Interim Results

26 Sep 2017 07:00

RNS Number : 7624R
Bellzone Mining PLC
26 September 2017
 

26 September 2017

 

Bellzone Mining plc ("Bellzone" or "the Company")

Unaudited interim results for the six months ended 30 June 2017 

 

Bellzone Mining plc (AIM: BZM) announces its unaudited interim results for the six months ended 30 June 2017.

 

Key Highlights

 

· Bellzone's principal assets are the iron ore and nickel laterite JORC-compliant resources and reserves at Kalia in The Republic of Guinea, West Africa. Total iron ore resources are 6.16bt and nickel ore resources 79.3mt.

 

· Iron ore prices remain volatile in 2017 but are showing signs of settling into a medium-term average meaningfully above the theoretical 2013 BFS-assessed FOB Conakry all-in production cost of $34.39/t for 58% iron fines.

 

· Updating oil price assumptions in the 2013 BFS model results in a current expected all-in cost of $28.71/t for our Kalia KP1 project (7mtpa of 58% Fe fines over a life of mine of 10 years, capable of extension by further JORC Reserve drilling).

 

· Main iron ore price drivers include:

 

o Global supply and demand in iron ore have been moving closer to balance, with iron ore prices touching their highest levels for 2½ years;

 

o The drive to reduce Chinese airborne pollution has resulted in a demand squeeze for +62% "higher quality" iron ore, exacerbating the price premium of +62% ore over ores of lower grade. This is perceived to be the start of a long-term global change, the gradual result of which is expected to be much greater demand for the +65% pellets and sinter feed capable of being delivered by magnetite mines, as high grade oxide (DSO) mines are exhausted over time. Kalia holds 4.72bt of high quality magnetite as well as 913mt of oxide iron ore.

 

o The ability of the large Australian producers of iron ore to make easy productivity gains by de-bottlenecking existing mines has passed and new mines are now sought to maintain supply - for example Rio Tinto's new Silvergrass mine, opened in August 2017, is expected to produce 10mtpa;

 

o Of the two largest current iron ore mines in development or ramp-up globally, Hancock Prospecting's 55mtpa Roy Hill mine has recently been reported as reaching a production rate of 53.4mtpa, near capacity; and Vale's 90mtpa S11D Carajas extension is half-way through its ramp-up, scheduled to reach capacity in 2019 or 2020;

 

o Despite predictions of so-called "peak iron ore" or "peak steel" being reached, global seaborne demand for iron ore has continued to grow over the period 2009-2016 at a compound rate of 6.7% per annum (5.9% 2013-2016) and this growth shows little or no sign of abating. There are, to the knowledge of Bellzone, no new iron ore mines of the scale of Roy Hill or S11D scheduled for development in the foreseeable future and the absolute increase in seaborne traded iron ore tonnes in 2016 alone was 48mt.

 

· Markets for steel and steel alloy materials such as nickel have also strengthened, which has positive pricing effects on our potential ferronickel project. There is evidence this is not a short-term phenomenon:

 

o Chinese industrial modernisation in iron and steel production and, in particular, next stage environmental controls are being properly implemented in China's base metals supply chain;

 

o The stainless steel market is being propelled by wider usage in developing markets, particularly China, causing demand side strength in nickel. Nickel usage is also expanding rapidly in Nickel-Graphite (Lithium ion) batteries used in electric vehicles;

 

o Consistently negative approach of Filipino Government to open-pit mining of nickel ores and slow take-up of low grade nickel ore export licence usage in Indonesia have caused weakness in nickel supply. Indonesia and The Philippines are the world's largest producers of nickel ores.

 

· The results of the feasibility study work on the Kalia Ferronickel project undertaken to date, announced in August 2016, showed a conservative base case break-even nickel price of $10,617/t vs the current nickel price of $10,516/t (as at 25th September).

 

· In June 2017, Bellzone announced it had reached provisional agreement with the Guinean Government on the addendum to its 2010 Mining Convention for Kalia. A subsequent announcement was made on 14 September 2017 which stated that no formal signing date had yet been determined but the Company understands that there are no significant issues preventing signing. This remains the situation at this time.

