Vanadium Update

20 Jan 2017 07:00

RNS Number : 6664U
BMR Group PLC
20 January 2017
 

BMR Group PLC ("BMR" or the "Company")

Vanadium Update

BMR is pleased to report encouraging news concerning the potential recovery of Vanadium and production of Vanadium Pentoxide from its tailings at Kabwe which further bolsters its asset base.

Following the Company's announcement on 6 December 2016, the Board is pleased to report on the progress of its metallurgical test work currently being undertaken in collaboration with its partners, Kupfermelt and Alfred H Knight Laboratories, Kitwe for the recovery of Vanadium ("V") and the production of Vanadium Pentoxide (V2O5) from BMR's Kabwe tailings dumps.

The Board also announces the potential financial implications for the Company in respect of the current trading price of V2O5, and the historic V grades declared by Zambian Consolidated Copper Mines in their Mine Closure report

a) Vanadium Recovery Factors and Upgrading to Vanadium Pentoxide

The Board is pleased to report that the metallurgical test work to date has shown that no modifications should be required to the acid brine leach section at the Kabwe plant to recover the V from tailings and take it into solution as a by-product. Selective recovery of the V in solution has been successfully achieved during the Zinc re-leach phase, requiring only minimal changes to the current flowsheet design.

Preliminary test work results suggest an overall V2O5 recovery factor of approximately 65% (discounted 5% from actual test work results). Test work continues to optimise the V2O5 recovery factor, to establish final product quality and the design of the process circuit to produce V2O5. This will enable CAPEX and OPEX costs to be established, of which the former will be at an additional construction cost to the Company. An announcement will be made as soon as practicable concerning this additional cost, although at this stage the Company does not believe that it will be substantial. New technology will not be required for the production of V2O5.

b) Vanadium Pentoxide, Zinc and Lead Tailings Grades

Prior to the closure of the Kabwe mine in June 1994, each of the mine's tailings dumps were assayed by Zambian Consolidated Copper Mines (ZCCM), the results of which were disclosed in the Kabwe Mine Closure Report.

Although Mineral Consultancy Corporation (MCC) did not report V grades in their March 2012 JORC report, with one exception, the Zn and Pb grades for the WPT, LPR and ISFS tailings dumps mostly correlate closely with those published in the Mine Closure Report, as follows:-

Comparison of grades, MCC Report to Closure Report

 

 

 

 

 

MCC (Resource) Report

Mine Closure Report

% Deviation

 

Zn

Pb

Zn

Pb

Zn

Pb

WPT (JORC)

10.66%

7.21%

10.22%

6.72%

4.13%

6.80%

LPR (JORC)

3.88%

8.71%

4.33%

7.50%

11.60%

13.89%

ISFS (Non JORC)

8.07%

1.22%

8.55%

2.03%

5.95%

66.39%

 

MCC's QA/QC assaying protocols have classified as acceptable, a ±10% grade deviation for Certified Reference Materials (CRMs). The close correlation in the two reports of the Zn/Pb grades (JORC only, WPT and LPR), suggests in the Board's opinion that the Mine Closure Report's stated V grades can be considered as a fair guide to those V grades carried in the WPT, LPR and ISFS dumps as illustrated below:

Kabwe Mine Closure Report

 

 

Indicative V2O5 Grades

 

 

 

 

MCC

V2O5

Mine Closure

 

Tonnage

Av. Grade

Samples

Leach Plant Residue (LPR)

2,725,318

1.11%

46 samples

Wash Plant Tailings (WPT)

585,160

1.61%

10 samples

Imperial Smelting Furnace Slag (ISFS)

1,481,563

1.87%

8 samples

V Grades have been converted to V2O5 using a stoichiometric factor. Based on a recovery factor of 65% and this estimated tonnage, in theory the Plant could extract approximately 45,000 tonnes of V2O5.

The V tonnages and grades presented herein are non JORC and should not be construed as recoverable reserves or resources.

c) Upgrading Vanadium to a JORC Compliant Resource

Current metallurgical test work by the accredited laboratory, Alfred H Knight in Kitwe, is intended to confirm the process for the economic recovery of V based on work already carried out by the Company for all three tailings dumps and to produce V2O5. It is expected that this will be completed during February 2017, whereupon the Company will commission MCC to prepare an upgrade of V in the three tailings dumps to a JORC Compliant Resource.

d) Vanadium Price Rise and Financial Implications for the Company

Metal Bulletin's website is reporting December 2016 trades (Rotterdam, Europe) for V2O5 at circa US$23/kg (earlier estimated at US$15/Kg) and as a consequence the Company has revised upwards the potential long term contribution of V2O5 production to the Company's income stream.

After discounting the current V2O5 price by 10%, illustrated below by gross sales value is its potential contribution to the Company when compared to the theoretical production of Zinc cathodes, Lead Sponge and Zinc Sulphate Heptahydrate over the projected mine life currently estimated at 19 years.

