Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBPC.L Regulatory News (BPC)

  • There is currently no data for BPC

Technical Update

3 Sep 2019 07:00

RNS Number : 9667K
Bahamas Petroleum Company PLC
03 September 2019
 

3 September 2019

Bahamas Petroleum Company plc

("Bahamas Petroleum", "BPC" or the "Company")

Technical Update

 

On 21 August 2019 Bahamas Petroleum, the oil and gas exploration company with significant prospective resources in licences in The Commonwealth of The Bahamas, announced a coordinated approach toward drilling an initial exploration well(s) in 2020.

Further to this, and also in support of ongoing farm-in / funding discussions, the Company has continued to undertake a range of related technical work to continue to systematically reduce and mitigate play and prospect risk whilst also seeking to optimise the location of the upcoming exploration well(s) targeting the large structures that form the Company's sizeable prospect inventory. We are pleased to update shareholders on the results of this work.

 

Summary

As the Company moves forward to drilling operations, the Company has directed additional technical work in support of a successful initial exploration well(s), by: (a) seeking to increase confidence in the presence of hydrocarbons within the large structures to be drilled and therefore further reducing the play and prospect risks on the significant volumes of resource contained therein, and (b) optimising the location of the proposed exploration well(s), so as to maximise the chance of both operational and commercial success.

 

Consistent with these objectives, over the last several months the Company has undertaken four separate subsurface studies, in each case making use of expert third-party consultants. A description of and the conclusions derived from each study are summarised below. Each of these studies has now been included in the Company's extensive technical dataroom.

 

Taken collectively, these studies highlight the likely presence and quality of a world-class source rock and petroleum system located precisely in the BPC licence area, with charge and migration pathways evident to deliver hydrocarbons into the identified structures. The Company believes that hydrocarbon indicators have now been established from the 3D data with the reservoir rock demonstrating a well-developed fault and fracture system that will significantly influence the final selection of exploration well(s) drill sites so as to provide the highest confidence of encountering hydrocarbons.

 

1. Seismic Attribute Mapping - Self Organising Maps (SOM)

To maximise the flow of fluids from the surrounding reservoir into the well bore, it will be important to site the Company's exploration well(s) in a location where the well bore intersects the optimal site for the development of fault and fracture systems.

 

The Company has thus undertaken a seismic attribute study of its 3D data, making use of leading-edge industry technology. The objective of this study is to better determine the fracture and fault network local to proposed well locations.

 

To date the Company has predicted that the structural thrusting and folding genesis of the carbonate reservoir lithologies within the drill prospects would naturally lead to significant fracturing and thus enhanced reservoir quality. The attribute mapping study has now clearly demonstrated the presence and delineation of an extensive fracture and fault system within the 3D seismic area, thus validating what had previously been predicted. The Company considers this to be an extremely positive result. Increasing the Company's understanding of reservoir porosity and permeability will assist in the final, optimal positioning of the exploration well(s) inside any potential 'sweet spots' within the fracture / faulting network. This will maximize the chance of detecting hydrocarbons in the exploration well, in a way that the Company expects would maximize flow rates in a success case with knock-on impacts to potential future production economics.

 

2. Geophysical / seismic interpretation

A common industry pre-drill evaluation step for exploration in frontier basins is obtaining supporting geophysical evidence in the form of amplitude, attribute or anomaly analysis of seismic data. However, in the types of carbonate rock systems which characterise BPC's prospects, detailed analysis is more complex than for other rock systems. Notwithstanding this complexity, the Company has successfully undertaken a detailed evaluation of seismic amplitude, attribute and velocity from the Company's 3D data.

 

Importantly, these studies have demonstrated:

 

I. what the Company and its consultants believe to be direct hydrocarbon indicators (DHI's), consistent with an indicative presence of hydrocarbons within mapped structures;

II. strong amplitude conformance to structure, with amplitude termination / switch-off against faults and variation with depth, characteristics that are usually indicative of the presence of reservoir porosity and permeability; and,

III. seismic interval velocity reduction and variations between the target structure and the surrounding areas, characteristics that are usually suggestive of fracture porosity within the folded structure and detection of reservoir intervals within structural closure.

 

In short, the Company considers the results of these studies to be significant, in that they may directly indicate the presence of hydrocarbons in the structure(s) at the intended drilling location(s). This adds to the already sizeable body of evidence, derived both internally and from independent advisors and experts, in support of the Company's view that technical risk of the prospects is relatively low, thereby increasing confidence in a successful outcome of the exploration well(s).

 

3. Paleogeographic reconstruction

A Jurassic hydrocarbon source rock is ubiquitous across the region, and is known to generate hydrocarbons in the major production fields of the Gulf of Mexico and northern South America. In order to further increase technical confidence for potential petroleum systems and source rock distribution directly at the location of the Company licences a detailed paleogeographic and conjugate margin reconstruction study of the Caribbean, Northern South America and West Africa has been undertaken.

 

This study has corroborated the likely presence of a Late Jurassic oil-prone source rock and active petroleum system in the Santaren Channel, which is the precise location of BPC's licences and the intended drill site. This Late Jurassic source rock is analogous to the Smackover interval producing in deep-water Eastern US Gulf of Mexico, and has also been calibrated as the source of nearby onshore Cuba oil production. This Late Jurassic source rock is in addition to the previously recognised Early Cretaceous source rock in the region, also sourcing production in nearby Cuba and onshore Florida.

