The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.02
Bid: 0.017
Ask: 0.023
Change: 0.00 (0.00%)
Spread: 0.006 (35.294%)
Open: 0.02
High: 0.02
Low: 0.02
Prev. Close: 0.02
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kanye Project: Metallurgical Test Work Results

24 Jul 2023 14:49

RNS Number : 0017H
Bezant Resources PLC
24 July 2023
 

 

 

24 July 2023

Bezant Resources Plc

("Bezant" or the "Company") 

Results from Phase 1 Metallurgical Test Work on Kanye Manganese Sample

 

Bezant (AIM: BZT) is pleased to provide information on encouraging results of Phase 1 metallurgical testing carried out by Wardell Armstrong International ('WAI') on a sample from its' 100% owned Kanye manganese exploration project in Botswana. The primary objective of the work was to investigate the amenability of extracting manganese from the Kanye mineralisation by sulphuric acid leaching.

 

Highlights:

 

· Sulphuric acid leaching successfully demonstrates an amenability to extract manganese from the Kanye sample into solution, with recoveries of up to 99.4% Mn achieved at a temperature of 60oC.

 

· Sulphur dioxide addition was found to have a direct correlation to the overall manganese recovery.

 

· Most tests demonstrated fast leach kinetics with relative manganese recoveries after 1 hour of leaching ranging up to 90.7%.

 

· Whole rock analysis showed relatively simple mineralogy, the main manganese mineral in the Kanye sample being pyrolusite, which is the chief ore mineral for mine production worldwide.

 

· Based on the encouraging initial results, Bezant has engaged WAI to carry out Phase 2 testwork to optimise the leaching parameters for economic processing of a manganese ore, whilst tracking other elements relevant to the economics of battery-grade manganese production.

 

 

Colin Bird, Executive Chairman of Bezant, commented:

"The first phase of metallurgical testing is highly encouraging in that we have demonstrated our ability to recover a high level of manganese. The next phase will move towards commercial optimisation of the leaching parameters, with specific emphasis on limiting sulphuric acid consumption. We are aiming for battery grade manganese production which is much sought after and we look forward to moving towards resource definition and a preliminary economic assessment."

 

 

 

Kanye Phase 1 Metallurgical Test Work

 

Wardell Armstrong International (WAI) was commissioned by Bezant to undertake a programme of metallurgical testing on a sample from the Kanye manganese deposit, Botswana. The primary objective of the testwork was to investigate the amenability of effectively extracting manganese from the mineralisation by sulphuric acid leaching. A secondary objective was to undertake a small programme of sample characterisation including chemical, XRF and XRD analysis.

 

X-Ray Fluorescence analysis on the whole rock samples was conducted to determine the weight percentage of major rock-forming elements. The results showed that the sample primarily consisted of silicon dioxide and manganese oxide constituents, with minor phases of iron oxide and aluminium oxide.

 

X-Ray Diffraction analysis on the whole rock sample was conducted to determine the weight percentage of individual mineral phases. The results showed that the sample primarily consisted of quartz, with lesser pyrolusite, goethite and talc.

 

WAI determined the Kanye composite to have a manganese head grade of 15.48% Mn obtained using an aqua regia digestion with an ICP-OES finish.

 

Six leach tests were conducted on the sample under varying conditions such as grind size, sulphur dioxide addition, and pH at a temperature of 60oC. A benchmark review of similar projects found sulphur dioxide to be an important parameter in the reduction of manganese to become more amenable to sulphuric acid leaching.

 

Table 1 - Whole Ore Acid Leach Test Results for Kanye Mn Sample

Test ID

Grind Size (D80)

SO2 Addition

pH

Mn recovery

H2SO4 Consumption

µm

kg/t

%

kg/t

ALT1

200

0.34

1.0

1.9

114

ALT2

150

0.34

1.0

1.5

27

ALT3

200

500

1.0

99.4

477

ALT4

200

50

1.0

27.3

35

ALT5

200

250

1.0

82.6

246

ALT6

200

250

1.5

79.2

217

 

 

The relationship observed demonstrates that sulphur dioxide (SO2) addition has a strong correlation to the overall manganese recovery (Table 1). Overall manganese recovery ranges from 1.9% to 99.4% for 0.34kg/t to 500kg/t of sulphur dioxide addition for ALT1 and ALT3 respectively.