 

· Following signature of the Addendum, it is expected that the feasibility study work on the Kalia Ferronickel Project will recommence after the worst of the annual rainy season in mid-Q4 2017 with the aim of completion by mid-2018, potential financing and construction in H2 2018 and thereby the potential for production to commence in 1H 2019.

 

· In parallel, Bellzone will continue to monitor developments in the iron ore market and will seek to update the 2013 BFS if market conditions remain positive, enabling the mine to be financed.

 

 

 

Financing activities

Bellzone announced a new US$4.0m loan facility with Hudson Global Group ("Hudson") in December 2016 to finance its operations through FY2017. Strict cost discipline (detailed below), resulted in a delayed initial draw down of US$0.8m in June 2017, and as Bellzone continues to run ahead of budgeted costs, no further draw downs have yet been necessary.

To remove any potential short-term financing overhang, Bellzone agreed first with CS International (S) Pte Limited in July 2017 and then with Hudson in August 2017 to extend loan maturity dates of all three outstanding loans to 31 December 2018.

 

Costs

The company's overall operating costs decreased by 36.2% compared to 1H2016. This was made possible with the full cooperation of our Guinea staff as the technical leave programme was extended for a further 6 months. Despite higher absolute interest costs resulting from the additional Hudson loan drawdown, the Company's loss for the period decreased by US$1.4mil compared with 1H2016.

We expect further cost savings in 2H2017 arising from ongoing structural staffing changes in Guinea as well as from the agreement of expatriate and non-Guinea staff to accept salary reductions, coupled with lower Director fees.

 

 

Enquiries:

 

Bellzone Mining plc

Simon Edwards +44 (0) 7767 492 712

WH Ireland Limited

Nominated Adviser and Broker

James Joyce / James Bavister +44 (0) 20 7220 1666 

http://www.bellzone.com

Condensed Consolidated Statement of Financial Position

At 30 June 2017

 

Unaudited

30 June

2017

Unaudited

30 June

2016

Audited

31 December 2016

Note

$'000

$'000

$'000

ASSETS

Non-current assets

Property, plant and equipment

1,324

2,214

1,627

Other intangible assets

91

160

126

Mineral properties in the exploration and evaluation phase

3

16,066

16,066

16,066

Total non-current assets

17,481

18,440

17,819

Current assets

Cash and cash equivalents

2,468

2,379

3,138

Trade and other receivables

62

81

58

Inventories

640

723

640

Total current assets

3,170

3,183

3,836

Total assets

20,651

21,623

21,655

EQUITY

Issued capital

4

333,349

333,349

333,349

Reserves

5

5,101

5,101

5,101

Retained losses

(342,785)

(336,242)

(340,285)

Total equity

(4,335)

2,208

(1,835)

LIABILITIES

Non-current liabilities

Secured loans

18,902

13,691

17,603

Total non-current liabilities

18,902

13,691

17,603

Current liabilities

Trade and other payables

5,973

5,532

5,825

Provisions

111

192

62

Total current liabilities

6,084

5,724

5,887

Total liabilities

24,985

19,415

23,490

Total equity and liabilities

20,651

21,623

21,655

 

The above consolidated statement of financial position should be read in conjunction with the accompanying notes.

Condensed Consolidated Statement of Comprehensive Income

For the six months ended 30 June 2017

 

Unaudited

6 months ended

30 June

2017

$'000

Unaudited

6 months ended

30 June

2016

$'000

Employee benefits expense

(1,070)

(1,759)

Depreciation and amortisation expenses

(337)

(582)

Administration expenses

(370)

(354)

Consulting expenses

(51)

(263)

Exploration expenses

(137)

(436)

Legal expenses

(22)

(96)

Occupancy expenses

(54)

(35)

Travel and accommodation expenses

(32)

(53)

Results from operating activities

(2,073)

(3,578)

Finance income

7

3

Finance expense

(434)

(341)

Loss before income tax from continuing operations

(2,500)

(3,916)

Income tax expense

-

-

Loss for the period from continuing operations

(2,500)

(3,916)

Total comprehensive loss for the period, net of tax:

Attributable to equity holders of the parent entity

(2,500)

(3,916)

Cents

Cents

Loss per share attributable to the ordinary equity holders of the parent entity:

Basic and diluted loss per share

(0.249)

(0.415)

 

The above consolidated statement of comprehensive income should be read in conjunction with the accompanying notes.

