Mokopane Vanadium Project Update

PFS and Mining Right Update

 

Bushveld Minerals Limited (AIM: BMN), a diversified mineral development company with projects in Africa, is pleased to provide a corporate update in respect of the Mokopane Vanadium Project in Limpopo Province, South Africa.

The update comprises the Pre-Feasibility Study and Mining Right Application, as well as an update in respect of the maiden Mineral Resource Estimate and additional metallurgical testwork results for the AB Zone. The additional metallurgical Davis Tube Testwork (DTT) comprised 10 samples from the AB Zone, so as to assess the variability of the in-situ vanadium grade and the potential recovery of vanadium to a titano-magnetite ("Ti-magnetite") concentrate.

Highlights:

· AB-Zone Mineral Resource Estimate

- Maiden Mineral Resource Estimate of 12.5 Mt at an in-situ grade of 0.7% vanadium pentoxide (V2O5) for the AB Zone;

- AB Zone concentrate grades of between 2.01% and 2.65% V2O5 with limited variability, and an average grade of 2.21% V2O5;

- Excellent AB Zone vanadium recoveries to concentrate of up to 97.82%; and

- Significantly higher V2O5 concentrate grades in the AB Zone than those previously reported from the Main Magnetite Layer ("MML").

· Mokopane Vanadium PFS & Mining Right Application

- Mokopane Vanadium Project Pre-feasibility Study and Mining Right Application making good progress.

 

Fortune Mojapelo, CEO of Bushveld Minerals, said:

"The maiden Mineral Resource Estimate and updated metallurgical results confirm our expectations that the AB Zone represents significant upside for the project. The exceptional concentrate grades, in excess of 2% V2O5, are approximately 20% higher than the MML concentrate grades on which the Scoping Study and the Pre-feasibility Study have been based. This represents a significant additional Mineral Resource, and moreover upside from the excellent vanadium grades that the testwork shows we can recover."

 

MINERAL RESOURCE ON THE AB ZONE LAYERS

We are pleased to report a maiden Mineral Resource on the AB Zone of the Mokopane Vanadium Project. The AB Zone consists of a layer of disseminated Ti-magnetite identified approximately 180 metres stratigraphically below and parallel to the MML. During the recent drilling campaign on the Mokopane Vanadium Project, a number of boreholes were drilled to intersect the AB Zone. These drilling results (reported on 26 February 2015) have been used to determine a maiden Mineral Resource Estimate of 12.5 Mt at an in-situ grade of 0.7% vanadium pentoxide (V2O5). The Mineral Resource Estimate was undertaken by The MSA Group.

The AB Zone has been subdivided into three units based on the abundance of Ti-magnetite: an upper Ti-magnetite rich zone on average 1.93 metres thick; a Ti-magnetite-poor parting on average 2.86 metres thick; and a lower unit with disseminated Ti-magnetite, which is on average 4.51 metres thick. The Mineral Resource is reported in accordance to the guidelines of the 2012 edition of the JORC Code. It is reported down to a vertical depth of 120 metres below surface and at a cut-off grade of 0.3% V2O5.

AB Zone Mineral Resource at 0.3% V2O5 cut-off, ≤120 m vertical depth, as at 16 July 2015

Layer

Mineral Resource

Category

Tonnes

Thickness

Density

V2O5

Fe2O3

TiO2

P2O5*

SiO2*

Al2O3*

S*

V2O5

Name

1Mt

m

t/m3

%

%

%

%

%

%

%

2Kt

AB Upper

Inferred

2.7

1.93

3.29

0.89

34.7

5.4

0.01

30.3

17.1

0.06

24.3

AB Parting

Inferred

3.7

2.86

3.07

0.48

20.9

3.0

0.01

40.0

19.7

0.01

17.9

AB Lower

Inferred

6.0

4.51

3.21

0.75

29.1

4.3

0.01

34.6

18.6

0.01

45.1

3Total

Inferred

12.5

9.30

3.18

0.70

27.9

4.2

0.01

35.3

18.6

0.02

87.3

1Mt = million tonnes, 2Kt = thousand tonnes, 3Rounding may cause computational errors

*Included for informative purposes only, no value will be derived from these materials

 

