focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCALL.L Regulatory News (CALL)

  • There is currently no data for CALL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2G Qualification of Honeywell

13 Jan 2010 07:00

RNS Number : 4341F
Zenergy Power PLC
13 January 2010
 



Zenergy Power plc

('Zenergy Power' or the 'Group')

2G Qualification of Honeywell

Zenergy Power (AIM:ZEN.L), the superconductor energy technology company, is pleased to announce that Honeywell Speciality Materials ('Honeywell') has now been qualified by the Group to supply on industrial scales the required specialist chemicals needed in the mass-production of Second Generation ('2G') superconductor wire. The qualification of Honeywell is a significant step in Zenergy Power's efforts to dramatically reduce the cost of superconductor wire through the adoption of patented 'all-chemical' continuous production processes. Further to this, the qualification also confirms that the Group is able scale its 'all-chemical' processes using a secured supply of identified chemicals without compromising either the consistency or quality of the eventual 2G wire. The 'all-chemical' process is a reel-to-reemanufacturing technique developed by Zenergy Power that involves the continuous deposition of superconductor material from chemical solutions onto metal tapes.

As previously announced, Zenergy Power and Honeywell entered into a five-year Joint Development Agreement ('JDA') in September 2008 with the specific aim of establishing for Zenergy Power the secure supply of industrial-scale quantities of chemical precursors. Today's qualification of Honeywell is a huge achievement for the technical teams of both companies and provides the basis from which the working relationship between the two can be deepened as the scaling-up of Zenergy Power's 2G production techniques continues to progress.

It is the intention of Zenergy Power to use low-cost 2G wire in the mass production of its industrial scale superconductor products to increase margins and scalability. Of particular importance is the application of 2G wire in the future production of superconductor electricity generators that are set to dramatically reduce the cost of producing electricity from offshore wind and run-of-river hydropower projects. 

The Board also notes with great satisfaction the continued resource commitment from Honeywell without which such rapid progression could not have been made. Honeywell's continued commitment further validates the Group's 'all-chemical' approach and the commercial opportunity that exists for the mass adoption of superconductor generators by the renewable energy industry. 

-Ends-

Further information

Andrew Tan

Zenergy Power

+ 44 207 602 7420

David Bick

Square1 Consulting Ltd

+ 44 207 929 5599

Andrew Godber

Panmure Gordon & Co

+ 44 207 459 5742

Kam Bansil/Rory Scott

Mirabaud Securities Limited

+ 44 207 866 0244

About Zenergy Power

Zenergy Power is a superconductor energy technology company, quoted on the AIM market of the London Stock Exchange and comprising three operating subsidiaries located in GermanyUSA and Australia. The Group's commercial focus is the innovation and manufacture of clean energy superconductor solutions that are capable of delivering huge efficiency and cost improvements to the generation, distribution and consumption of electrical energy.

Today, the Group's groundbreaking superconductive solutions are already delivering energy savings to industrial users of electrical energy and providing cutting-edge protection from electrical power surges to the United States electricity grid. Looking to the near future, the Group is currently developing a range of highly energy efficient superconductor components for a new class of electricity generator capable of delivering significant cost savings to the renewable energy industry. These cost savings will enable renewable energy to more effectively compete with traditional thermal power generation; leading to a greater reduction in carbon emissions and a more sustainable economic future.

In 2007, Zenergy Power became the first company in the world to complete a commercial sale of an industrial scale superconductor application and has subsequently developed products capable of addressing several multi-billion dollar global markets. Following this in the first quarter of 2009, the Group proudly became the first company to install and operate a superconductor smart grid device, capable of significantly reducing the damaging effects of large-scale power surges, into the United States electricity grid. In line with this leading industry position, Zenergy Power is also manufacturing core components for what is due to be the world's first superconductor electricity generator which is due for installation into E.ON AG's commercial hydro power station in early 2010.

About superconductivity

Superconductive materials are capable of conducting electricity without any resistance and were first discovered in 1911 in what was to prove to be one of the most significant scientific breakthroughs of the 20th Century.

