with the home's existing energy infrastructure including gas, heating, hot water and electricity.

The initial results from the field trials confirm that the CHP product delivers the core functionality of central heating, hot water and power. The product controls itself automatically, responding in real-time using a combination of the unit's fuel cell module and boiler function. Results have also shown the ability of the units to deliver significant product 'up-time' without loss of home comfort, with one unit exceeding 94% availability.

The trials have also highlighted some reliability and durability issues which are being addressed. These include: boiler tuning/calibration, water management, operating strategy and ingress of debris into the fuel cell module. Further details are included in the Residential CHP Product Programme section of the Chief Executive Officer's statement.

We are continuing to run these CHP products in the field to gather further valuable information relating to operation in real home environments. In parallel we are working to address the CHP product reliability and durability issues identified in the first wave of field trials prior to commencing the next wave of field trials.

 

 Brian Count, Chairman, commented:

"Since successfully demonstrating a Ceres Power CHP product generating on-demand heat and power in September, the Group has moved forward with the beta testing phase, securing CE approval and installing and operating CHP units in consumers' homes. We are pleased with the continued improvements made to the product's performance over the past six months. System reliability and durability challenges require further work and are being addressed. We remain confident in the potential for the group's CHP product in the UK and entry into international markets in the future."

 

For further information contact:

Ceres Power Holdings plc

Peter Bance, Chief Executive/ Rex Vevers, Finance Director

 

Tel. +44 (0)1403 273463

 Morgan Stanley & Co International Limited

Tel. +44 (0)20 7677 5044 

Peter Moorhouse/Alastair Walmsley

 

Jefferies International Limited

Tel. +44 (0)207 029 8000

Chris Snoxall

 

Kreab Gavin Anderson & Company

Tel. +44 (0)20 7074 1800

Ken Cronin/Deborah Walter

www.cerespower.com

 

Chairman's Statement

 

Business overview

During this first half year the key achievements of the Group have been:

Ø Live demonstration of the Group's natural gas wall-mounted Combined Heat and Power (CHP) product;

Ø CE safety certification of Ceres CHP product secured enabling in-home consumer trials; and

Ø Five CHP products installed and operated in occupied consumers' homes.

 

The CHP product demonstration in September 2010 confirmed the Group's ability to engineer its technology into a compact, wall-mounted CHP domestic appliance that can operate in peoples' homes. The successful demonstration highlighted the product's key differentiating features, in particular, the ability automatically to produce appropriate levels of power in response to rapidly changing demand.

Having secured the required CE certification, the commencement of the first wave of field trials of CHP products in people's homes in January marked a very important transition into real-world environments. The initial results from these trial units have provided real-world evidence of the product's ability to deliver homes' heat and power requirements. However, initial data has also identified challenges relating to product reliability and durability. The Group is now focusing on addressing these challenges in advance of deploying the second wave of field trials and ahead of initial sales.

Our strategy remains to deliver a mass market residential CHP product for customers in the UK as well as developing growth opportunities in markets internationally to help build shareholder value. Further work including field trial and internal testing will continue over the next 6 months and will inform the expected timing for the next wave of field trials and the programme to initial sales.

Low carbon despatchable power

It is now increasingly recognised that to achieve the UK's emissions reductions targets requires the mass deployment of a range of renewable and low-carbon technologies. The energy debate has been focused on energy production, but now the demand side (how energy is used) is being given more importance. Distributed generation, and in particular flexible despatchable microgeneration, such as from Ceres Power's gas-fed residential CHP product, will be needed both to increase overall energy efficiency at the residential level and also to improve security of supply given the inflexible characteristics of renewable and nuclear power that is planned to provide a significant proportion of wholesale electricity generation in the years to come.