 

In ALT6, pH was increased from 1.0 to 1.5 to reduce the overall acid consumption over the course of the leach to obtain more economic conditions for processing. Sulphuric acid consumption was reduced from 246kg/t to 217kg/t resulting in a decrease of overall manganese recovery from 82.6% to 79.2% for ALT5 and ALT6 respectively.

 

Except for ALT1 and ALT2, where the resolution of the leach kinetics could be distorted as a result of poor recoveries, all tests demonstrate fast leach kinetics with relative manganese recoveries after 1 hour of leaching ranging from 84.9% to 90.7% for ALT6 and ALT3 respectively.

 

Sample Characterisation

 

· WAI determined the Kanye composite to have a manganese head grade of 15.48% Mn obtained using an aqua regia digestion with an ICP-OES finish;

· X-Ray Fluorescence analysis found the major elemental oxide present in the sample is silicon dioxide, with lesser amounts of manganese, iron, and aluminium oxides at 63.83%, 17.94%, 6.02%, and 2.61% respectively.

· X-Ray Diffraction analysis found the major mineral phases present were quartz and pyrolusite at 71.4% and 10.4% respectively. This is comparable to the metal composition from XRF analysis.

 

Sulphuric Acid Leach Testwork

 

· Sulphuric acid leaching demonstrated an amenability to extract manganese from the sample into solution. Manganese recoveries of 99.4% could be achieved at a pH of 1.0 and sulphur dioxide addition of 500kg/t;

· Sulphur dioxide addition values were found to have a direct correlation to the overall manganese recovery;

· With the exception of ALT1 and ALT2, the leach kinetics of manganese recovery were shown to be fast, with relative leach rates after 1 hour ranging from 84.9% to 90.7% for ALT6 and ALT3 respectively;

· Acid consumption values ranged from 27kg/t to 477kg/t for ALT2 and ALT3 respectively;

· pH was shown to influence the overall manganese recovery with a decrease from 82.6% to 79.2% when pH was increased from 1.0 to 1.5 for ALT5 and ALT6 respectively.

 

Planned Phase 2 Test Work - WAI Recommendations

 

The primary objective is to continue from the previous phase of acid leach testwork to optimise the leaching parameters for economic processing of a manganese ore, whilst tracking a range of other elements relevant to the economics of battery-grade manganese production.

Specifically, WAI recommended the following:

 

· Undertake further optimisation leaching testwork to decrease the level of acid consumption over the course of the leach. This could include variables such as further grind size investigation at elevated recoveries, leach optimisation at elevated pH, increased temperature, and calcination pre-treatment;

· Track the recovery of other analytes that are likely to have an impact on the downstream purification process circuit of battery-grade manganese sulphate monohydrate production; and

· Consider maintaining a redox potential with the addition of sulphur dioxide throughout the leaching process at defined intervals, as opposed to a single, substantial addition at the beginning of the leach process.

 

 

For further information, please contact:

Bezant Resources Plc 

Colin Bird

Executive Chairman

 

+44 (0)20 3416 3695

 

 

Beaumont Cornish (Nominated Adviser) Roland Cornish / Asia Szusciak

 

+44 (0) 20 7628 3396

Novum Securities Limited (Joint Broker)

Jon Belliss

 

 

+44 (0) 20 7399 9400

 

Shard Capital Partners LLP (Joint Broker)

Damon Heath

+44 (0) 20 7186 9952

or visit http://www.bezantresources.com

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law pursuant to the Market Abuse (Amendment) (EU Exit) regulations (SI 2019/310).

