Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBOIL.L Regulatory News (BOIL)

  • There is currently no data for BOIL

Drilling Report

2 Oct 2006 09:48

Gold Oil PLC02 October 2006 For Immediate Release 2nd October 2006 Gold Oil plc ("Gold") update on the testing of their Peruvian exploration well San Alberto-1X and Colombian Operations. San Alberto-1X was selected following extensive regional geological andgeophysical studies that tied in Block XXI to other Palaeozoic and Tertiarywells and fields. The well was spudded on 11th July 2006 and reached total depthof 5, 113 feet on the 3rd August 2006, meeting the geological objectives in thedrilling programme. The objectives of the well were the Tertiary Verdun sands that produce gas inOlympic's Las Casita gas field 20 kms to the west of San Alberto-1 and thefractured Palaeozoic quartzites that produce oil in PetroTech's offshore SanPedro field 50 kms to the west. Logging, drilling results and regionalinformation showed 250 gross feet of hydrocarbon bearing sands in the Palaeozoicand 315 gross feet of hydrocarbon bearing sands in the Verdun. The decision wastaken to production test these hydrocarbon bearing sands in both the Verdun andthe Palaeozoic. After circulating to completion fluid and running a slotted-liner over thePalaeozoic the drilling rig was moved off location. After clearing the locationa work-over hoist and test facilities moved on to the location on 22nd Augustand produced formation water at 960 barrels per day from the base of thePalaeozoic, below the hydrocarbon bearing interval. A heavier rig will move backonto location in mid to late October to pull the slotted liner and run andcement a new liner over the Palaeozoic which will isolate the water and allowthe hydrocarbon bearing intervals to be perforated and tested. In Colombia approval was finally obtained from the Ministry to start productionbut after only a few hours pumping out workover fluid from the well thehydraulic power pump that drives the downhole jet pump suffered a mechanicalfailure. A replacement pump was installed by the vendor and the well beganproduction, and then the surface pump failed again and was replaced by thevendor. In the meantime the well flowed at rates of between 467 and 738 bbls perday for a period of 12 hours before the surface pump failed again. The initialflow contained 60% oil, 30% completion fluid from cleaning up the well and 10%emulsion. The surface pump was replaced again and production recommenced. As of Friday thewell was producing between 830 and 683 bbls per day of 26.8o API gravity oil and24% completion fluid. First deliveries from the storage tank are planned to bemade over the weekend and the well is expected to stabilise once the last of thecompletion fluid is produced. The Company has also submitted an application to the Hydrocarbon Authority (ANH)for an exploration Licence for an area in north eastern Colombia that weidentified some months ago. The technical information contained in this announcement has been reviewed andapproved by Mike Burchell, B.Sc., 66, member of the SPE and with over 44 yearsexperience in the oil and gas business. Enquiries: Gary Moore Managing Director Tel: +44 (0)1737833597Email: gmoore@goldoilplc.com Mike Burchell Chairman Tel. +44 (0) 1372361772Email: mikeburchell@hotmail.com Roland Cornish Beaumont Cornish Limited Tel: 020 7628 3396 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
22nd Apr 20207:00 amRNSTimor-Leste: Shareholders’ Agreement
8th Apr 20207:00 amRNSInner Moray Firth Update on Licence Status
31st Mar 20207:00 amRNSTotal Voting Rights
20th Mar 20204:48 pmRNSSecond Price Monitoring Extn
20th Mar 20204:39 pmRNSPrice Monitoring Extension
19th Mar 20202:05 pmRNSSecond Price Monitoring Extn
19th Mar 20202:00 pmRNSPrice Monitoring Extension
10th Mar 202012:49 pmRNSResult of General Meeting
28th Feb 202011:00 amRNSTotal Voting Rights
20th Feb 20207:00 amRNSUpdate on GM Circular & Issue of warrants
20th Feb 20207:00 amRNSUpdate on GM Circular & Issue of warrants
14th Feb 202012:28 pmRNSPlacing and Subscription to raise £2.5 million
11th Feb 202011:05 amRNSSecond Price Monitoring Extn
11th Feb 202011:00 amRNSPrice Monitoring Extension
11th Feb 20209:56 amRNSTR-1: Notification of Major Interest in Shares
7th Feb 20202:05 pmRNSSecond Price Monitoring Extn
7th Feb 20202:00 pmRNSPrice Monitoring Extension
5th Feb 202011:06 amRNSSecond Price Monitoring Extn
5th Feb 202011:00 amRNSPrice Monitoring Extension
4th Feb 20201:30 pmRNSInformation on the Chuditch-1 Discovery
28th Jan 20207:30 amRNSRestoration - Baron Oil plc
28th Jan 20207:00 amRNSUpdate on Reverse Takeover & Resumption of Trading
14th Nov 20197:30 amRNSSuspension - Baron Oil Plc
14th Nov 20197:00 amRNSProposed Reverse Takeover & Suspension of Trading
11th Nov 20197:00 amRNSUpdate on Chuditch PSC, offshore Timor-Leste
8th Nov 20192:05 pmRNSSecond Price Monitoring Extn
8th Nov 20192:00 pmRNSPrice Monitoring Extension
8th Nov 201912:00 pmRNSAward to SundaGas of Chuditch PSC, Timor-Leste
1st Nov 20197:00 amRNSUKCS 31st Round Update
11th Oct 201911:00 amRNSPrice Monitoring Extension
20th Sep 20197:00 amRNSAward of UK 31st Offshore Round Licences
6th Sep 20197:00 amRNSUnaudited Interim Results
28th Jun 201911:41 amRNSTotal Voting Rights
26th Jun 20192:00 pmRNSResult of AGM
26th Jun 20197:00 amRNSAGM Statement
10th Jun 20197:00 amRNSPlacing and Subscription
5th Jun 20197:00 amRNSUKCS 31st Round Blocks Offered
31st May 20197:00 amRNSFinal Results & Notice of AGM
17th Apr 20192:06 pmRNSSecond Price Monitoring Extn
17th Apr 20192:00 pmRNSPrice Monitoring Extension
27th Mar 20194:41 pmRNSSecond Price Monitoring Extn
27th Mar 20194:35 pmRNSPrice Monitoring Extension
27th Mar 20197:00 amRNSCompany Update and Board Changes
8th Mar 20194:40 pmRNSSecond Price Monitoring Extn
8th Mar 20194:35 pmRNSPrice Monitoring Extension
8th Mar 201911:05 amRNSSecond Price Monitoring Extn
8th Mar 201911:00 amRNSPrice Monitoring Extension
8th Mar 20197:00 amRNSColter Side-Track Well Result
7th Mar 20194:41 pmRNSSecond Price Monitoring Extn
7th Mar 20194:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.