Renewed support for cost-effective microgeneration solutions

Following the implementation of the Feed-in Tariff (FIT) for residential microgeneration in the UK in April 2010, the UK Government has confirmed that the scheme is intended to accelerate the early uptake of cost-effective low carbon technologies. Ceres Power's CHP product has the potential to be one of the lowest cost ways to reduce carbon in the existing housing stock, which accounts for 27% of the country's total carbon emissions and is one of the most difficult sectors to address. We welcome the review of the FIT that was announced by the UK Government's Department of Energy and Climate Change (DECC) in February 2011; the objective of which is to re-align the FIT to stimulate the uptake of the most cost-effective technologies. The outcome of the review is expected to take effect in April 2012 and we look forward to working with DECC and demonstrating the sustainable benefits of our technology for both the retrofit and new build housing sectors. The nature of initial support for low carbon technologies, together with feedback from early adopter target customers, will help inform our approach with British Gas to progress from initial sales into volume deployment.

We are also working with the Government as part of the consultation on the Country's Microgeneration Strategy to identify ways in which mass deployment of microgeneration can help address the challenges of energy efficiency, fuel poverty and energy security whilst stimulating the growth of a vibrant UK-based CleanTech sector creating large numbers of green collar jobs.

People

I would again like to thank our employees who have shown outstanding commitment and enabled the key achievements during this half year. We continue to build a team of dedicated and talented people who have demonstrated their determination to realise the goal of deploying Ceres CHP products in volume across the UK and new markets internationally.

Brian Count

Chairman

 

 

 

Chief Executive Officer's Statement

 

Business Review

During the last six months Ceres Power has continued to make progress with the beta testing phase of our CHP product for the UK market. Following the successful public demonstration and the receipt of CE approval, we have now started field trials of our wall-mounted CHP product in occupied family homes. We are pleased that in this first test of our products in a real-world environment, the units were successfully installed; replacing existing boilers and delivering heat and power to meet homes' requirements. Initial data from the trials has also identified some reliability and durability challenges which are in the process of being addressed.

Residential CHP Product Programme

During our live product demonstration in September 2010, the CHP unit's ability to deliver heat for hot water and central heating needs and electricity on demand for a range of domestic appliances was shown with the product integrated into a representative home environment. In addition to these core design functions, the unique ability of the product to respond automatically and rapidly to real-time changing energy needs in the home was also demonstrated. This rapid electricity load-following capability is a feature of our lightweight, metal-supported, low temperature solid oxide fuel cell technology and is a major differentiator. Our partner Centrica has confirmed that this load-following capability will have increasing commercial value as the CHP product is deployed in volume and contributes to the future demands of the electricity network. Not only does this enable access to the broadest range of households as target customers, but the ability to increase or decrease power output on-demand will be of significant value to utilities and network operators in the future as the electricity network demands flexible, controllable low carbon generation.

In December 2010, the Group received CE safety approval for its CHP product from Kiwa Gastec, the leading fuel cell and residential CHP certification regulatory body. Receipt of this critical approval is an important achievement and has allowed Ceres Power's CHP product to be installed and operated in occupied consumer homes as part of the first phase of the field trials programme.

Following the receipt of the official CE safety certificate, the Group has completed the installation of the first wave of field trial units during early 2011. This represents another significant step forward for Ceres. The purpose of this initial wave of field trials was to gain valuable real-world experience and to identify any early issues ahead of the larger number of field trial products to be deployed in preparation for initial sales.

The first five field trial units installed and operated in family homes across South East England have demonstrated the product's ability to integrate into the home's existing energy infrastructure including gas, heating and electricity. These compact wall-mounted CHP products have directly replaced conventional gas boilers and are installed in the same space in the home. The initial trials are being conducted together with British Gas to help learn how the units are installed, serviced and maintained in the field.

The initial results from the field trial units confirm that the CHP products can deliver the core functionality of central heating, hot water and power in a range of occupied family homes. The CHP product controls itself automatically, responding in real time using a combination of the unit's fuel cell module and boiler function. Results have also shown the ability of the units to deliver significant product 'up-time' without loss of home comfort.

