REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCondor Gold Regulatory News (CNR)

Share Price Information for Condor Gold (CNR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 35.50
Bid: 35.00
Ask: 36.00
Change: 1.25 (3.65%)
Spread: 1.00 (2.857%)
Open: 34.50
High: 36.50
Low: 34.50
Prev. Close: 34.25
CNR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Plant Design Contract Awarded

8 May 2014 07:00

RNS Number : 4666G
Condor Gold PLC
08 May 2014
 

 

 

 

 

Condor Gold plc

7th Floor

39 St. James's Street 

London

SW1A 1JD

Telephone +44 020 74081067

Fax: +44 020 74938633

 

8th May 2014

 

 

Condor Gold plc

(''Condor'' or "the Company")

 

 

Award of Contract of Plant Design for Pre-Feasibility Study

 

 

Condor Gold (AIM:CNR), is pleased to announce that it has awarded a contract to Lycopodium Minerals Canada Ltd ("Lycopodium") to provide a Pre-Feasibility Study (PFS) level process engineering design for a processing plant, a capital cost estimate for the project and to prepare components of a PFS report to NI 43-101 standards. This report will support and be used as input for an overall PFS report for La India Project, Nicaragua currently under development by SRK Consulting (UK) Ltd ("SRK"). Two ore production scenarios are to be considered and developed in the course of the PFS investigations: a base case of 2,300 tonnes per day, processing 800,000 tonnes per annum and an alternative case of 2,800 tonnes per day ("tpd"), processing 1M tonnes per annum ("tpa").

 

Highlights of Contract for Plant Design to PFS level

· 2,300tpd plant for La India open pit only

· 2,800tpd plant for La India open pit plus 2 feeder pits.

· Lycopodium is positioned for BFS and could build a plant and infrastructure

· Improve detail of key capital expenditure items

· Improve detail of key operating cost items

 

Significance of Awarding a Contract for Plant Design to PFS level

Sizing the plant is a significant milestone as it takes into account many of the on-going studies for the PFS: the Metallurgy for gold recoveries, Hydrogeology for dewatering the open pit, Geotechnical for the pit angles, the Mineral Resource Estimate for the block models, the Mine Design for developing the mining dilution model, annual production schedule and Life of Mine plan. A Base Case of 2,300tpd is envisaged if production is from La India Open Pit only, which hosts a resource of 920,000 oz gold at 3.0g/t. The alternative case of 2,800tpd is envisaged if the two feeder pits of America and Central Breccia, which contain a combined resource of 220,000 oz gold at circa 4.0g/t, are included.

 

Mark Child, Chairman and CEO commented:

"The award of an engineering design contract for a 2,300tpd and 2,800tpd plant for production solely from open pits marks a major step forward in Condor's development and the progress of a Pre-Feasibility Study on La India Project. Lycopodium is a world leader in the design, engineering and construction of gold mines. Their extensive and recent experience with similar types of processing plants together with a substantial library on infrastructure assets associated with gold mines and detailed knowledge of operating mines will assist Condor with a more accurate assessment of the capital expenditure and operating costs at La India Project."

 

About Lycopodium

Lycopodium has internationally-recognised mineral processing plant designs and implementation expertise, specialising in the gold sector www.lycopodium.com.au Should the Board of Condor decide, Lycopodium has the ability to take La India Project to Bankable Feasibility Study and build a gold mineral processing facility and accompanying infrastructure. Lycopodium has delivered 50+ projects and 300+ feasibility studies globally in the gold sector. Endeavour Mining's Agbaou Project of 4,400tpd was delivered on time and under budget within 18 months. Lycopodium is currently providing detailed engineering services for First Quantum's Cobre Project in Panama. The physical facilities at La India Project that are the subject of the PFS studies to be completed by Lycopodium include the Processing Plant and Plant Site Infrastructure. Lycopodium's extensive library of designs for plant site infrastructure should allow more accurate quotes from Nicaraguan and Central American based firms for some of the main capital expenditure components of the PFS.

 

Background to PFS

A positive Preliminary Economic Assessment ("PEA") for La India Project was prepared by SRK (See RNS 5th March 2013). Total production of 1,463,000 oz gold over 13 year Life of Mine at an average operating cost of US$575 per oz gold. Production being split 50:50 between open pit and underground mining. However, the gold price at the time of the PEA was over US$1,600 per oz gold and a US$1,400 gold price was used in the technical economic model of the PEA.

 

In response to a 37% correction in the gold price during 2012 and 2013 from its high of over US$1,900 per oz gold, Condor's strategy changed to focus on determining whether La India Project could support an open pit only mine for several years, with underground development funded at a later date out of cash flow. A 23,600m drilling programme was completed in the 12 months to September 2013, targeting open pit resources and completed in-fill drilling on the existing La India open pit resource, converting Inferred Resources to the higher level of confidence of Indicated Resources.

 

A PFS-level metallurgical test program (designed and supervised by SRK) was undertaken by Condor in 2013. The results showed high gold recoveries 90% to 92% after a 2% reduction to allow for plant deficiencies. SRK recommended that gold mineralised ore can be processed by industry-standard whole-ore cyanidation with a standard carbon-in-pulp (CIP) process flowsheet.

