Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCostain Regulatory News (COST)

Share Price Information for Costain (COST)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 75.40
Bid: 75.40
Ask: 75.80
Change: -0.20 (-0.26%)
Spread: 0.40 (0.531%)
Open: 75.60
High: 75.80
Low: 75.00
Prev. Close: 75.60
COST Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

A2/M2 connected corridor trial

17 Oct 2018 07:00

RNS Number : 2628E
Costain Group PLC
17 October 2018
 

17 October 2018

 

Costain Group PLC

("Costain" or "the Group" or "the Company")

 

COSTAIN ENABLES MAJOR MILESTONE

FOR CONNECTED AND AUTONOMOUS VEHICLES IN THE UK

Costain, the smart infrastructure solutions company, provided the technology to power pioneering work led by Highways England to transform journeys with innovative technology allowing vehicles and the roads to 'talk' to each other which was showcased to an international audience last week.

A high-tech 'corridor' is being created on the A2/M2 in Kent to let specially-equipped test vehicles interact with roadside infrastructure in a move which promises safer, more reliable journeys and speedier maintenance, to reduce delays.

Highways England, the Department for Transport, Kent County Council and Transport for London staged a week-long event that attracted more than 60 people from the automobile world to allow them to understand the technology and see how it could be used in the construction of future vehicle designs.

Costain created the new and leading-edge intelligent system to allow a digital conversation to take place between the roadside infrastructure and the car and vice versa. During the tests information was communicated to the vehicle relating to road works, road conditions, temporary speed limits and the time remaining before a traffic light turns to green.

Simon Ellison, Group technology capability director, said, 

"This is an important step in making our roads safer and improving journey time reliability by embracing cutting edge technology. The technology advances achieved in such a short space of time truly demonstrate the power of collaboration."

Costain has brought together industry leading technology partners from across Europe and delivered an integrated end-to-end hybrid system and this has been exhaustively tested by a wide range of organisations at the test event.

ENDS

Enquiries:

 

Costain

Tel: 01628 842 444

Andrew Wyllie CBE, Chief Executive

Tony Bickerstaff, Chief Financial Officer

Carolyn Rich, Investor Relations Director

Sara Lipscombe, Group Communications Director

Instinctif Partners

Tel: 020 7457 2020

Mark Garraway

James Gray

 

Notes to editors:

The project on sections of the A2 and M2 is testing how information about road conditions, road works and time left for traffic lights to change to green can be transmitted to test vehicles via a wireless network.

Providing drivers and fleet managers with the information and tools to make real-time decisions has the potential to quickly improve traffic flow along the corridor. It also has the potential to improve safety by providing more information about traffic conditions ahead.

Displaying the information on screens inside vehicles reduces the likelihood of drivers missing information displayed on roadside signs, ending the problem of obscured signs caused by vegetation or when passing other vehicles.

For example, a sign may appear for a lane closure in place because of an accident or debris ahead. Keeping the lane clear gives the emergency services the access they need to help. Providing this information in a vehicle will help reduce drivers accidently driving in a closed lane, improving safety for everyone.

The A2/M2 Connected Corridor is a joint project between the Department for Transport, Highways England, Transport for London and Kent County Council. It is part of InterCor, an EU project that aims to test services that work across borders, connecting the UK to the Netherlands, France and Belgium. The project started in 2016 and is due to be completed in 2019.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
NRAGGGBAUUPRGQQ
Date   Source Headline
9th Apr 20244:16 pmRNSDirector/PDMR Shareholding
9th Apr 20241:32 pmRNSDirector/PDMR Shareholding
9th Apr 20249:33 amRNSAnnual Report and Accounts and Notice of 2024 AGM
4th Apr 20249:55 amRNSAdditional Listing
15th Mar 20248:30 amRNSKey Partner for Landmark Carbon Capture Project
12th Mar 20247:01 amRNSDirectorate Change
12th Mar 20247:00 amRNS2023 Full Year Results
27th Feb 202412:06 pmRNSInvestor Presentation via Investor Meet Company
10th Jan 20247:00 amRNSAMP8 Water Framework Win with NWG & Trading Update
2nd Jan 202412:56 pmRNSBlock listing Interim Review
1st Nov 202312:15 pmRNSTotal Voting Rights
27th Oct 20231:00 pmRNSDirector/PDMR Shareholding
25th Oct 20231:00 pmRNSAdditional Listing
19th Oct 20231:00 pmRNSDirector/PDMR Shareholding
17th Oct 20237:00 amRNSDirectorate Change
28th Sep 202312:00 pmRNSScrip Dividend Reference Price
25th Sep 20237:00 amRNSCostain and Ofwat Water Seminar
8th Sep 20232:26 pmRNSBlock listing Interim Review
5th Sep 20237:00 amRNSDividend Declaration
23rd Aug 20237:00 amRNSResults for the six months ended 30 June 2023
16th Aug 202310:00 amRNSInterim Results Investor Q&A
26th Jul 20237:00 amRNSCostain Refinancing of Bank and Bonding Facilities
17th Jul 20237:00 amRNSCostain Announces Key Contract Extension
30th Jun 20237:00 amRNSNew Payment Plan with Pension Scheme Trustee
22nd Jun 202310:38 amRNSCostain Appointed Magnox Decommissioning Framework
8th Jun 20234:17 pmRNSUpdate Regarding A66 Project
11th May 20234:49 pmRNSResult of AGM
11th May 20237:00 amRNSAGM Statement
20th Apr 20239:40 amRNSExternal Appointment
6th Apr 20232:29 pmRNSGrant of Share Plan Awards
6th Apr 202311:51 amRNSHolding(s) in Company
4th Apr 202310:33 amRNSNotice of AGM and Annual Report and Accounts
30th Mar 202312:58 pmRNSLong Term Incentive Plan - Listing Application
14th Mar 20237:00 amRNSResults For The Year Ended 31 December 2022
30th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20231:09 pmRNSBlock Listing Six Monthly Return
21st Dec 202212:47 pmRNSDirector/PDMR Shareholding
29th Nov 20227:00 amRNSCostain Partners with Heathrow Airport
21st Nov 20227:00 amRNSExtension of Bank Debt and Bonding Facilities
1st Nov 20224:42 pmRNSDirector/PDMR Shareholding
30th Sep 20222:32 pmRNSA303 Delivery Assurance Partnership
27th Sep 20227:00 amRNSDirectorate Change
24th Aug 20227:00 amRNSStrong operational resilience and cash performance
20th Jul 20227:00 amRNSTrading in line with strong cash performance
1st Jul 20224:40 pmRNSSecond Price Monitoring Extn
1st Jul 20224:35 pmRNSPrice Monitoring Extension
1st Jul 20229:00 amRNSBlock listing Interim Review
16th Jun 20222:17 pmRNSTR-1: Notification of Major holdings
1st Jun 202211:10 amRNSTotal Voting Rights
5th May 20224:47 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.