The trials have also highlighted some system reliability issues associated with boiler tuning/calibration and water management within the CHP system. The boiler issues are being addressed in the field and we are working in partnership with our suppliers to validate any changes necessary in the next design iteration for the second wave of field trials. The CHP water management issue was causing a controlled shut down of the fuel cell module, and has been addressed with an interim solution. The permanent engineered solution is likely to involve both minor hardware modifications and optimisation of the product's operating strategy.

The durability of the fuel cell modules within the CHP field trial units has not matched fuel cell module test stand results previously achieved. While further analysis is required, initial indications are that this could be due to the following issues. Firstly, the operating strategy we have selected for this first wave of in-home trials has not yet been optimised and causes the units to enter regions of the operating spectrum which are detrimental to the fuel cell module. This is currently being addressed through improvements in sensor and flow control to enable the tuning of the operational strategy. Secondly, there are indications of ingress of debris onto the cathode through the unit's air intake. This issue is being addressed through improved control of the build and installation process and isolation of the intake. We believe that these issues can be addressed within the next six months.

Since the CHP product demonstration in September 2010, we have focused on improving the power and efficiency of the cells. We have achieved a reduction in the heat-to-power ratio of the fuel cell stack (from 1.27:1 to 1.1:1) through a reduction of electronic leakage at cell level by optimisation of fuel cell manufacturing process conditions.

We have also demonstrated fuel cell module electrical efficiencies of up to 47%. However, these efficiency improvements may have resulted in a reduction in durability, and we are now exploring the nature of the stack performance/durability trade-offs involved to inform the optimised solution going forward. The emphasis of this work is on improving corrosion-resistant stack interconnect coatings which have a significant effect on degradation/performance. We are working with our supply chain partners to develop and test modified interconnect designs and coatings. Other improvements in thermal management and systems integration are expected to deliver further gains in the heat-to-power ratio which in turn will enable reduced parasitic electrical loads (e.g. air blower) and thereby increase the electrical efficiency of the CHP unit. In addition, we are exploring ways to expand the operating envelope of the cells by strengthening the cell layer bonds with changes in cell manufacturing processes. We believe that the current programme of work underway in both these areas will enable progress to be made towards achieving the appropriate performance/durability envelope.

We are continuing to run these initial CHP products in the field to gather further valuable information relating to operation in real home environments. We remain confident that our product will be an attractive consumer proposition but the issues we have identified mean that there is now an increased level of risk in our go-to-market programme.

Operations and Manufacturing

The current field trials are being conducted using CHP products with the fuel cell modules manufactured in the Horsham factory and CHP boiler assemblies supplied from Daalderop's boiler assembly plant in Holland.

Internally, the key operational focus of the past 6 months has been the establishment of repeatable production processes and the necessary business systems to support volume operations. In parallel, a transition plan towards full compliance with a range of quality management and HSE standards has been initiated, including ISO 9001 & 18001.

The Group has continued to recruit experienced personnel across the business focusing on critical technical areas such as controls and electronics, systems engineering and establishing an in-field capability to support CHP products being deployed in consumers' homes by our partners' service organisations.

Commercial

In last year's Annual Report we noted that the Group was beginning to explore longer term opportunities for Ceres' CHP products in other international markets in conjunction with potential channel partners and in markets where the unique features of the Group's technology, like its rapidly despatchable energy output and the compact wall-mounted product format, could deliver substantial value to both households and energy companies.

Our primary focus remains on completing the current field trial programme with British Gas and then growing sales in the UK market. Nevertheless, with the significant progress achieved over the last half year, we are starting to explore new opportunities that could deliver significant value in conjunction with strong go-to-market channel partners internationally.

