Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCALL.L Regulatory News (CALL)

  • There is currently no data for CALL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2G DEVELOPMENT MILESTONE

14 Apr 2010 07:00

RNS Number : 1359K
Zenergy Power PLC
14 April 2010
 



 

 

Zenergy Power plc

('Zenergy Power' or the 'Group')

 

2G Development Milestone

 

Ink Jet Processing and Continuous Wire Processing

 

Zenergy Power (AIM:ZEN.L), the superconductor energy technology company, is pleased to announce that it has successfully completed the development of the high-speed ink jet printing processes necessary for the low-cost production of its Second Generation ('2G') superconducting wire. Combined with the recent qualification of Honeywell Speciality Materials as an industrial supplier to the Group, this achievement brings Zenergy Power to the end of the research and development of its 2G wire processes and enables it to commence industrial scaling of production once the qualification of industrial supply of metal tapes from ThyssenKrupp VDM GmbH ('ThyssenKrupp') has been completed. The Group's work with ThyssenKrupp was recently boosted by support of the German government through a funded project and it is anticipated that qualification will occur in the second half of this year.

 

The successful development of the Group's high-speed ink jet printing processes for 2G wire production was achieved with the support of the European Union through a funded project named EFECTS involving the cooperation of the University of Cambridge, the University of Ghent and ICMAB Barcelona. Following the completion of this project Zenergy Power is able to capture significant cost savings in the production of 2G wire through three key advances:

 

·; First, the speed with which active chemical layers can be applied to metal substrates is significantly increased, reducing processing times and increasing output;

·; Secondly, the application of chemical layers becomes far more consistent, improving overall wire quality, reducing scrap rates and leading to substantially increased production yields and lowered costs; and

·; Thirdly, it becomes possible to apply consistent chemical layers onto wider metal tapes, leading to a significant increase in production volumes.

 

Zenergy Power is committed to reducing the cost of superconductor applications through the development of its own wire manufacturing processes which, unlike industry alternatives, allow continuous production from base chemicals and metal tapes in a roll-to-roll process. This process, when scaled, will enable the production of the industry's lowest-cost superconductor wire, which in turn will be cheaper than traditional copper wire and play a key role in promoting the adoption of superconductor-based generators by the renewable energy industry. Generators employing Zenergy Power's superconductor components are significantly smaller, lighter and more efficient than traditional 'copper-based' machines - reducing the overall cost of electricity produced from offshore wind turbines and run-of-river hydropower stations. The first of these generators built using the Group's superconductor components is due to be installed by E.ON AG later this year.

 

 

-Ends-

 

Further information

 

Andrew Tan

Zenergy Power plc

+ 49 2226 9060 668

David Bick

Square 1 Consulting Ltd

+ 44 207 929 5599

Andrew Godber/Adam Pollock

Panmure Gordon & Co

+ 44 207 459 3600

Kam Bansil/Rory Scott

Mirabaud Securities Limited

+ 44 207 866 0244

 

 

About Zenergy Power plc

 

Zenergy Power is a superconductor energy technology company, quoted on the AIM market of the London Stock Exchange and comprising three operating subsidiaries located in Germany, USA and Australia. The Group's commercial focus is the innovation and manufacture of clean energy superconductor solutions that are capable of delivering huge efficiency and cost improvements to the generation, distribution and consumption of electrical energy.

 

Today, the Group's groundbreaking superconductive solutions are already delivering energy savings to industrial users of electrical energy and providing cutting-edge protection from electrical power surges to the United States electricity grid. Looking to the near future, the Group is currently developing a range of highly energy efficient superconductor components for a new class of electricity generator capable of delivering significant cost savings to the renewable energy industry. These cost savings will enable renewable energy to more effectively compete with traditional thermal power generation; leading to a greater reduction in carbon emissions and a more sustainable economic future.

 

In 2007, Zenergy Power became the first company in the world to complete a commercial sale of an industrial scale superconductor application and has subsequently developed products capable of addressing several multi-billion dollar global markets. Following this in the first quarter of 2009, the Group's FCL device which reduces the damaging effects of large-scale power surges on electrical grids became the first such superconductor smart grid device to be installed and operated into the United States electricity grid. In line with this leading industry position, Zenergy Power is also manufacturing core components for what is due to be the world's first superconductor electricity generator which is due for installation into E.ON AG's commercial hydro dam in 2010. It is anticipated that the installation of the superconductor generator will increase the electricity output of this generator by 36%.