 

Condensed Consolidated Statement of Changes in Equity

For the six months ended 30 June 2017

 

Note

Stated capital

$'000

Reserves(Note 6)

$'000

Retained losses

$'000

Total

equity

$'000

Balance at 1 January 2017 (audited)

333,349

5,101

(340,285)

(1,835)

Loss for the period

-

-

(2,500)

(2,500)

Total comprehensive loss for the period

333,349

5,101

(342,785)

(4,335)

Balance at 30 June 2017 (unaudited)

333,349

5,101

(342,785)

(4,335)

Balance at 1 January 2016 (audited)

331,352

5,101

(332,326)

4,127

Loss for the year

-

-

(7,959)

(7,959)

Total comprehensive income/(loss) for the year

-

-

(7,959)

(7,959)

Shares issued, net of costs

1,997

-

-

1,997

Balance at 31 December 2016 (audited)

333,349

5,101

(340,285)

(1,835)

 

Balance at 1 January 2016 (audited)

331,352

5,101

(332,326)

4,127

Loss for the period

-

-

(3,916)

(3,916)

Total comprehensive loss for the period

-

-

(3,916)

(3,916)

Share-based payment transactions

5

1,997

-

-

1,997

Balance at 30 June 2016 (unaudited)

333,349

5,101

(336,242)

 2,208

 

The above consolidated statement of changes in equity should be read in conjunction with the accompanying notes.

 

Condensed Consolidated Cash Flow Statement

For the six months ended 30 June 2017

 

Note

Unaudited

6 months ended

30 June

2017

$'000

Unaudited

6 months ended

30 June

2016

$'000

Net cash outflow from operating activities

7

(1,475)

(3,216)

Cash flows from investing activities

Payments for property, plant and equipment

-

-

Receipts on behalf of jointly controlled entity

-

-

Net cash inflow from investing activities

-

-

Cash flows from financing activities

Proceeds from issue of shares

4(c)

-

1,997

Net proceeds from secured loans

800

3,000

Net cash inflow from financing activities

800

4,997

Net increase/(decrease) in cash and cash equivalents

(675)

1,781

Cash and cash equivalents at the beginning of the period

3,138

598

Exchange differences

5

-

Cash and cash equivalents at end of period

2,468

2,379

 

The above consolidated cash flow statement should be read in conjunction with the accompanying notes.

 

 

 

Notes to The Unaudited Interim Condensed Consolidated Financial Statements For the six months ended 30 June 2017

 

 

1. Reporting Entity

 

The condensed consolidated interim financial statements of Bellzone Mining plc ("the Company") for the six months ended 30 June 2016 were issued on 26 September 2017 in accordance with the authority of a resolution of the board.

 

Bellzone Mining plc is a public company listed on the AIM Market of the London Stock Exchange, and incorporated and registered in Jersey, Channel Islands. The Company's registered office is located at Standard Bank House, 47-49 La Motte Street, St Helier, Jersey, JE2 4SZ.

 

The condensed consolidated financial statements of the Company as at and for the six months period ended 30 June 2016 comprise the Company and its subsidiaries (together referred to as the "Group").

 

The nature of the principal activities of the Group is the exploration and development of resources, primarily at its flagship Kalia Iron Ore and Nickel Project in Guinea, West Africa. The principal accounting policies adopted in the preparation of these financial statements are set out below. These policies have been consistently applied unless otherwise stated.

 

 

2. Basis of preparation

 

a. Statement of compliance

The financial statements have been prepared in accordance with International Financial Reporting Standards ("IFRS") as adopted for use in the European Union.

 

b. Early adoption of standards

The Group has not early-adopted any other standard, interpretation or amendment that has been issued but is not yet effective.

 

c. Basis of measurement

The financial statements have been prepared on the historical cost basis except where indicated otherwise in the notes to the interim condensed consolidated financial statements.

 

d. Functional and presentation currency

The functional currency of the Company and all of its subsidiaries is the United States Dollar ("$"), which is the currency of the primary economic environment in which the entities operate. All amounts are expressed in $ and all values are rounded to the nearest thousand ($'000) unless otherwise stated.