In preparation for the deployment of our products in volume, we are progressing a number of inter-connected activities relating to the creation of an attractive consumer-facing and utility-facing product proposition. During this year and next year's trials, we are working with British Gas' engineering training academies to ensure the installation, service and maintenance of our product is well understood and documented. We are also collaborating with their in-field representatives to begin to raise awareness of our offering, establish how best to market it (including product naming) and to start identifying potential early adopter customers.

We are working closely with British Gas' New Energy team to ensure that the way the CHP product is integrated with other technologies (including smart meters, home area networks, and on-line home energy services) is optimised to exploit the potential benefits of the 'smart home' and the 'smart grid' from the perspectives of both the household and the utility company.

Financial

Commercial revenue for the period increased by 34% to £0.4 million (2010: £0.3m) reflecting the progress made on the natural gas CHP programme with British Gas and the Group's accounting policy of recognising up-front milestone payments from development contracts as revenue when earned, based on costs incurred over the Beta and Gamma phases. Deferred income from commercial customers, representing income to be recognised as revenue in future accounting periods and recorded on the balance sheet was £2.8 million (2010: £3.6 million). Other operating income arising from government grants was £0.1 million (2010: £0.1 million).

Operating costs for the period increased as planned by 23% to £7.9 million (2010: £6.4 million). This increase arose from the annualised effect of the increased headcount already in place at the beginning of the financial period, costs of developing and procuring components and building and testing CHP units for the Beta phase of the programme with British Gas.

Interest receivable was £0.3 million (2010: £0.2 million) reflecting the higher average cash balance. During the period the Group recorded an income tax credit of £1.2 million (2010: £nil) representing the estimated R&D tax credit due in respect of 2011 of £0.3 million plus an adjustment of £0.9 million received in respect of 2010.

The loss for the period attributable to shareholders was £5.9 million (2010: £5.9 million) reflecting the increase in operating costs offset by the income tax credit. The loss per ordinary share fell by 20% to 6.88 pence (2010: 8.62 pence) primarily as a result of the increase in the average number of shares in issue during the period, following the share placing in December 2009.

Net cash used in operating activities decreased to £6.1 million (2010: £6.3 million) due to an income tax receipt of £1.5 million more than offsetting an increase in cash used in operations of £1.3 million. Cash outflow attributable to the purchase of property, plant and equipment (net of £0.6 million grants received) was £0.9 million (2010: £1 million) relating to the construction of test infrastructure and the purchase and installation of fuel cell manufacturing equipment. The resultant total equity-free cash outflow for the half year was lower at £6.7 million (2010: £7.0 million).

The Board continues to review the funding requirements of the business to commercialise the technology. At the period end, the Group held £34.2 million (2010: £46.1 million) in net cash and short-term investments.  

Outlook

The Group's priorities for the next six months are to continue with the current field trials and testing programmes in order to address the product reliability and durability issues in advance of the second wave of field trials being deployed. We are focused on resolving these issues and we will report in September on the results from this work and the programme for further field trials and initial sales.

Peter Bance

Chief Executive Officer

 

  

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

For the six months ended 31 December 2010

 

 

Six months ended 31 December 2010 (Unaudited)

Six months ended 31 December 2009 (Unaudited)

Year ended 30 June 2010 (Audited)

Note

£'000

£'000

£'000

Revenue

395

295

786

Operating costs

2

(7,896)

(6,403)

(14,543)

Other operating income

98

104

570

Operating loss

(7,403)

(6,004)

(13,187)

Fair value loss on gilts

-

(119)

(119)

Interest receivable

297

204

490

Loss before income tax

(7,106)

(5,919)

(12,816)

Income tax credit

1,174

-

1,093

Loss for the financial period / year and total comprehensive loss

(5,932)

(5,919)

(11,723)

Losses per £0.05 ordinary share expressed in pence per share:

Basic and diluted loss per share

3

(6.88)p

(8.62)p

(15.16)p

 

The accompanying notes are an integral part of these interim financial statements.