(See RNS dated 21st October 2013).

 

La India Project contains a total mineral resource of 18.4Mt at 3.9g/t for 2.33M oz gold, including an Indicated mineral resource of 9.6Mt at 3.5g/t for 1.08M oz gold, Inferred mineral resource of 8.8Mt at 4.4g/t for 1.25M oz gold. Total open pit mineral resources are 1.14M oz gold at 3.1g/t. A detailed NI 43-101 mineral resource estimate announced in November 2013 and released in January 2014 by SRK. (See RNS 7th January 2014).

 

 

 

 

 

Competent Person's Declaration

The information in this announcement that relates to the mineral potential, geology, Exploration Results and database is based on information compiled by and reviewed by Dr Luc English, the Country Exploration Manager, who is a Chartered Geologist and Fellow of the Geological Society of London, and a geologist with eighteen years of experience in the exploration and definition of precious and base metal mineral resources. Luc English is a full-time employee of Condor Gold plc and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration, and to the type of activity which he is undertaking to qualify as a Competent Person as defined in the June 2009 Edition of the AIM Note for Mining and Oil & Gas Companies. Luc English consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

 

Information in this announcement that relates to the project evaluation, Preliminary Feasibility Study, engineering and mine planning is based on information compiled and/or reviewed by Gerald David Crawford, the Chief Operating Officer, who is a Registered Professional Engineer in the states of Colorado and Nevada and member of the Society of Mining, Metallurgy and Exploration, and a mining engineer with 37 years of experience in the design and evaluation of precious and base metal mineral resources. Mr. Crawford is a full-time employee of Condor Gold plc and has sufficient experience which is relevant to the mining method and type of deposit under consideration, and to the type of activity which he is undertaking to qualify as a Qualified Person as defined under Canadian NI 43-101. Mr. Crawford consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

 

 

 

 - Ends -

 

 

 

For further information please visit www.condorgold.com or contact:

 

Condor Gold plc

Mark Child, Executive Chairman and CEO

+44 (0) 20 7408 1067

 

Luc English, Country Manager Nicaragua

+505 8854 0753

 

Beaumont Cornish Limited

 

Numis Securities Limited

 Roland Cornish

+44 (0) 20 7628 3396

 

John Prior and James Black+44 (0) 20 72601000

 

Farm Street Media

Simon Robinson

+44 (0) 7593 340107

 

 

About Condor Gold plc:

 

Condor Gold plc is an AIM listed exploration company focused on developing gold and silver resource projects in Central America. The Company was admitted to AIM on 31st May 2006 with the stated strategy to prove up CIM/JORC Resources in Nicaragua and El Salvador. Condor has eight 100% owned concessions in La India Mining District ("La India Project"); three 100% owned concessions in three other project areas and 20% in the Cerro Quiroz concession in Nicaragua. In El Salvador, Condor has 90% ownership of four licences in two project areas.

 

Condor's La India Projectin Nicaragua currently contains a total attributable mineral resource of 18.4Mt at 3.9g/t for 2.33M oz gold and 2.68M oz silver at 6.2g/t to the CIM Code. Total gold equivalent of 2.37M oz. Including: Indicated mineral resource of 9.6Mt at 3.5g/t for 1.08M oz gold, Inferred mineral resource of 8.8Mt at 4.4g/t for 1.25M oz gold. Total open pit mineral resources of 1.14M oz gold at 3.1g/t. In El Salvador, Condor has an attributable 1,004,000 oz gold equivalent at 2.6g/t JORC compliant resource. The resource calculations are compiled by independent geologists SRK Consulting (UK) Limited for Nicaragua and Ravensgate and Geosure for El Salvador

Disclaimer

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

Technical Glossary

 

Carbon in Pulp (CIP)

A common processing method for extracting gold and silver, whereby activated carbon is added to the ground ore in a cyanide solution. Gold and silver are adsorbed onto to the carbon for subsequent recovery and refining.

CIM Code

The reporting standard adopted for the reporting of the Mineral resources is that defined by the terms and definitions given in the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral resources and Mineral Reserves (December 2005) as required by NI 43-101. The CIM Code is an internationally recognised reporting code as defined by the Combined Reserves International Reporting Standards Committee

Feeder Pit

Smaller deposits that are physically separate from a main deposit that can be mined independently from the main area. These deposits typically simplify operational planning.

Gold Equivalent

Gold equivalent grade is calculated by dividing the silver assay result by 60, adding it to the gold value and assuming 100% metallurgical recovery

Grade

The proportion of a mineral within a rock or other material. For gold mineralisation this is usually reported as grams of gold per tonne of rock (g/t)

g/t

grams per tonne

Inferred Mineral Resource

That part of a mineral resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited, or of uncertain quality and reliability

Indicated Mineral Resource

That part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed

Intercept

Refers to a sample or sequence of samples taken across the entire width or an ore body or mineralized zone. The intercept is described by the entire thickness and the average grade of mineralisation.