 

e. Going concern

The nature of the Group's current activities does not provide the Group with production or trading revenues. In June 2017, the Group announced the conclusion of negotiations with the Guinea Government on an Addendum to its Kalia mining convention which would provide the necessary framework for the development of the proposed ferronickel project and the overall Kalia iron ore project.

 

Following the expected amendment to the Kalia mining convention, the Group will continue feasibility study work on its proposed ferronickel project within the Kalia licence area and has set aside sufficient funding to complete this study which is expected to be completed in the first half of 2018. However, our ability to complete this study is also dependent on our majority shareholder Hudson releasing the remaining funds from its US$4.0 million facility, which is at Hudson's discretion and could be impacted if agreement is not reached on the amendment to the Kalia convention.

 

Given difficult market conditions, Bellzone remains wholly reliant on its majority shareholder, Hudson. China Sonangol (a related company of Hudson) provided loan financing to the Company from August 2014 to the end of 2015, totalling a principal amount of US$10.2 million. Hudson provided a second loan in the principal amount of US$6.5 million to finance the Company through 2016, with the final drawdown on this loan received in March 2017. The Company has drawn these loans fully, amounting to US$16.7 million and the total principal and accrued interest for both loans was US$19.6 million as at 30 June 2017. A further loan of US$4.0 million was agreed with Hudson to enable the Company to continue operating through 2017 and the first draw down on this loan in the amount of US$800,000 was completed on 6 June 2017. It is at Hudson's discretion to allow further drawdowns under this facility. Due to successful cost management which has obviated the need to draw down on this third loan earlier, this most recent loan amount is expected to be sufficient to meet Bellzone's working capital needs up to June 2018, subject to assumptions necessarily made in respect of the group's cashflow forecast.

 

All three loan agreements have the same repayment date for principal and accrued interest of 31 December 2018. If no additional funds are raised before such time to allow Bellzone to discharge its loan obligations, Bellzone, China Sonangol and Hudson would need to reach agreement to defer repayment to avoid Bellzone defaulting.

 

A positive outcome on the ferronickel feasibility study is uncertain and in any event additional funding is likely to be required to advance the project to a bankable feasibility stage. Furthermore, to commence development, significant funding would be required from external parties which is not committed at the date of this interim statement.

 

The current cash reserves and shareholder loans would be sufficient to see the Group's activities through to the end of June 2018, however drawdowns on the shareholder loan facility are at the discretion of the shareholder. The Group will therefore require drawdowns to be made available and further financing beyond 30 June 2018 to enable it to continue to meet its liabilities as and when they fall due.

 

The Group continues to evaluate its strategy and its ability to secure funding that would enable it both to continue operations for the short term and in the long term to develop the Kalia licence area. However, at present there are no committed facilities which would enable Bellzone to continue as a going concern for a period of 12 months from the date of this interim report nor provide certainty that the ferronickel feasibility study can be completed. In the event of Hudson withdrawing support, the Directors' view is that additional funding may be sourced from one or more of the following:

 

• placement of further securities;

• the sale of assets; and/or

• funding in exchange for an interest in the Group's projects or future production from the projects.

 

Whilst the above funding sources are considered available to the Group, there are currently no advanced plans to execute any of these strategies.

 

Hudson has confirmed in a letter to the Directors dated 29 June 2017 that its current intention is to continue making funds available to support the Group's working capital requirements for a period of 12 months from the date of signing of the financial statements for the period ending 31 December 2016, on a basis that allows Hudson to change that intention. On this basis and given Hudson's past support, the Directors believe they have a reasonable expectation that Hudson will continue to provide on-going funding to Bellzone, as well as consider favourably postponing the repayment date for all of its existing loans.

 

Taking the above factors into account, the Directors believe it is reasonable to expect that the Group will obtain sufficient funding from one or more of the aforementioned funding sources and have continued to adopt the going concern basis of accounting in preparing the Consolidated Financial Statements. However, the Directors wish to highlight that there is a material uncertainty in relation to the continuing support from Hudson, in particular the availability of committed short-term funding, and reaching an agreement for the deferral of the repayment date for its loan facilities.

 

As the Directors have concluded that there is a material uncertainty that may cast significant doubt on the ability of Bellzone to continue as a going concern beyond a period of 12 months from the date of this report, there is a risk that the Group and Company may be unable to realise their assets and discharge their liabilities in the normal course of business. The financial statements do not include the adjustments that would result if the company was unable to continue as a going concern.