 

CONSOLIDATED BALANCE SHEET

As at 31 December 2010

31 December 2010 (Unaudited)

31 December 2009 (Unaudited)

30 June 2010 (Audited)

Note

£'000

£'000

£'000

Assets

Non-current assets

Property, plant and equipment

4,373

3,738

4,381

Other receivables

81

81

81

Total non-current assets

4,454

3,819

4,462

Current assets

Trade and other receivables

1,138

1,454

1,045

Derivative financial instruments

56

-

27

Current tax receivable

340

320

620

Short-term investments

6

10,000

12,000

25,000

Cash and cash equivalents

6

24,217

34,134

15,900

Total current assets

35,751

47,908

42,592

Liabilities

Current liabilities

Trade and other payables

(3,159)

(3,229)

(4,172)

Derivative financial instruments

-

(37)

-

Total current liabilities

(3,159)

(3,266)

(4,172)

Net current assets

32,592

44,642

38,420

Non-current liabilities

Other payables

(1,883)

(2,333)

(2,158)

Provisions for other liabilities and charges

(165)

(50)

(107)

Total non-current liabilities

(2,048)

(2,383)

(2,265)

Net assets

34,998

46,078

40,617

Equity

Share capital

4

4,309

4,309

4,309

Share premium account

64,821

64,826

64,821

Other reserve

7,463

7,463

7,463

Profit and loss account (deficit)

(41,595)

(30,520)

(35,976)

Total equity

34,998

46,078

40,617

 

The interim financial statements on pages 11 to 17 were approved by the Board of Directors on 29 March 2011 and were signed on its behalf by:

 

 

Peter Bance Rex Vevers

Director Director

 

The accompanying notes are an integral part of these interim financial statements. 

 

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

For the six months ended 31 December 2010

 

Share capital (Unaudited)

Share premium account (Unaudited)

Other reserve (Unaudited)

Profit and loss account (deficit) (Unaudited)

Total (Unaudited)

£'000

£'000

£'000

£'000

£'000

At 1 July 2009

3,344

35,551

7,463

(24,965)

21,393

Comprehensive income

Loss for the period

-

-

-

(5,919)

(5,919)

Total comprehensive income

-

-

-

(5,919)

(5,919)

Transactions with owners

Issue of shares, net of costs

965

29,275

-

-

30,240

Share-based payments charge

-

-

-

364

364

Total transactions with owners

965

29,275

-

364

30,604

At 31 December 2009

4,309

64,826

7,463

(30,520)

46,078

Comprehensive income

Loss for the period

-

-

-

(5,804)

(5,804)

Total comprehensive income

-

-

-

(5,804)

(5,804)

Transactions with owners

Issue of shares, net of costs

-

(5)

-

-

(5)

Share-based payments charge

-

-

-

348

348

Total transactions with owners

-

(5)

-

348

343

At 30 June 2010

4,309

64,821

7,463

(35,976)

40,617

Comprehensive income

Loss for the period

-

-

-

(5,932)

(5,932)

Total comprehensive income

-

-

-

(5,932)

(5,932)

Transactions with owners

Share-based payments charge

-

-

-

313

313

Total transactions with owners

-

-

-

313

313

At 31 December 2010

4,309

64,821

7,463

(41,595)

34,998

 

The accompanying notes are an integral part of these interim financial statements.

 

 

CONSOLIDATED CASH FLOW STATEMENT

For the six months ended 31 December 2010

 

Six months ended 31 December 2010 (Unaudited)

Six months ended 31 December 2009 (Unaudited)

Year ended 30 June 2010 (Audited)

Note

£'000

£'000

£'000

Cash flows from operating activities

Cash used in operations

5

(7,529)

(6,260)

(10,820)

Income tax received

1,454

-

793

Net cash used in operating activities

(6,075)

(6,260)

(10,027)

Cash flows from investing activities

Purchase of property, plant and equipment

(1,444)

(1,019)

(2,814)

Capital grant contributions to property, plant and equipment

573

-

252

Movement in short-term investments

15,000

(12,000)