Davis Tube Testwork ("DDT") ON THE AB ZONE LAYERS

As a follow-up to the initial DTT on a single sample from the AB Zone, announced on 27 November 2013, the Company commissioned SGS Laboratories (Johannesburg) to undertake additional DTT on a number of samples from the AB Zone. This testing was done to check the previous testwork (done on a single composite sample), to establish the variability in the vanadium grades of Ti-magnetite concentrates produced from these samples, and of the recovery of vanadium to the concentrates. A total of 10 samples were tested, for which the results are shown in the table below:

BH

From-To (m)

Fe %

V2O5 %

TiO2 %

Feed

Mags

Recovery

Feed

Mags

Recovery

Feed

Mags

Recovery

VL38

26.00-27.00

24.76

57.35

92.44

0.82

2.01

97.82

4.07

9.02

88.45

VL16

20.24-21.22

24.06

56.30

88.81

0.90

2.29

96.57

4.81

9.95

78.51

VL16

25.00-25.75

22.73

57.56

90.40

0.99

2.65

95.55

4.29

9.71

80.80

VL23

58.58-58.87

38.19

55.12

81.71

1.40

2.23

90.19

8.69

11.80

76.88

VL23

68.29-69.00

17.77

47.14

60.40

0.63

2.17

78.40

3.86

10.80

63.69

VL37

7.50-9.60

35.53

57.63

90.42

1.19

2.08

97.44

7.66

11.10

80.78

VL15

45.50-46.00

19.09

56.51

84.15

0.70

2.19

88.95

3.54

9.52

76.46

VL14

57.60-57.85

34.55

42.88

52.43

1.30

2.04

66.31

8.26

11.70

59.85

VL14

64.00-65.00

25.25

56.23

85.20

0.92

2.22

92.31

5.52

9.73

67.43

VL22

52.69-53.07

28.82

57.00

92.68

1.04

2.17

97.76

6.50

11.00

79.29

The previous sample, announced on 27 November 2013, yielded a concentrate grade of 2.38% V2O5, which is within the range of concentrates assayed for the recent and more detailed testwork, but higher than the weighted average grade of 2.21% V2O5.

MOKOPANE VANADIUM PROJECT PFS

Separately, the Mokopane Vanadium Project Pre-Feasibility study ("PFS") is ongoing based on the Mineral Resource defined on the MML only It comprises of studies for: business case optimisation; studies to determine an optimum rate of mining; pit designs; tailings studies; infrastructure studies; processing flow sheet development; and financial modelling.

The Company is focused on completing the PFS within the 2015 calendar year, which will enable Bushveld Vanadium to focus on identifying routes to advance the project towards a Definitive Feasibility Study, and to evaluate options to target early production.

Concurrently, the Company's application for a Mining Right continues to progress. An Environmental Impact Assessment has been completed, submitted to and accepted by the Department of Mineral Resources as required by the Mineral and Petroleum Resources Development Act No 28 of 2002 (MPRDA). The Company looks forward to providing further updates on the Mokopane Vanadium Project in due course.

Competent Person

The scientific and technical information relating to Mineral Resource estimation contained within this announcement has been reviewed and approved by Mr. Jeremy Witley, a professional geologist with more than 25 years' experience in base and precious metals exploration and mining as well as Mineral Resource evaluation and reporting. He is Principal Resource Consultant for the MSA Group and has the appropriate relevant qualifications, experience, competence and independence to be considered a "Competent Person" under the definitions provided in the JORC Code 2012 Edition.

 

Enquiries: info@bushveldminerals.com

 

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Strand Hanson

Andrew Emmott

+44 (0) 20 7409 3494

Mirabaud Securities

Rory Scott

+44 (0) 20 7878 3360

Brandon Hill Capital

Oliver Stansfield

+44 (0) 20 3463 5000

Tavistock

Jos Simson/ Nuala Gallagher

+44 (0) 20 7920 3150

Russell & Associates

Jane Kamau-Appiah/James Duncan

+27 (0) 11 880 3924

 

- ENDS -

 

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company with a portfolio of vanadium-and titanium bearing iron ore, tin and coal assets in Southern Africa and Madagascar.