Superconductors enable: 

Energy intensive industrial applications capable of reducing energy consumption by 50% 

The protection of national power grids from blackouts

The production of revolutionary light-weight, efficient 10MW class renewable wind generators capable of reducing the cost of offshore wind power by 25%

The production of a new class of compact and efficient hydro generators capable of significantly increasing electrical power output from existing and new hydro dam structures.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLGDBSBBBGGD
Date   Source Headline
27th Jan 20227:00 amRNSDE-LISTING AND CANCELLATION OF TRADING OF SHARES
26th Jan 20227:35 amRNSSCHEME BECOMES EFFECTIVE
26th Jan 20227:30 amRNSSuspension - Cloudcall Group plc
24th Jan 20223:40 pmRNSISSUE OF EQUITY AND RULE 2.9 ANNOUNCEMENT
24th Jan 20222:03 pmRNSForm 8.3 - CloudCall Group plc
24th Jan 20221:00 pmRNSCOURT SANCTION OF SCHEME OF ARRANGEMENT
24th Jan 20229:33 amRNSForm 8.5 (EPT/RI)
21st Jan 20223:42 pmRNSHolding(s) in Company
21st Jan 20223:11 pmRNSForm 8.3 - CLOUDCALL GROUP PLC
21st Jan 202211:23 amRNSForm 8.5 (EPT/RI)
21st Jan 20228:21 amRNSForm 8.3 - Cloudcall Group PLC
20th Jan 202210:06 amRNSForm 8.5 (EPT/RI)
19th Jan 20225:30 pmRNSCloudcall Group
17th Jan 20222:45 pmRNSHolding(s) in Company
17th Jan 20222:21 pmRNSRESULTS OF COURT MEETING AND GENERAL MEETING
12th Jan 202212:00 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
11th Jan 20223:09 pmRNSForm 8.3 - CLOUDCALL GROUP PLC
11th Jan 20229:35 amRNSForm 8.3 - CLOUDCALL GROUP PLC
10th Jan 20227:00 amRNSTrading Update for the year ended 31 December 2021
30th Dec 20213:12 pmRNSForm 8.3 - CLOUDCALL Group
30th Dec 202112:00 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
30th Dec 202111:15 amRNSForm 8.3 - Cloudcall Group plc
30th Dec 20218:51 amRNSForm 8.3 - [CLOUDCALL GROUP PLC]
29th Dec 20217:00 amRNSHolding(s) in Company
29th Dec 20217:00 amRNSForm 8.3 - CloudCall Group PLC
23rd Dec 20213:07 pmRNSForm 8.3 - CLOUDCALL GROUP PLC
23rd Dec 20212:22 pmRNSForm 8.3 - CloudCall Group plc
23rd Dec 20217:00 amRNSForm 8.3 - Cloudcall Group Plc
22nd Dec 20213:21 pmBUSForm 8.3 - Cloudcall Group Plc
22nd Dec 20213:09 pmRNSForm 8.3 - CLOUDCALL GROUP PLC
21st Dec 20216:30 pmRNSForm 8.3 - Cloudcall Group PLC
21st Dec 20213:05 pmRNSForm 8.3 - CloudCall Group plc
21st Dec 20218:00 amRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
20th Dec 20213:04 pmRNSForm 8.3 - CloudCall Group plc
20th Dec 202112:00 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
20th Dec 202110:30 amRNSHolding(s) in Company
17th Dec 20212:32 pmRNSForm 8.3 - CloudCall Group plc
17th Dec 202112:00 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
17th Dec 20219:36 amRNSForm 8.3 - [CLOUDCALL GROUP PLC]
17th Dec 20217:00 amRNSForm 8 (OPD) (Xplorer Capital)
16th Dec 20213:15 pmRNSForm 8.3 - CloudCall Group plc
16th Dec 202110:10 amRNSForm 8.5 (EPT/RI)
16th Dec 20219:29 amRNSForm 8.3 - [CLOUDCALL GROUP PLC]
15th Dec 20214:45 pmRNSPublication and posting of the Scheme Document
15th Dec 20213:39 pmRNSForm 8.3 - CloudCall Group plc
15th Dec 20211:26 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group - Replacement
15th Dec 202112:00 pmRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc
15th Dec 20219:47 amRNSForm 8.5 (EPT/RI)
15th Dec 20218:26 amRNSForm 8.3 - CLOUDCALL GROUP PLC
14th Dec 20219:59 amRNSForm 8.5 (EPT/RI) - Cloudcall Group Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.