Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Pad 4 Testing Update, Trinidad

16 Jul 2015 10:17

RNS Number : 2422T
LGO Energy PLC
16 July 2015
 

For Immediate Release, 7am

16 July 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Pad 4 Testing Update, Trinidad

 

LGO today announces an update on its testing operations at Drilling Pad 4 in the Goudron Field in Trinidad. A total of 506 feet of C-sand pay was perforated across the three wells and all three wells have produced oil to surface. Wells GY-672, 673 and 674 were tested in reverse order. The tests on GY-672 are continuing whilst the preliminary results of tests on GY-673 are being used to determine how best to balance production and reservoir management. The tests on GY-674 have been completed, and production will commence once surface facilities are in place.

 

The production testing carried out on well GY-674 has provided the anticipated engineering information. The well delivered a natural flow rate of approximately 240 barrels oil per day ("bopd") when flowed with a 8/32-inch choke. An absolute open-hole flow rate of approximately 500 bopd has been estimated from the test results.

 

Once the GY-673 data analysis has been completed, we expect that production from that well will be optimized by means of downhole pumping. Initial results from the tests at GY-672 suggest that a downhole pump may also be the most appropriate production approach on that well.

 

Well testing is an integral part of longer term development planning providing vital data on factors such as flow capacity, reservoir deliverability, permeability and completion efficiency. The data obtained will also be valuable in planning for the expected enhanced oil recovery project.

 

Neil Ritson, LGO's Chief Executive, commented:

"This is the first time that such extensive testing has been undertaken on C-sand wells in the Goudron Field and the process has yielded a great deal of very valuable information for the future development of the field."

 

In other news the Company today announces that the currently drilling C-sand well, GY-676, is drilling ahead in the 8 ½" section of the well at a depth of 2775ft. Formations that have been encountered in the well so far have come in on prognosis.

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 203 794 9230

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

 

Glossary:

API

American Petroleum Institute

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPKADDCBKKNOD
Date   Source Headline
22nd Jun 20202:17 pmRNSForm 8 (OPD) - Bahamas Petroleum Company PLC
22nd Jun 20202:02 pmRNSForm 8 (OPD) Columbus Energy Resources PLC
22nd Jun 202010:24 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
19th Jun 202010:41 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
19th Jun 202010:35 amRNSInterview on merger with Bahamas Petroleum
18th Jun 202010:15 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
17th Jun 20203:03 pmRNSForm 8.3 - [Columbus Energy Resources plc]
17th Jun 20209:33 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
17th Jun 20207:00 amRNSIssuance of Lind and Contractor Shares
16th Jun 20202:47 pmRNSForm 8.3 - [Columbus Energy Resources plc]
16th Jun 20209:52 amGNWForm 8.5 - Columbus Energy Resources Plc
15th Jun 202010:33 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
15th Jun 202010:08 amRNSInterview and Investor Presentation
12th Jun 20204:39 pmGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
12th Jun 20203:13 pmRNSForm 8.3 - [Columbus Energy Resources plc]
11th Jun 202011:58 amRNSRe 2.7 Recommended all-share merger
11th Jun 202011:49 amRNSRecommended all share merger - 2.7
3rd Jun 20202:05 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:00 pmRNSPrice Monitoring Extension
1st Jun 20207:00 amRNSOperational Update - Phase 2 CO2 Trinity Inniss
29th May 20203:11 pmRNSTotal Voting Rights
28th May 20207:00 amRNSSaffron 2 - drilling application to Ministry
18th May 20201:21 pmRNSHolding(s) in Company
13th May 20207:00 amRNSUpdate and Total Voting Rights
11th May 20204:42 pmRNSSecond Price Monitoring Extn
11th May 20204:36 pmRNSPrice Monitoring Extension
7th May 202011:06 amRNSSecond Price Monitoring Extn
7th May 202011:00 amRNSPrice Monitoring Extension
5th May 202011:06 amRNSSecond Price Monitoring Extn
5th May 202011:00 amRNSPrice Monitoring Extension
5th May 20209:06 amRNSSecond Price Monitoring Extn
5th May 20209:00 amRNSPrice Monitoring Extension
4th May 202011:05 amRNSSecond Price Monitoring Extn
4th May 202011:00 amRNSPrice Monitoring Extension
4th May 20207:00 amRNSTotal Voting Rights
27th Apr 20204:40 pmRNSSecond Price Monitoring Extn
27th Apr 20204:36 pmRNSPrice Monitoring Extension
27th Apr 20207:00 amRNSSaffron Discoveries - Lower Cruse and Middle Cruse
15th Apr 20207:00 amRNSCorporate Update and response to COVID-19
14th Apr 20205:01 pmRNSHolding(s) in Company
6th Apr 20207:00 amRNSOperations Update - Goudron Renewal
31st Mar 20201:00 pmRNSUpdate on Inniss-Trinity CO2 Project
31st Mar 202011:06 amRNSSecond Price Monitoring Extn
31st Mar 202011:00 amRNSPrice Monitoring Extension
31st Mar 20207:00 amRNSOperations update - Goudron renewal
17th Mar 20207:00 amRNSCorporate Update
3rd Mar 20209:19 amRNSTotal Voting Rights
20th Feb 20207:00 amRNSDirector/PDMR Shareholding
20th Feb 20207:00 amRNSDirector/PDMR Shareholding
17th Feb 202011:18 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.