 

The Group owns the Bushveld Vanadium Project, Mokopane Vanadium Project, Bushveld Iron Ore Project and Mokopane Tin Project, located on the northern limb of the Bushveld Complex, South Africa. Bushveld also owns the Imaloto coal project in Madagascar, acquired in September 2015, through its takeover of Lemur Resources.

 

Bushveld was admitted to the AIM of the London Stock Exchange in March 2012.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPKKDQDBKDFCN
Date   Source Headline
16th May 20257:00 amRNSCancellation - Bushveld Minerals Limited
15th Apr 20254:28 pmRNSAppointment of Liquidators & Resignation of Nomad
11th Apr 20257:57 amRNSNotice of appointment of liquidators
15th Jan 20256:00 pmRNSBushveld Minerals
16th Dec 20247:15 amRNSBusiness Rescue and Operations Update
4th Dec 20247:00 amRNSResignation of Directors
29th Nov 20247:00 amRNSDefault on Shareholder Loan Repayment by Vanchem
19th Nov 202410:01 amRNSAppointment of Business Rescue Practitioners
18th Nov 20247:30 amRNSSuspension - Bushveld Minerals Limited
18th Nov 20247:00 amRNSTrading Suspension
8th Nov 20249:25 amRNSQ3 and 9M 2024 Operational Update
1st Nov 20243:05 pmRNSVanchem Sale Update
25th Oct 20242:21 pmRNSOperational Update
18th Oct 20249:18 amRNSDisposal of Interests in Lemur Holdings Limited
17th Sep 20247:00 amRNSInterim Results for Six Months ended 30 June 2024
10th Sep 20247:00 amRNSTurnaround Initiatives Underway
2nd Sep 20244:22 pmRNSOrion Matched Funding Received
14th Aug 20246:00 pmRNSSARB Approval for Orion US$10M Matched Funding
12th Aug 20244:13 pmRNSUS$2 million SPR Debt Funding Received
9th Aug 20249:55 amRNSAgreement re Settlement of SPR Subscription Funds
7th Aug 20244:25 pmRNSAnnual General Meeting Results
7th Aug 20247:00 amRNSDirector/PDMR Shareholding
6th Aug 20247:00 amRNSAnnual General Meeting Statement
31st Jul 20247:00 amRNSQ2 and H1 2024 Operational Update
24th Jul 20244:46 pmRNSHolding(s) in Company - Correction
15th Jul 202412:39 pmRNSDirector/PDMR Shareholding
12th Jul 20244:57 pmRNSDirector/PDMR Shareholding
11th Jul 20245:04 pmRNSPosting of Accounts & Notice of General Meeting
28th Jun 20245:30 pmRNSFinal Results for Year Ended 31 December 2023
28th Jun 20243:29 pmRNSFinancing Update: Orion matched funding of US$10m
28th Jun 20241:17 pmRNSHolding(s) in Company
26th Jun 202412:13 pmRNSHolding(s) in Company
24th Jun 20241:50 pmRNSSPR Funding & Orion 2024 Financing Package Update
31st May 20244:07 pmRNSCCSA Approval for sale of 64% interest in Mokopane
31st May 20241:07 pmRNSResult of Meeting
24th May 20245:53 pmRNSShareholder Correspondence and Questions & Answers
13th May 20247:00 amRNSPosting of Circular and Notice of General Meeting
7th May 20247:00 amRNSProposed conditional disposal of Vanchem
23rd Apr 20247:01 amRNSQ1 2024 Operational & Corporate Update
23rd Apr 20247:00 amRNSMineral Resources and Reserves Annual Update
14th Mar 20249:32 amRNSFurther Update on Outstanding Funds
14th Mar 20247:00 amRNSTR-1 Notification of Major Holdings
7th Mar 20243:00 pmRNSTR-1 Notification of Major Holdings
29th Feb 20245:30 pmRNSFurther Update on Outstanding Funds
16th Feb 20247:08 amRNSFurther update on Outstanding Funds
5th Feb 20247:08 amRNSFull year 2023 Operational Update
2nd Feb 20242:30 pmRNSForm 8.3 of the Takeover Code
1st Feb 20247:00 amRNSCompletion of Convertible Loan Note Refinancing
29th Jan 20244:25 pmRNSResignation of Finance Director
19th Jan 20244:32 pmRNSFurther Update on Outstanding Funds

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.