(25,000)

Redemption of financial assets at fair value through profit or loss

-

9,553

9,553

Finance income received

275

320

454

Net cash generated from/(used in) investing activities

14,404

(3,146)

(17,555)

Cash flows from financing activities

Proceeds from issuance of ordinary shares

-

31,556

31,556

Net expenses of shares issued

-

(1,207)

(1,321)

Net cash generated from financing activities

-

30,349

30,235

Net increase in cash and cash equivalents

8,329

20,943

2,653

Exchange (losses)/gains on cash and cash equivalents

(12)

(15)

41

8,317

20,928

2,694

Cash and cash equivalents at beginning of period

15,900

13,206

13,206

Cash and cash equivalents at end of period

24,217

34,134

15,900

 

Reconciliation to net funds

Opening net funds

40,900

23,009

23,009

Net increase in cash and cash equivalents

8,317

20,928

2,694

(Decrease)/increase in short-term investments

(15,000)

12,000

25,000

Net decrease in financial assets at fair value through profit or loss

-

(9,803)

(9,803)

Closing net funds (note 6)

34,217

46,134

40,900

 

The accompanying notes are an integral part of these interim financial statements.

Notes to the interim financial statements for the six months ended 31 December 2010

 

1. Basis of preparation

The financial information has been prepared in accordance with all IFRS and International Financial Reporting Interpretations Committee ("IFRIC") interpretations that had been published by 31 December 2010 as endorsed by the European Union (EU). The Standards that will be applicable for the year ending 30 June 2011 are not known with certainty at the time of preparing the interim results. Accordingly, the accounting policies for that accounting period will be determined finally only when the annual financial statements for the year ending 30 June 2011 are prepared.

This interim report, which comprises the consolidated statement of comprehensive income, the consolidated balance sheet, the consolidated statement of changes in equity, the consolidated cash flow statement and the related notes, is unaudited and does not constitute audited accounts within the meaning of the Companies Act 2006. The accounts for the year ended 30 June 2010, on which the auditors gave an unqualified audit opinion, have been filed with the Registrar of Companies.

The accounting policies adopted are consistent with those of the financial statements for the year ended 30 June 2010, as described in those financial statements. As at the date of signing the interim financial statements, there are no new Standards likely to affect the financial statements for the year ending 30 June 2011.

 

2. Operating costs

Operating costs are split as follows:

Six months ended 31 December 2010 (Unaudited)

Six months ended 31 December 2009 (Unaudited)

Year ended 30 June 2010 (Audited)

£'000

£'000

£'000

Research and development costs

5,428

4,148

9,907

Administrative expenses

2,468

2,255

4,636

7,896

6,403

14,543

 

 

3. Loss per share

Six months ended 31 December 2010 (Unaudited)

Six months ended 31 December 2009 (Unaudited)

Year ended 30 June 2010 (Audited)

£'000

£'000

£'000

Loss for the financial period / year attributable to shareholders

(5,932)

(5,919)

(11,723)

Weighted average number of shares in issue

86,177,614

68,666,156

77,349,920

Loss per £0.05 ordinary share (basic & diluted)

(6.88)p

(8.62)р

(15.16)p

 

 

 

Notes to the interim financial statements for the six months ended 31 December 2010

 

4. Share capital

Ceres Power Holdings plc had called-up share capital totaling 86,177,614 ordinary shares of £0.05 each at 30 June 2010 as disclosed in the statutory financial statements of Ceres Power Holdings plc for the year ended 30 June 2010.

There was no movement in share capital during the six months ended 31 December 2010.