 

4. Cuban oil sample analysis

Through a reciprocal technical cooperation agreement with the Cuban National Oil Company ("CUPET"), the Company accessed 3D seismic data adjoining the BPC's licence areas in Cuban waters. In addition, CUPET provided to BPC oil samples that were subsequently independently analysed to assess the age and chemistry of the source rock linked to onshore production in Cuba.

 

The Cuban 3D seismic and oil sample data has corroborated the likely source rock charging the Company's drill prospects as late Jurassic. This is the same age and type of petroleum system, Bossier-Smackover, that charges the deepwater fields in the Eastern US Gulf of Mexico and nearby Cuba.

 

Simon Potter, Chief Executive Officer of Bahamas Petroleum Company, said:

 

"As we move forward operationally, and in view of ongoing farm-in and funding discussions, we have continued to undertake related technical studies. The objective of this work has been to further reduce subsurface risk by demonstrating the existence and quality of the petroleum system components, and also to optimise the location of the wells we intend to drill. We are most encouraged that these four most recent studies have each produced positive results, which when taken together support the potential presence of hydrocarbons in identified fractured networks, thereby serving to further technically de-risk the drill candidates and reconfirming our view that our prospects in The Bahamas represent a drill ready, potentially multi-billion barrel prospect inventory."

 

Regulatory Statements

 

In accordance with the AIM Note for Mining and Oil and Gas Companies, Bahamas Petroleum Company discloses that Randolph Hiscock, Bahamas Petroleum Company Technical Lead is the qualified person who has reviewed the technical information contained in this document. He has a Masters in geology and is a member of the AAPG. He has over 35 years' experience in the oil and gas industry. Randolph Hiscock consents to the inclusion of the information in the form and context in which it appears.

 

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

 

For further information, please contact:

 

Bahamas Petroleum Company plc

Simon Potter, Chief Executive Officer

 

Tel: +44 (0) 1624 647 882

Strand Hanson Limited - Nomad

Rory Murphy / James Spinney

 

Tel: +44 (0) 20 7409 3494

Shore Capital Stockbrokers Limited

Jerry Keen / Toby Gibbs

Tel: +44 (0) 207 408 4090

CAMARCO

Billy Clegg / Gordon Poole / James Crothers

Tel: +44 (0) 20 3757 4983

www.bpcplc.com

 

**** ENDS ****

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBLGDCUXGBGCD
Date   Source Headline
16th Oct 20097:00 amRNSDirectorate Change
15th Oct 20091:52 pmRNSChange of Name of Nominated Adviser
30th Sep 20097:00 amRNSInterim Results
22nd Sep 20095:00 pmRNSDirector/PDMR Shareholding
21st Sep 20095:00 pmRNSChange of Adviser
11th Sep 20098:40 amRNSHolding(s) in Company
28th Jul 200912:29 pmRNSHolding(s) in Company
4th Jun 20093:25 pmRNSResult of AGM
3rd Jun 20091:41 pmRNSAppointment of Joint Broker
18th May 20092:57 pmRNSPosting of Annual Accounts
18th May 20098:01 amRNSBPC and StatoilHydro announce exploration JV
9th Apr 20097:00 amRNSFinal Audited Results
1st Apr 20097:00 amRNSBoard Changes
21st Jan 20092:10 pmRNSMigration of Tax Residency
29th Sep 20087:00 amRNSInterim Results for BPC group
2nd Sep 20087:01 amRNSAIM Rule 26
2nd Sep 20087:00 amRNSAdmission to trading on AIM
1st Sep 20082:37 pmRNSOffer Unconditional / Result
29th Aug 20082:52 pmRNSSale of Drills and Equipment
21st Aug 20083:40 pmRNSDirectorship Update
14th Aug 20084:49 pmRNSSchedule 1 - Falkland Gold an
8th Aug 20087:00 amRNSAcquisition of BPC Limited
27th Jun 20082:01 pmRNSChange of Registered Office
24th Jun 20085:00 pmRNSInvesting strategy
18th Jun 20087:00 amRNSInterim Results
4th Mar 20083:59 pmRNSResult of AGM
3rd Mar 20081:38 pmRNSAnnual Report and Accounts
17th Jan 20087:00 amRNSUpdate & Notice of AGM
16th Nov 20077:00 amRNSPreliminary Results
10th Sep 20077:01 amRNSShareholder Update
17th Aug 20077:00 amRNSAIM Rule 26 Information
12th Jun 20077:00 amRNSInterim Results
28th Feb 20074:10 pmRNSResult of AGM
28th Feb 20072:28 pmRNSAGM Statement
8th Feb 200711:35 amRNSMovement in Share Price
26th Jan 20073:31 pmRNSNotice of AGM
15th Jan 20077:01 amRNSDisposal of interest
15th Jan 20077:01 amRNSChange in Shareholdings
5th Dec 20069:40 amRNSFinal Results
7th Sep 20067:00 amRNSUpdate on Operations
13th Jun 20067:00 amRNSInterim Results
27th Feb 20064:10 pmRNSResult of AGM
27th Feb 200610:00 amRNSAGM Statement
26th Jan 200611:40 amRNSNotice of AGM
19th Dec 20059:28 amRNSDisposal
16th Dec 20059:21 amRNSSale of Investment
16th Dec 20058:48 amRNSChange in Shareholdings-Amend
16th Dec 20058:25 amRNSChange in Shareholdings
13th Dec 20051:10 pmRNSFinal Results
18th Oct 20057:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.