Goudron Drilling Update

29 Oct 2014 09:46

RNS Number : 5769V
Leni Gas & Oil PLC
29 October 2014
 



For Immediate Release

29 October 2014

 

 

Leni Gas & Oil PLC

("LGO" or the "Company")

 

Goudron Drilling Update

 

LGO is today pleased to announce that well GY-670, the seventh of its planned 30 new development wells at the Goudron Field in Trinidad, and the second well from the third drill pad, was spudded yesterday and is drilling ahead in the Goudron Sandstones at a depth of approximately 220 feet.

 

Well GY-670 is planned to test the Goudron and Gros Morne Sandstone reservoirs to a total depth ("TD") of at least 3,100 feet TVDss (equivalent to 3,305 feet measured depth ("MD")) and will be deviated approximately 600 feet northwest from the surface location.

 

The sixth new Goudron well, GY-669, reached a TD of 3,505 feet MD and has been electric logged. The well was drilled to a depth slightly less than prognosed since it was considered that all sand-prone intervals had been penetrated at that location. The final section of the well, which was drilled in 8 ½-inch hole, has now been successfully cased to TD and the well is ready for completion as a production well.

 

A total of over 400 feet of net hydrocarbon pay have been identified in GY-669. Analysis of the electric logs is not yet complete however the presence of higher than previously identified reservoir pressure near the base of the well suggests a different fault block has been penetrated than in earlier wells. Age dating of the intervals penetrated by the well is also ongoing in order to ensure the correct identification of the boundary between the Gros Morne and underlying Lower Cruse reservoirs, and the attribution of the identified pay intervals to the appropriate formations.

 

The completion of GY-669 will be undertaken when Well Services Rig 20 is moved from the drill pad; which is currently anticipated to occur in late 2014.

 

Neil Ritson, LGO's Chief Executive, commented:

"Well seven is now underway and we are analyzing the results of well number six, GY-669, which is another successful well with considerable net pay. Reservoir pressures of up to 2,580 psi were measured near TD; the highest we have yet seen, and this may have major benefits for future production from this part of the field."

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

Leni Gas & Oil plc

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

Mark Antelme

 +44 (0) 20 7861 3232

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reached

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

1

GY-664

28 April

4212

13 May

192

300

79

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

9 August

3026

27 August

191

254

np

6

GY-669

5 October

3505

24 October

227

na

na

7

GY-670

28 October

All depths are quoted as measured depth in feet below Kelly bushing

na = not yet available

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

psi: pounds per square inch

TD: Total Depth

TVDss: True Vertical Depth sub sea

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUKSKRSOARURA
Date   Source Headline
8th Apr 200912:09 pmRNSStatement Re-Gulf of Mexico
30th Mar 20097:00 amRNSEastern Hungary - Pen?szlek Development Expansion
20th Mar 200910:57 amRNSFour new Blocks in Gulf of Mexico
19th Mar 200911:54 amRNSHungary - Maiden Development Resources Report
19th Mar 200911:29 amRNSGulf of Mexico - MMS Lease Sale 208
10th Mar 20091:43 pmRNSCO2 sequestration development agreement
5th Mar 20092:59 pmRNSMonthly Production Update - February
25th Feb 20099:09 amRNSIncrease in Gulf of Mexico Oil & Gas Production
5th Feb 20097:00 amRNSHolding(s) in Company
4th Feb 200911:39 amRNSSignificant Shareholding
3rd Feb 20097:00 amRNSMonthly Production Update - January
29th Jan 20095:58 pmRNSHolding(s) in Company
21st Jan 200912:00 pmRNSHungary Production Update and New Developments
12th Jan 200911:00 amRNSMexico Production Update
9th Jan 20094:49 pmRNSRe Options
9th Jan 20097:00 amRNSMonthly Production Update - December
6th Jan 200910:19 amRNSCompletion & Production of Eugene Island
17th Dec 20087:00 amRNSSpain - Increased Production and Development Plans
12th Dec 20087:00 amRNSSpain - Increased Recoverable Reserves
11th Dec 20087:00 amRNSMonthly Production Update - November
1st Dec 200811:39 amRNSDrilling Update
12th Nov 20087:00 amRNSMonthly Production Update - October
10th Nov 20087:00 amRNSStatement re CO2 sequestration
31st Oct 200810:52 amRNSTotal Voting Rights
23rd Oct 20081:07 pmRNSHungary 3D Seismic Commencement replacement
23rd Oct 200812:23 pmRNSHungary 3D Seismic Commencement
23rd Oct 20087:00 amRNSMalta 2009 Work Program Approved
22nd Oct 20087:00 amRNSUnaudited Second Interim Results
21st Oct 20087:00 amRNSIncreased Oil Resources Identified In Spain
16th Oct 20082:05 pmRNSIssue of Equity
10th Oct 20087:00 amRNSAppointment of Broker
9th Oct 200812:32 pmRNSOperations Update - Gulf of Mexico
8th Oct 20087:00 amRNSMonthly Production Update
6th Oct 200812:00 pmRNSOperations Update - Gulf of Mexico
6th Oct 20087:00 amRNSOperations Update
30th Sep 20082:12 pmRNSTotal Voting Rights
25th Sep 20084:00 pmRNSUpdate on previously announced issue of equity
8th Sep 20087:00 amRNSMonthly Production Update
29th Aug 20083:41 pmRNSAccounting Reference Date
26th Aug 20084:17 pmRNSGulf of Mexico Operations Upd
19th Aug 200812:25 pmRNSHungary Gas Production Update
14th Aug 200810:10 amRNSSignificant Shareholding
12th Aug 200812:03 pmRNSIncrease in stake in Gulf of
12th Aug 200810:15 amRNSGas production commences in H
8th Aug 20083:25 pmRNSProduction Update
31st Jul 20084:00 pmRNSTotal Voting Rights
29th Jul 20084:52 pmRNSGulf of Mexico Update
29th Jul 20081:59 pmRNSPlacement
21st Jul 20082:16 pmRNSUpdate on Investment
21st Jul 200811:32 amRNSUpdate on Investment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.