 

5. Cash used in operations

Six months ended 31 December 2010 (Unaudited)

Six months ended 31 December 2009 (Unaudited)

Year ended 30 June 2010 (Audited)

£'000

£'000

£'000

Loss before income tax

(7,106)

(5,919)

(12,816)

Adjustments for:

Fair value loss on gilts

-

119

119

Other finance income

(297)

(204)

(490)

Depreciation of property, plant and equipment

620

525

1,115

Share-based payments charge

313

364

712

Operating cash flows before movements in working capital

(6,470)

(5,115)

(11,360)

Increase in trade and other receivables

(45)

(1,012)

(477)

(Decrease) / increase in trade and other payables

(1,072)

(153)

940

Increase in provisions

58

20

77

(Increase) / decrease in working capital

(1,059)

(1,145)

540

Cash used in operations

(7,529)

(6,260)

(10,820)

 

 

Notes to the interim financial statements for the six months ended 31 December 2010

 

6. Net cash, short-term investments and financial assets

 

31 December 2010 (Unaudited)

31 December 2009 (Unaudited)

30 June 2010 (Audited)

£'000

£'000

£'000

Cash at bank and in hand

578

796

1,033

Short-term bank deposits < 3 months

17,816

3,000

9,041

Money market funds

5,823

30,338

5,826

Cash and cash equivalents

24,217

34,134

15,900

Short-term investments (bank deposits > 3 months)

10,000

12,000

25,000

34,217

46,134

40,900

 

The Group typically places surplus funds into pooled money market funds, bank deposits with durations of up to twelve months and UK Government gilts with durations of up to twelve months. The Group's treasury policy restricts investments in short-term sterling money market funds to those which carry short-term credit ratings of at least two of AAAm (Standard & Poor's), Aaa/MR1+ (Moody's) and AAA V1+ (Fitch) and deposits with banks having a minimum long -term rating of AA-/AA-/Aa3 and short-term rating of F1+/A-1/P-1 for banks which the UK Government holds less than 25% ordinary equity.

 

 

Independent review report to Ceres Power Holdings plc

 

Introduction

We have been engaged by the company to review the condensed set of financial statements in the half-yearly financial report for the six months ended 31 December 2010, which comprise the consolidated statement of comprehensive income, the consolidated balance sheet, the consolidated statement of changes in equity, the consolidated cash flow statement and related notes. We have read the other information contained in the half-yearly financial report and considered whether it contains any apparent misstatements or material inconsistencies with the information in the condensed set of financial statements.

 

Directors' responsibilities

The half-yearly financial report is the responsibility of, and has been approved by, the directors. The directors are responsible for preparing the half-yearly financial report in accordance with the AIM Rules for Companies which require that the financial information must be presented and prepared in a form consistent with that which will be adopted in the company's annual financial statements.

As disclosed in note 1, the annual financial statements of the group are prepared in accordance with IFRSs as adopted by the European Union. The condensed set of financial statements included in this half-yearly financial report has been prepared in accordance with the basis of preparation set out in note 1.

 

Our responsibility

Our responsibility is to express to the company a conclusion on the condensed set of financial statements in the half-yearly financial report based on our review. This report, including the conclusion, has been prepared for and only for the company for the purpose of the AIM Rules for Companies and for no other purpose. We do not, in producing this report, accept or assume responsibility for any other purpose or to any other person to whom this report is shown or into whose hands it may come save where expressly agreed by our prior consent in writing.

 

Scope of review

We conducted our review in accordance with International Standard on Review Engagements (UK and Ireland) 2410, 'Review of Interim Financial Information Performed by the Independent Auditor of the Entity' issued by the Auditing Practices Board for use in the United Kingdom. A review of interim financial information consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing (UK and Ireland) and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

 

Conclusion

Based on our review, nothing has come to our attention that causes us to believe that the condensed set of financial statements in the half-yearly financial report for the six months ended 31 December 2010 is not prepared, in all material respects, in accordance with the basis of preparation set out in note 1 and the AIM Rules for Companies.