LIFE OF MINE INDICATIVE PRODUCTION TONNAGES AND GROSS SALES VALUES

PRODUCT

TONNES

 PRICE, US/t

VALUE $M

Lead Sponge

276,364

$2,267

$626.5

Zinc Cathodes

144,853

$2,693

$390.1

Zinc Sulphate Heptahydrate

570,000

$750

$427.5

Vanadium pentoxide, V2O5

45,000

$21,000

$952.2

TOTAL

 

 

$2,396.3

Note. 18th Jan 2017 LME Zn and Pb cash sale prices.

The calculated production values of metals are indicative and should not be construed as likely revenues to the Company.

e) ZEMA Approval

The Company has been advised by its consultant J A Consultancy that based on ZEMA's existing approval to build the Plant, approval to operate a V2O5 processing circuit should only require an Environmental Project Brief (EPB) which the Company intends to lodge in February 2017 with approval generally expected within 4 to 6 months.

Note: This announcement has been reviewed by Geoff Casson, B.Sc. (Hons), PhD, R Eng (Zambia), Member Engineering Institute of Zambia (Metallurgy), General Manager of the Company's Zambian subsidiary, Enviro Processing Ltd, who is a Qualified Person in accordance with the guidance note for Mining, Oil & Gas Companies issued by the London Stock Exchange in respect of AIM Companies.

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

 

Alex Borrelli, Chairman, commented: "This is encouraging news concerning the potential recovery of Vanadium and production of Vanadium Pentoxide from our tailings at Kabwe which further bolsters our asset base."

Ends

For further information:

BMR Group PLC 020 7734 7282

Alex Borrelli, CEO and Chairman

 

WH Ireland Limited 020 7220 1666

NOMAD and Joint Broker

Chris Fielding, Head of Corporate Finance

Nick Prowting, Manager

 

Peterhouse Corporate Finance 020 7469 0930

Joint Broker

Lucy Williams/ Duncan Vasey/ Heena Karani

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGUBWGUPMGMB
Date   Source Headline
26th Nov 20099:07 amRNSFinal Results
10th Nov 20097:00 amRNSPlacing
14th Oct 20097:00 amRNSDirector Shareholding
13th Oct 20097:00 amRNSFurther grant of mining rights
6th Oct 20099:00 amRNSDirector Shareholding
1st Oct 20097:00 amRNSKabwe Dumps Acquisition Update
31st Mar 20092:00 pmRNSInterim Results
30th Jan 200912:14 pmRNSAGM Statement
30th Dec 200812:00 pmRNSFinal Results
16th Dec 20087:00 amRNSPositive Assay Results
24th Jul 20081:36 pmRNSTotal Voting Rights
8th Jul 20087:00 amRNSZambian Mining & Processing R
27th Jun 20085:00 pmRNSStatement re: Share Price Mov
28th Mar 20087:01 amRNSInterim Results
6th Mar 200812:53 pmRNSChange of Name
13th Feb 20082:24 pmRNSGeneral Meeting
21st Dec 20073:22 pmRNSFinal Results
20th Nov 20072:04 pmRNSDirector/PDMR Shareholding
19th Nov 200710:22 amRNSHolding(s) in Company
9th Nov 20073:00 pmRNSHolding(s) in Company
9th Nov 20077:01 amRNSNew Activity / Funds raised
26th Oct 200710:35 amRNSHolding(s) in Company
5th Sep 20071:55 pmRNSHolding(s) in Company
20th Aug 20077:01 amRNSAIM Rule 26
30th Jul 200711:25 amRNSCompany Update
4th May 20071:57 pmRNSBoard Change
29th Mar 20071:14 pmRNSInterim Results
27th Mar 20071:50 pmRNSVoice Quality Software Stack
29th Dec 200611:25 amRNSPreliminary Results
22nd Dec 20069:59 amRNSTotal Voting Rights
24th Nov 20067:00 amRNSProduct Launch
23rd Nov 20067:00 amRNSConference Attendance
11th Sep 20067:01 amRNSVoice Quality Software
5th Jul 20068:00 amRNSICB Reclassification
31st Mar 20064:09 pmRNSInterim Results
6th Mar 200612:40 pmRNSSale of shareholding
21st Feb 20067:00 amRNSRe: Licensing Agreement
27th Jan 200611:12 amRNSAGM Statement
27th Jan 200611:09 amRNSRe: Placement of shares
23rd Dec 200512:03 pmRNSAnnual Report and Accounts
22nd Dec 200512:00 pmRNSFinal Results
29th Nov 20057:00 amRNSRe Joint Venture
3rd Oct 20057:00 amRNSContract Update
3rd Oct 20057:00 amRNSRe Contract
25th Jul 20054:02 pmRNSHolding(s) in Company
11th Jul 20057:00 amRNSIssue of Equity
27th Jun 20057:00 amRNSNew Contract Awarded
16th Jun 20057:00 amRNSC3 Product Delivery completed
10th Jun 200512:30 pmRNSGrant of Share Options
31st May 20059:00 amRNSTechnology Supply Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.