 

About superconductivity

 

Superconductive materials are capable of conducting electricity without any resistance and were first discovered in 1911 in what was to prove to be one of the most significant scientific breakthroughs of the 20th century.

 

Superconductors enable:

 

(a) Induction Heaters to be twice as efficient for the metals industry

(b) Fault Current Limiters to protect power grids from blackouts

(c) Direct-drive wind generators to be significantly reduced in size and weight allowing the operation of wind generators in excess of 8 MW

(d) Existing hydro-power sites to increase energy efficiency and electrical power output

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUORNRRNASAAR
Date   Source Headline
14th Oct 20207:00 amRNSTrading on the New York OTCQX® Best Market
7th Oct 20207:00 amRNSCorrection: Holding(s) in Company
6th Oct 20205:15 pmRNSHolding(s) in Company
6th Oct 20207:00 amRNSNotice of Capital Markets Day
5th Oct 20207:00 amRNSHolding(s) in Company
2nd Oct 20207:00 amRNSIntegration with Eclipse Software
23rd Sep 20207:00 amRNSInterim results for the six months to 30 June 2020
18th Sep 20208:00 amRNSHolding(s) in Company
11th Sep 20207:00 amRNSNotice of Results
10th Aug 202012:40 pmRNSBlock Listing Review
29th Jul 20207:00 amRNSIntegration with recruitment CRM TrackerRMS
22nd Jul 20207:00 amRNSInterim Trading Update
16th Jul 20207:00 amRNSCloudCall announces partnership with Informunity
13th Jul 20207:00 amRNSCloudCall announces new integration for Zoho
7th Jul 20207:00 amRNSPost Close Update and Investor Presentation
30th Jun 20206:00 pmRNSTotal Voting Rights
3rd Jun 20204:45 pmRNSDirector/PDMR Shareholding
1st Jun 20201:40 pmRNSResult of AGM
1st Jun 20207:00 amRNSAGM trading update and investor meeting
27th May 20201:30 pmRNSAnnual General Meeting and Covid-19 Trading Update
30th Apr 20205:50 pmRNSPosting of Annual Report and Notice of AGM
8th Apr 202012:15 pmRNSInvestor Communications
8th Apr 20207:00 amRNSFinal Results for the Year Ended 31 December 2019
24th Mar 20207:00 amRNSFY 19 results publication date and trading update
12th Mar 20207:00 amRNSAppointment of Chief Technology Officer
4th Mar 20207:00 amRNSCloudCall Launches in Australia
3rd Mar 20207:00 amRNSAppointment of Chief Revenue Officer
2nd Mar 20207:00 amRNSTotal Voting Rights
25th Feb 20204:35 pmRNSHolding(s) in Company
25th Feb 20208:15 amRNSHolding(s) in Company
24th Feb 20207:00 amRNSContract Win with Vaco
17th Feb 20207:00 amRNSCloudCall and Vincere partnership
12th Feb 20206:20 pmRNSBlock Listing Return
16th Jan 20207:00 amRNSTrading update for the year ended 31 December 2019
4th Dec 20197:00 amRNSCloudCall and TargetRecruit partnership
22nd Nov 20197:00 amRNSDirectorate Change
19th Nov 20193:10 pmRNSHolding(s) in Company
11th Nov 20197:00 amRNSCloudCall and Mercury xRM partnership
5th Nov 20195:45 pmRNSHolding(s) in Company
28th Oct 20195:15 pmRNSHolding(s) in Company
28th Oct 20197:00 amRNSHolding(s) in Company
24th Oct 20195:19 pmRNSHolding(s) in Company
21st Oct 20191:45 pmRNSResult of General Meeting and Open Offer
10th Oct 20197:00 amRNSHolding(s) in Company
4th Oct 20192:00 pmRNSHolding(s) in Company
2nd Oct 201912:00 pmRNSPosting of Circular and Notice of General Meeting
1st Oct 20194:00 pmRNSHolding(s) in Company
30th Sep 20195:30 pmRNSOpen Offer Information
30th Sep 20197:01 amRNSConditional Placing and Open Offer
30th Sep 20197:00 amRNSInterim Results Announcement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.