 

 

 

3. Mineral properties in the exploration and evaluation phase

 

Unaudited

30 June

2017

Unaudited

30 June

2016

$'000

$'000

Reconciliation of carrying amount

Opening net book amount

16,066

16,066

Closing net book amount

16,066

16,066

At Balance sheet date

Cost

16,066

16,066

Net book amount

16,066

16,066

 

The above asset values relate to the mineral properties in the exploration and evaluation phase and are based on the cost of acquiring 100% of the companies holding the Kalia and Faranah exploration permits.

 

The Agreement with China International Fund ("CIF") of 2 August 2010 required certain actions to be fulfilled for the transfer of 50% of the defined Kalia II area (part of the Kalia permit) and 100% of the Faranah permit to be transferred to CIF. The prerequisite actions have not occurred and the transfers have not taken place. The permitted areas remain 100% owned by Bellzone through the relevant subsidiaries. In addition to the costs of acquiring the exploration permits through the acquisition of the subsidiaries, the statutory fees paid on the issue of the Mining Concessions (Permits) for the Kalia and Faranah areas are included.

 

 

 

4. Issued capital

 

Unaudited

30 June 2017

Unaudited

30 June 2016

 

Shares

SHARES

$'000

SHARES

$'000

 

a.

Issued capital

 

Ordinary Shares of no par value

1,469,858,383

352,291

1,469,858,383

352,291

 

Share issue costs

(18,942)

(18,942)

 

1,469,858,383

333,349

1,469,858,383

333,349

 

b.

Movements in Ordinary Shares

Date

Details

Number of shares

Stated Capital

$'000

 

1 January 2017

Opening balance

1,469,858,383

352,291

 

30 June 2017 (unaudited)

1,469,858,383

352,291

 

 

 

 

 

The Company is a no par value company. No share issued by the Company shall have a par value.

 

There is no limit on the number of shares which may be issued by the Company, subject to shareholder approval, and if the share capital structure of the Company is at any time divided into separate classes of share there is no limit on the number of shares of any class which may be issued by the Company.

 

Subject to the provisions of the Companies (Jersey) Law 1991 (as amended) (the "Companies Law") and the Articles of the Company and without prejudice to any rights attached to any existing shares or class of shares, any share may be issued with such rights or restrictions as the Company may by ordinary resolution determine or, subject to and in default of such determination, as the Board shall determine.

 

The Company may, pursuant to the Companies Law, issue fractions of shares and any such fractional shares shall rank pari passu in all respects with other shares of the same class issued by the Company.

 

 

The Company shall maintain a stated capital account in accordance with the Companies Law for each class of issued share. A stated capital account may be expressed in any currency determined by the Board from time to time.

 

Ordinary shares have no par value, carry one vote per share and carry the right to dividends.

 

The Group is in a project development stage and did not declare or pay any dividends during the period (2016: nil).

 

c.

Reconciliation of net cash inflow from financing activities

Unaudited

30 June

2017

Unaudited

30 June

2016

$'000

$'000

Increase in ordinary share capital

-

2,015

Share issue costs

-

(18)

Proceeds from issue of shares

-

1,997

 

 

d.

 

 

Capital risk management

The Group's objectives when managing capital are to safeguard its ability to continue as a going concern so that it may provide returns for shareholders and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital.

 

In order to maintain or adjust the capital structure, the Group may adjust the amount of dividends payable to shareholders, return capital to shareholders, issue new shares or sell assets to reduce debt.

 

  

5. RESERVES

 

Unaudited

30 June 2017

Unaudited

30 June 2016

$'000

$'000

a.

Reserves

5,101

5,101

 

Cumulative Translation Adjustment

Treasury shares

Share-based payment reserve

TOTAL

$'000

$'000

$'000

$'000

Balance at 1 January 2017 (audited)

63

(3,300)

8,338

5,101

Balance at 30 June 2017 (unaudited)

63

(3,300)

8,338

5,101

Balance at 1 January 2016 (audited)

63

(3,300)

8,338

5,101

Balance at 30 June 2016 (unaudited)

63

(3,300)

8,338

5,101

 

 

 

6. Events occurring after the reporting period

 

There were no significant events occurring after the balance sheet date and the date of this report.