 

Qualified Person:

Technical information in this announcement has been reviewed by Edward (Ed) Slowey, BSc, PGeo, technical director of Bezant Resources Plc. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved this announcement.

 

Glossary

 

The following is a summary of technical terms:

 

 

"mineralisation"

 

Process of formation and concentration of elements and their chemical compounds within a mass or body of rock

 

"Mn"

 

Manganese

 

"MnO"

 

Manganese oxide

 

"shale"

 

A fine-grained laminated sediment

 

"SO2"

 

Sulphur dioxide

 

"XRD"

 

X-ray diffraction

"XRF"

 

X-ray fluorescence

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCBXGDRLSDDGXS
Date   Source Headline
6th Jul 20157:00 amRNSChange of Broker
29th May 201510:00 amRNSHolding(s) in Company
27th May 20157:00 amRNSOperational Review & Strategic Update
30th Mar 20157:00 amRNSInterim Results
22nd Dec 20142:36 pmRNSDirector's Dealing
5th Dec 201412:30 pmRNSResult of AGM
28th Nov 20143:00 pmRNSDirector's Dealings
11th Nov 20147:00 amRNSFinal Results
5th Nov 20147:00 amRNSUpdate re Mankayan Project
24th Sep 20147:00 amRNSUpdate re Mankayan Project
2nd Sep 20147:00 amRNSBoard Changes
11th Aug 20149:30 amRNSPotential Changes to Philippines Mining Tax Laws
23rd Jun 201410:15 amRNSPreliminary Metallurgical Testwork Results, Eureka
7th May 20149:31 amRNSHolding(s) in Company
7th May 20149:30 amRNSHolding(s) in Company
26th Mar 20147:00 amRNSInterim Results
12th Feb 20149:00 amRNSUpdate re Mankayan Project
22nd Jan 20147:00 amRNSUpdate on Option over the Mankayan Project
6th Dec 201312:00 pmRNSResult of AGM
13th Nov 20137:00 amRNSFinal Results
16th Oct 20137:00 amRNSUpdate re Eureka Copper-Gold Project, Argentina
9th Oct 20139:30 amRNSHolding in Company
9th Oct 20139:30 amRNSHolding in Company
30th Sep 20133:30 pmRNSGerard Nealon
3rd Jun 20139:39 amRNSTermination of Mkurumu Joint Venture Project
30th May 20137:00 amRNSApproval for Environmental Impact Assessment
22nd May 201312:30 pmRNSResult of Court Hearing
7th May 201311:00 amRNSResult of General Meeting
19th Apr 20137:00 amRNSUpdate re Return of Capital and New GM
9th Apr 201312:16 pmRNSResult of General Meeting and Revised Timetable
27th Mar 20137:00 amRNSInterim Results
18th Mar 20137:00 amRNSNotice of General Meeting and Return of Capital
23rd Jan 20137:00 amRNSUpdate re Eureka Copper-Gold Project, Argentina
10th Jan 201311:30 amRNSResult of GM
10th Dec 20127:00 amRNSProposed Option Extension & Proposed Subscription
7th Dec 20122:25 pmRNSResult of AGM
29th Nov 201210:45 amRNSUpdate re Eureka Copper-Gold Project, Argentina
15th Nov 20127:00 amRNSFinal Results
19th Oct 20124:35 pmRNSPrice Monitoring Extension
15th Oct 20127:00 amRNSDirector Appointment
8th Oct 20127:00 amRNSUpdate re Eureka Project
10th Sep 201212:30 pmRNSHolding(s) in Company
3rd Sep 201211:58 amRNSHolding(s) in Company
3rd Sep 201211:58 amRNSHolding(s) in Company
18th Jun 201212:00 pmRNSDirector's Dealings
30th May 20124:40 pmRNSSecond Price Monitoring Extn
30th May 20124:35 pmRNSPrice Monitoring Extension
18th Apr 20127:00 amRNSUpdate re Eureka Project, Argentina
3rd Apr 20124:40 pmRNSSecond Price Monitoring Extn
3rd Apr 20124:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.