 

PricewaterhouseCoopers LLP

Chartered Accountants

Gatwick

29 March 2011

Notes:

(a) The maintenance and integrity of the Ceres Power Holdings plc website is the responsibility of the directors; the work carried out by the auditors does not involve consideration of these matters and, accordingly, the auditors accept no responsibility for any changes that may have occurred to the financial statements since they were initially presented on the website.

(b) Legislation in the United Kingdom governing the preparation and dissemination of financial statements may differ from legislation in other jurisdictions.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IR PGUAAWUPGGMB
Date   Source Headline
30th Apr 20247:00 amRNSTotal Voting Rights
22nd Apr 20247:00 amRNSNotice of AGM & Publication of Annual Report
17th Apr 20244:33 pmRNSNotification of major holdings
15th Apr 20247:00 amRNSFinal results for the year ended 31 December 2023
9th Apr 20247:00 amRNSUpdated timing of Full Year Results
28th Mar 20247:00 amRNSTotal Voting Rights
14th Mar 20247:00 amRNSUpdated timing of Full Year Results
29th Feb 20247:00 amRNSTotal Voting Rights
26th Feb 20247:00 amRNSNotice of Results
2nd Feb 202410:02 amRNSNotifications of transactions by PDMRs
31st Jan 20247:00 amRNSTotal Voting Rights
30th Jan 20249:56 amRNSNotifications of transactions by PDMRs
25th Jan 20244:33 pmRNSHolding(s) in Company
24th Jan 20247:00 amRNSTrading update
18th Jan 20247:05 amRNSInvestor Presentation
18th Jan 20247:00 amRNSCeres signs first hydrogen licence with Delta
22nd Dec 20237:00 amRNSBlock Listing Application and Total Voting Rights
30th Nov 20236:00 pmRNSTrading update
30th Nov 20237:00 amRNSTotal Voting Rights
31st Oct 20237:00 amRNSTotal Voting Rights
5th Oct 20237:00 amRNSPublication of Sustainability Report
4th Oct 20233:23 pmRNSNotifications of transactions by PDMRs
29th Sep 20237:00 amRNSTotal Voting Rights
28th Sep 20237:00 amRNSAppointment of Non-Executive Director
28th Sep 20237:00 amRNSInterim results
4th Sep 20237:00 amRNSNotice of Results
31st Aug 20237:00 amRNSTotal Voting Rights
11th Aug 20237:00 amRNSDirector/PDMR Shareholding
31st Jul 20238:50 amRNSTotal Voting Rights
25th Jul 20237:00 amRNSTrading Update
13th Jul 20234:11 pmRNSNotification under Listing Rule 9.6.14(2)
13th Jul 20239:14 amRNSNotifications of transactions by PDMRs
10th Jul 20239:43 amRNSNotifications of transactions by PDMR
29th Jun 20238:00 amRNSReadmission - Ceres Power Holdings Plc
29th Jun 20237:00 amRNSAdmission to Main Market premium segment
26th Jun 20235:45 pmRNSCeres Power Holdings
26th Jun 202312:56 pmRNSPublication of Prospectus
23rd Jun 20239:00 amRNSHolding(s) in Company
21st Jun 20233:48 pmRNSBlock Listing Return and Total Voting Rights
20th Jun 20232:45 pmRNSBlock Listing Application
1st Jun 20237:00 amRNSProposed admission to Main Market premium segment
31st May 20237:00 amRNSTotal Voting Rights
24th May 20237:00 amRNSNotice of Technology Teach-in
18th May 20231:35 pmRNSResult of Annual General Meeting
18th May 20231:35 pmRNSAppointment of Senior Independent Director
12th May 20232:10 pmRNSWithdrawal of AGM Resolution 17 and Resolution 18
5th May 202310:30 amRNSGrant of Long Term Incentive Plan Awards
5th May 20237:00 amRNSNotifications of transactions by PMDR's
3rd May 20237:00 amRNSAppointment of Non-Executive Directors
2nd May 202312:47 pmRNSGrant of Share Options under the Sharesave Scheme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.