 

 

 

7. Reconciliation of loss after income tax to net cash OUTflow from operating activities

 

Unaudited 6 months ended

30 June 2017

$'000

Unaudited 6 months ended

30 June 2016

$'000

Loss for the period after tax

(2,500)

(3,916)

Depreciation and amortisation expense

337

582

Non cash interest accrued on loan

499

-

Unrealised foreign exchange loss/(gain)

(4)

2

Change in working capital

193

116

Decrease/(increase) in receivables

(4)

52

Decrease in stock

-

(84)

(Decrease)/increase in payables

148

18

(Decrease)/increase in provisions

49

130

Net cash outflow from operating activities

(1,475)

(3,216)

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IR LLFVRASIEFID
Date   Source Headline
13th Dec 20185:42 pmRNSBellzone Mining
13th Dec 20182:58 pmRNSAppointment of Liquidators
3rd Dec 201811:01 amRNSFunding Update and Suspension of trading of shares
3rd Dec 201811:00 amRNSSuspension - Bellzone Mining Plc
15th Nov 20182:45 pmRNSFunding Update
31st Oct 20187:00 amRNSBoard Change
22nd Oct 20183:31 pmRNSCorporate Update
22nd Oct 201810:45 amRNSGeneral Meeting Result
3rd Oct 201811:05 amRNSSecond Price Monitoring Extn
3rd Oct 201811:00 amRNSPrice Monitoring Extension
2nd Oct 20184:01 pmRNSNotice of General Meeting and Investor Update Call
28th Sep 20183:09 pmRNSInterim Results
27th Sep 20184:45 pmRNSCorporate Update
3rd Sep 20188:21 amRNSKalia Mining Convention ratified National Assembly
13th Aug 20187:00 amRNSDirectorate Change
31st Jul 201812:34 pmRNSDirectorate Change and Result of AGM
27th Jul 20181:05 pmRNSTotal Voting Rights
23rd Jul 20181:38 pmRNSShare Awards and Director/PDMR Shareholding
18th Jul 20188:20 amRNSIssue of Equity - Replacement
13th Jul 20187:00 amRNSNotice of AGM and Investor Conference Call
12th Jul 20187:00 amRNSIssue of Equity
11th Jul 20184:41 pmRNSSecond Price Monitoring Extn
11th Jul 20184:35 pmRNSPrice Monitoring Extension
9th Jul 20189:59 amRNSKalia Mining Convention ratified by Parliament
11th Jun 20189:45 amRNSCorporate Update
25th May 20187:00 amRNSResults for the year ended 31 December 2017
8th May 20184:40 pmRNSSecond Price Monitoring Extn
8th May 20184:35 pmRNSPrice Monitoring Extension
2nd May 20181:27 pmRNSTotal Voting Rights
1st May 20187:00 amRNSFerronickel Feasibility Study ? Bulk Sample Update
23rd Apr 20183:43 pmRNSShare Awards and Director/PDMR Shareholding
23rd Mar 201810:45 amRNSAmendment to Loan Availability and Repayment Dates
26th Jan 201811:12 amRNSShare Awards
29th Nov 20177:00 amRNSResults of Placing
23rd Nov 20177:44 amRNSPlacing and appointment of joint broker
9th Nov 201710:08 amRNSMining Convention Update Signed
31st Oct 20174:41 pmRNSSecond Price Monitoring Extn
31st Oct 20174:35 pmRNSPrice Monitoring Extension
6th Oct 20174:35 pmRNSPrice Monitoring Extension
26th Sep 20177:00 amRNSInterim Results
14th Sep 201710:04 amRNSMining Convention Update
18th Aug 20177:19 amRNSAmendment to Hudson Loan Repayment Dates
28th Jul 201711:37 amRNSResult of AGM and Board Change
18th Jul 20177:00 amRNSAmendment to Loan Repayment Date
10th Jul 20174:35 pmRNSPrice Monitoring Extension
10th Jul 20177:00 amRNSNotice of AGM and Board Change
30th Jun 20177:00 amRNSResults For The Year Ended 31 December 2016
8th Jun 20177:00 amRNSCorporate Update
29th Mar 201712:33 pmRNSMining Convention and Funding Update
1st Mar 20177:00 amRNSAppointment of Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.