Kabwe Progress Update

22 Mar 2010 07:00

RNS Number : 9047I
Berkeley Mineral Resources PLC
22 March 2010
 



BERKELEY MINERAL RESOURCES PLC

("BMR" or "THE COMPANY")

 

Kabwe Progress Update

 

Berkeley Minerals Resources plc, which is primarily engaged in acquiring and processing mining tailings, announces that the negotiations to acquire additional on-surface resources of lead and zinc at the Kabwe mine in Zambia are progressing well and are nearing completion. 

 

At the AGM of BMR on 18 December 2009, the Company announced that it was negotiating to secure rights to process dumps adjacent to the three currently secured at the Kabwe mine-site in Zambia and to expand operations with a pyrometallurgical facility. The three dumps are estimated to contain in excess of 98,000t Zn and 25,000t Pb, valued at over $200m at LME Spot prices.

 

The acquisition of the rights to further stockpiles of zinc and lead tailings will strengthen the economics of the project and the Company's ability to commence production in the second half of 2010 as presaged. 

 

At the same time, detailed metallurgical process and financial planning is taking place for the provision of a larger beneficiation plant. BMR is also negotiating to secure further space at Kabwe for the siting of that plant. The Company estimates that these developments should enable it to substantially extend the life of the project beyond the timescale so far envisaged. 

 

Masoud Alikhani, Chairman, Berkeley Mineral Resources plc, commented:

 

"Since the beginning of 2009, the cash London Metal Exchange prices of both zinc and lead have more than doubled. Looking ahead, from now until the end of 2015, a total of 13 substantial zinc/lead mines across the world are scheduled to become depleted. In a report published in January 2010, Credit Suisse estimated that a 60% increase in new mined production will be necessary to meet expected global zinc demand by 2016.

 

"This represents a singular market opportunity for us and the Directors are conscious of the desirability of BMR becoming significant suppliers of lead and zinc at this juncture. By processing more dumps at Kabwe we can generate early cash-flow and reduce entry costs. We have the additional advantages that all the material has already been mined and is above ground and all the necessary infrastructure is in place."

 

Notes to editors

BMR is a minerals company with a primary strategy of investing in tailings processing. By accessing dump deposits with known grades and metallurgy, it avoids exploration or mining costs, has a secure licence and fixed environmental criteria, and can produce concentrates according to viability at current market prices.

 

The Kabwe deposits, located approximately 110km north of the Zambian capital Lusaka, were discovered in 1902. From 1906, Kabwe was a significant mine. By the time it closed in 1994, due to depletion of the massive sulphide mineralisation and lowered metal prices, it had produced about 1.8m tonnes of zinc, 800,000t of lead, 7,800t of vanadium pentoxide and lesser quantities of cadmium, silver and copper. After closure, most of the mine complex was sold off on a piecemeal basis. Berkeley's project is part of an overall plan to re-assemble the Kabwe site into a single entity operating under a single Large Scale Mining Licence.

 

The waste dumps at Kabwe cover an area of about 1km2 and contain approximately 8m tons of various waste residues with an estimated combined metal content of 455,000t zinc and 368,500t lead.

 

BMR benefits from the existing infrastructure at Kabwe, including processing plant, good roads, water supply, ample power, local labour and direct on-site sidings connection to overseas markets via international railways to South Africa and to Indian Ocean ports.

 

 

For further information please see the Company's website at http://www.bmrplc.com

 

The Directors of Berkeley Mineral Resources plc accept responsibility for this announcement.

 

22 March 2010

 

Contacts:

Masoud Alikhani, Chairman, Berkeley Mineral Resources

020 7408 1181

Jonathan Wright, Seymour Pierce

020 7107 8050

Michael Padley / Ron Marshman, Lothbury Financial

020 7011 9411

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUKVBRRBAOAAR
Date   Source Headline
26th Nov 20099:07 amRNSFinal Results
10th Nov 20097:00 amRNSPlacing
14th Oct 20097:00 amRNSDirector Shareholding
13th Oct 20097:00 amRNSFurther grant of mining rights
6th Oct 20099:00 amRNSDirector Shareholding
1st Oct 20097:00 amRNSKabwe Dumps Acquisition Update
31st Mar 20092:00 pmRNSInterim Results
30th Jan 200912:14 pmRNSAGM Statement
30th Dec 200812:00 pmRNSFinal Results
16th Dec 20087:00 amRNSPositive Assay Results
24th Jul 20081:36 pmRNSTotal Voting Rights
8th Jul 20087:00 amRNSZambian Mining & Processing R
27th Jun 20085:00 pmRNSStatement re: Share Price Mov
28th Mar 20087:01 amRNSInterim Results
6th Mar 200812:53 pmRNSChange of Name
13th Feb 20082:24 pmRNSGeneral Meeting
21st Dec 20073:22 pmRNSFinal Results
20th Nov 20072:04 pmRNSDirector/PDMR Shareholding
19th Nov 200710:22 amRNSHolding(s) in Company
9th Nov 20073:00 pmRNSHolding(s) in Company
9th Nov 20077:01 amRNSNew Activity / Funds raised
26th Oct 200710:35 amRNSHolding(s) in Company
5th Sep 20071:55 pmRNSHolding(s) in Company
20th Aug 20077:01 amRNSAIM Rule 26
30th Jul 200711:25 amRNSCompany Update
4th May 20071:57 pmRNSBoard Change
29th Mar 20071:14 pmRNSInterim Results
27th Mar 20071:50 pmRNSVoice Quality Software Stack
29th Dec 200611:25 amRNSPreliminary Results
22nd Dec 20069:59 amRNSTotal Voting Rights
24th Nov 20067:00 amRNSProduct Launch
23rd Nov 20067:00 amRNSConference Attendance
11th Sep 20067:01 amRNSVoice Quality Software
5th Jul 20068:00 amRNSICB Reclassification
31st Mar 20064:09 pmRNSInterim Results
6th Mar 200612:40 pmRNSSale of shareholding
21st Feb 20067:00 amRNSRe: Licensing Agreement
27th Jan 200611:12 amRNSAGM Statement
27th Jan 200611:09 amRNSRe: Placement of shares
23rd Dec 200512:03 pmRNSAnnual Report and Accounts
22nd Dec 200512:00 pmRNSFinal Results
29th Nov 20057:00 amRNSRe Joint Venture
3rd Oct 20057:00 amRNSContract Update
3rd Oct 20057:00 amRNSRe Contract
25th Jul 20054:02 pmRNSHolding(s) in Company
11th Jul 20057:00 amRNSIssue of Equity
27th Jun 20057:00 amRNSNew Contract Awarded
16th Jun 20057:00 amRNSC3 Product Delivery completed
10th Jun 200512:30 pmRNSGrant of Share Options
31st May 20059:00 amRNSTechnology Supply Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.