JORC

Australian Joint Ore Reserves Committee, common reference to the Australasian Code for reporting of identified mineral resources and ore reserves

koz

Thousand troy ounces

kt

Thousand tonnes

Mining Dilution

Rock that is, by necessity, removed along with the ore in the mining process, subsequently lowering the grade of the ore.

Mineral Resource

A concentration or occurrence of material of economic interest in or on the Earth's crust in such a form, quality, and quantity that there are reasonable and realistic prospects for eventual economic extraction. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are known, estimated from specific geological knowledge, or interpreted from a well constrained and portrayed geological model

Open pit mining

A method of extracting minerals from the earth by excavating downwards from the surface such that the ore is extracted in the open air (as opposed to underground mining).

oz

Troy ounce, equivalent to 31.103477 grams

Trench

The excavation of a horizontally elongate pit (trench), typically up to 2m deep and up to 1.5m wide in order to access fresh or weathered bedrock and take channel samples across a mineralised structure. The trench is normally orientated such that samples taken along the longest wall are perpendicular to the mineralised structure.

Mt

Million tonnes

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
CNTLLFVIELIDIIS
Date   Source Headline
2nd Jan 202411:09 amRNSTotal Voting Rights
12th Dec 20237:00 amRNSIncrease Fund Raise: £1,851,999 Issue of Equity
5th Dec 20237:00 amRNSCondor Gold Provides Update on the Sale of Assets
16th Oct 20239:57 amRNSExercise of Options
12th Sep 20233:12 pmRNSRetirement of Non Executive Director
7th Sep 20237:00 amRNSInterim Report & Accounts - 6 Months to 30 June 23
21st Jul 20237:00 amRNSUpdate on the Sale of Assets
7th Jul 20235:44 pmRNSGrant of Options - Correction
7th Jul 20233:54 pmRNSCondor Gold Grant of Options 2023
4th Jul 20235:17 pmRNS£1M Raise, Exercise Warrants Dir/PDMR Shareholding
10th May 20236:16 pmRNSResult of AGM
10th May 202310:55 amRNSConfirmation of time for Condor AGM
31st Mar 20231:54 pmRNSDirector/PDMR Shareholding
28th Mar 20237:00 amRNSAnnual Financial Report
14th Mar 20234:35 pmRNSPrice Monitoring Extension
13th Mar 20234:35 pmRNSPrice Monitoring Extension
13th Mar 20237:40 amRNSCondor Gold Provides an Update on Sale of Assets
13th Mar 20237:31 amRNSCondor Gold Provides an Update on Sale of Assets
13th Mar 20237:00 amRNSCondor Gold Provides an Update on Sale of Assets
22nd Dec 202210:05 amRNSAppointment of Denham Eke as a Non-Exec Director
21st Dec 20222:44 pmRNSFundraise of £3.3m, Results of Open Offer, Placing
5th Dec 20227:00 amRNSProposed Open Offer to Raise up to £3.9M
30th Nov 20228:01 amEQSCondor Gold entertaining potential buyers for La India gold project
28th Nov 20227:00 amRNSFundraise via Convertible Loan Note & Open Offer
22nd Nov 20227:00 amRNSStrategy Update, Advisor Appt to Sell the Assets
14th Nov 20227:00 amRNSUnaudited results for the 3rd Quarter
9th Nov 20224:40 pmRNSSecond Price Monitoring Extn
9th Nov 20224:35 pmRNSPrice Monitoring Extension
27th Oct 20225:49 pmRNSCondor Gold Comment on US Sanctions
26th Oct 20227:00 amRNSCNR Files Feasibility Study Tech Report on SEDAR
13th Oct 20224:41 pmRNSSecond Price Monitoring Extn
13th Oct 20224:36 pmRNSPrice Monitoring Extension
12th Oct 20227:00 amRNSJim Mellon assumes Chairmanship of Condor Gold
13th Sep 20224:35 pmRNSGrant of Options
12th Sep 20227:00 amRNSCondor Feasibility Study For La India Open Pit
17th Aug 20227:00 amRNSMineral Resource Update for La India Project
16th Aug 20227:00 amRNSUnaudited Interim Results
4th Aug 20227:00 amRNSMetallurgical Test Results for La India Open Pit
29th Jul 20223:40 pmRNSTotal Voting Rights
18th Jul 20227:00 amRNSExercise of Warrants, Director’s Dealing and TVR
6th Jul 20223:53 pmRNSTotal Voting Rights and Holdings in Company
14th Jun 20222:05 pmRNSSecond Price Monitoring Extn
14th Jun 20222:00 pmRNSPrice Monitoring Extension
14th Jun 20227:00 amRNSCondor Gold Raises £3.25m Via Private Placement
23rd May 20227:00 amRNSLa India Open Pit Drill Results
13th May 20227:00 amRNSResults for the three months ended 31 March 2022
12th May 20224:58 pmRNSResults of Annual General Meeting
29th Mar 20227:00 amRNSResults For The Year Ended 31 December 2021
10th Mar 20227:00 amRNSAll Assay Results Received for La Mestiza Open Pit
13th Jan 20224:55 pmRNSExercise of Options and Issue of Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.