Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on operations at BNG

15 Jul 2015 07:00

RNS Number : 0592T
Roxi Petroleum Plc
15 July 2015
 

 Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Update on operations at BNG

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to further update the market with news of progress at its flagship BNG asset.

 

Deep Wells

 

Deep Well A5

 

The well was spudded in July 2013 and drilled to a total depth of 4,442 meters with casing set to a depth of 4,077 meters to allow open hole testing. Core sampling revealed the existence of a gross oil-bearing interval of at least 105 meters from 4,332 meters to at least 4,437 meters.

 

As announced on 30 June 2015, the equipment required for the open hole 30-day test was on site and the test was set to start following the completion of the required preparatory work. Part of the preparatory work involves checking and testing then new pipes. The pipes received did not pass the on-site inspection and replacement pipes have been ordered from a different supplier.

 

To utilise the drilling crew while replacement pipes are sourced work was undertaken to remove the pipe stuck at the bottom of the well. This process was unsuccessful and a decision to side-track the well from a depth of 4,000 meters has been taken.

 

This work is expected to take 1 month to complete. Following the completion of the sidetrack casing will be set to the full depth of the well, which will allow a conventional a 90-day well test to commence at the end of Q3 2015.

 

Deep Well 801

 

Deep Well 801 was spudded on 15 December 2014 with a planned Total Depth of 4,950 meters. The well is located approximately 8 kilometers from Deep Well A5 and was planned to target the same structure as Deep Well A5 in the Middle and Lower Carboniferous. The well is being drilled by Sinopec, the Chinese multinational, at a fixed cost of $11 million.

 

As previously reported core samples and logging have revealed a potentially oil bearing interval starting from 4,536 meters and extending 100 meters. The pressure and temperatures encountered indicate this well is unlikely to be connected to the reservoir targeted by Deep Well A5. Therefore should Deep Well 801 prove commercially viable it would be a separate discovery to the potential discovery previously announced in connection with Deep Well A5.

 

On 30 June 2015, it was announced that casing had been set to a level of 4,790 meters and drilling had resumed to a new planned total depth of 5,100 meters targeting Lower Permian and Middle & Lower Carboniferous oil bearing reservoirs.

 

The well has now been successfully drilled to a total depth of 5,050 meters, into Lower Carboniferous. The lower part of the well will now be cased, and the well logs for the final 260 meters drilled are being examined to detect any additional oil-bearing intervals.

 

Further announcement of what we find in this interval will be made in due course.

 

Comment:

 

 

Clive Carver, Chairman said

 

While we would have much preferred to know the results from a 30-day well test before sidetracking Deep Well A5 the failure of the pipes supplied provided an opportunity to deal once and for all with the stuck pipe at the bottom of the well. Once the sidetracking has been completed we plan to start a 90-day test.

 

 

Enquiries:

 

Roxi Petroleum PLC Clive Carver, Chairman

+7 727 375 0202

 

WH Ireland Ltd James Joyce / James Bavister

+44 (0) 207 220 1666

 

 

Qualified Person

 

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDZLFFEDFLBBF
Date   Source Headline
26th Jun 20203:25 pmRNSNotice of AGM
25th Jun 20207:00 amRNSAnnual Report and Financial Statements
14th May 202010:50 amRNSAmended: BNG April 2020 production numbers
14th May 202010:10 amRNSBNG April 2020 Production Numbers
4th May 20207:00 amRNSOperational and Financial Update
27th Apr 20207:00 amRNSBNG Operational Update
6th Apr 20207:00 amRNSBNG Operational Update & March Production Numbers
30th Mar 20207:00 amRNSBNG Operational Update & Increase in Production
18th Mar 20208:34 amRNSOperational Update
11th Mar 202010:08 amRNSFebruary 2020 Production & Operational Summary
9th Mar 20202:05 pmRNSSecond Price Monitoring Extn
9th Mar 20202:01 pmRNSPrice Monitoring Extension
9th Mar 20209:06 amRNSSecond Price Monitoring Extn
9th Mar 20209:00 amRNSPrice Monitoring Extension
13th Feb 202012:56 pmRNSResult of General Meeting
10th Feb 20209:05 amRNSSecond Price Monitoring Extn
10th Feb 20209:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSBNG Update and January 2020 Production
21st Jan 202010:25 amRNSAcquisition of the Caspian Explorer
8th Jan 202012:02 pmRNSBNG Update and December Production
2nd Jan 20202:00 pmRNSPrice Monitoring Extension
2nd Jan 202011:05 amRNSSecond Price Monitoring Extn
2nd Jan 202011:00 amRNSPrice Monitoring Extension
2nd Jan 20209:05 amRNSSecond Price Monitoring Extn
2nd Jan 20209:00 amRNSPrice Monitoring Extension
2nd Jan 20207:00 amRNSBNG Success at Deep Well A5
10th Dec 20197:00 amRNSBNG Operational Update & Production Numbers
27th Nov 20191:00 pmRNSOperational Update
19th Nov 20194:35 pmRNSPrice Monitoring Extension
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
6th Nov 20199:04 amRNSOperational Update and BNG production numbers
7th Oct 20197:00 amRNSBNG Monthly Production Numbers
30th Sep 20199:03 amRNSBNG Operational Update
17th Sep 20197:00 amRNSInterim Results
12th Sep 201910:35 amRNSAmendment: BNG Operational Update
12th Sep 20197:41 amRNSBNG Operational Update and Production Numbers
2nd Sep 20197:21 amRNSPurchase of equipment and the issue of shares
21st Aug 20198:39 amRNSBNG Operational Update and Production Numbers
6th Aug 20197:00 amRNSMonthly production numbers
26th Jul 20197:00 amRNSInvestor and Analyst Conference Call
12th Jul 20197:00 amRNSBNG Operational Update
11th Jul 20198:58 amRNSMJF Licence Upgrade Signed
21st Jun 20194:50 pmRNSResult of AGM
21st Jun 20197:00 amRNSMJF Licence Update
19th Jun 20197:00 amRNSBNG Operational Update
7th Jun 20197:00 amRNSBNG Operational Update
5th Jun 201912:08 pmRNSAward of long-term incentives
4th Jun 20197:00 amRNSOperational Update & Production Report
29th May 201910:00 amRNSBNG operational update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.