Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBowleven Regulatory News (BLVN)

Share Price Information for Bowleven (BLVN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.20
Bid: 0.15
Ask: 0.25
Change: 0.00 (0.00%)
Spread: 0.10 (66.667%)
Open: 0.20
High: 0.20
Low: 0.20
Prev. Close: 0.20
BLVN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Result of IE-4 well

18 Oct 2018 09:17

RNS Number : 4644E
Bowleven plc
18 October 2018
 

18 October 2018

 

 

Bowleven plc

 

('Bowleven' or 'The Company')

 

Etinde Operational Update

 

Result of IE-4 well

 

Update on ongoing post drilling analysis of IM-6 well

 

 

Bowleven, the Africa focused oil and gas company traded on AIM, is pleased to announce the completion of drilling of the IE-4 appraisal well at the Etinde block, Cameroon, by the block's operator, New Age Cameroon Offshore Petroleum SA ("NewAge").

 

The object of the well was to appraise two Intra-Isongo aged 410 sand packages in two fault bounded structures. The primary target, "Drillbit", is structurally higher than the lower, "Crowbar" sand package, which partially sits below and to the west of Drillbit

 

The crowbar 410 sand package is tagged very close to the separating boundary fault between the two structures.

 

Initial wireline logging and down hole fluid sampling has been completed and an initial interpretation of the data has been completed. The preliminary results are:

 

· The Drillbit sand body is water saturated at the IE-4 location. Whilst there are indications that hydro-carbons may have been present in the Drillbit sand package at one time, the fault block either never completely sealed or was opened at a subsequent time.

· The Crowbar 410 sand package results indicate that the tagged location shows low permeability, probably due to being adversely affected by fluid flow around the fault. Fluid sampling indicates that the upper part of the 410 sand package at the IE-4 location is volatile light Oil or Condensate bearing with gas. This appears to be sitting above water saturated lower 410 sands. The data suggests that the Crowbar 410 sand package is partially hydrocarbon charged.

 

In addition, an unprognosed sequence of thinly bedded high porosity sand horizons of about 30 metres gross (20 metres net) thickness was drilled some 50 metres above the drillbit 410 sand package. Fluid sampling has shown the sands to be light oil saturated.

 

The IE-3 well showed a similar looking oil bearing sequence, which has been tentatively correlated with the IE-4 sequence, although these thin sandstone layers are not well imaged in the seismic data. Tentatively, based on the IE-4 location and the potential IE-3 correlation alongside the seismic data analysis, this structure trap is around 2 km squared in volume, with an additional untested structural high to the North West.

 

The lower 12 metres of this sequence was tested at a flow rate of 17.1 mmscftg/d and 8780 bopd on a 56/64'' inch choke.

Additional evaluation is being undertaken on the IE field ahead of a broader interpretation being detailed. This discovery bodes well for the potential of the Etinde field and further test data and volumetric evaluation will be ongoing. The test results have increased the overall likelihood of a commercial development of the IE field area.

 

Update on the ongoing post drilling analysis of the IM-6 well

 

An assessment of the reservoir pressure data collected at the IM-6 location with that at IM-5 has allowed a determination of the expected wet gas/water contact within the Intra-Isongo aged 410 sand packages with the "Awl" structure first drilled at the IM-5 location. The contact is calculated to be at 3,050 metre depth (tvdss) on the basis that the reservoir fluids between the IM-5 and IM-6 locations are connected. Based on this data, the volume of the Awl reservoir increases from c5.8 km to c8.9 km. The IM-6 well, which successfully appraised the Intra Isongo section of the field, established a lower gas water contact and adding an additional 150-250 bcf of wet gas resources on a P50 confidence basis. Further analysis will need to be completed before any resource increment can be booked in accordance with the appropriate internal standard.

 

This is very much a preliminary analysis and is subject to further analysis and interpretation of the data collected during the IM-6 drilling and logging. Post-well studies are expected to be completed by the end of Q1 2019. Subsequently, the JV partners have agreed to undertake further geological and technical analysis including remapping the identified leads and prospective traps within the Etinde licence area. This work will be ongoing through 2019 alongside the additional data obtained from the IE-4 well.

 

Bowleven and its JV partners are currently re-assessing development options for the Etinde field.

 

New Age is the operator of the Etinde field, with a 37.5% working interest. Bowleven and LUKOIL are partners with a 25% and 37.5% working interest respectively. The Company intends to announce the final well results after the end of drilling and testing operations.

 

Eli Chahin, Chief Executive Officer of Bowleven plc, commented:

"We are satisfied that the initial post-drilling analysis of the IM-6 well data has demonstrated an increase in the volume of the Awl 410 reservoir and is likely to result in an increment to the wet gas in place P50 resources discovered when the technical analysis is completed and new external report on the Etinde licence resources is prepared in due course.

The preliminary test results from IE-4 suggest a very interesting set of results and will add a broader commercial dimension to our Cameroon acreage.

We now look forward to working with the JV partners to access the significance of the well test results from the newly discovered sand horizons which offers the potential to provide a further increase to our discovered resource volumes in a new stratigraphic horizon."

 

Dr Michael Clancy has reviewed the information contained in this announcement. Dr Clancy, Reservoir Engineering Consultant for the Group, is Petroleum Engineer with over 30 years of experience in the oil and gas industry and is a member of the Society of Petroleum Engineers.

 

 

ENQUIRIES

For further information, please contact:

Bowleven plc

Eli Chahin, Chief Executive

00 44 131 524 5678

Celicourt Communications Ltd

Mark Antelme

00 44 207 520 9261

Henry Lerwill

Stockdale Securities Ltd (NOMAD and Broker)

Robert Finlay

00 44 207 601 6100

Antonio Bossi

David Coaten

 

 

Glossary

 

Tcf/bcf

Trillion/billion cubic feet (of gas)

TVD

Total Vertical Depth

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFKFDDFBDKPKD
Date   Source Headline
21st Nov 20133:32 pmRNSDirector/PDMR Shareholding
20th Nov 20139:54 amRNSDirector/PDMR Shareholding
19th Nov 20132:35 pmRNSHolding(s) in Company
18th Nov 20133:06 pmRNSHolding(s) in Company
18th Nov 20132:57 pmRNSDirector/PDMR Shareholding
13th Nov 201310:04 amRNSDirector/PDMR Shareholding
13th Nov 20139:07 amRNSResult of Issue of Equity
13th Nov 20137:09 amRNSIssue of Equity
13th Nov 20137:00 amRNSPreliminary Results 2013
8th Nov 20135:29 pmRNSHolding(s) in Company
1st Nov 20137:00 amRNSHolding(s) in Company
12th Sep 20135:07 pmRNSDirector/PDMR Shareholding
10th Sep 20131:06 pmRNSHolding(s) in Company
4th Sep 201312:34 pmRNSHolding(s) in Company
2nd Sep 20137:00 amRNSBlocklisting Interim Review
12th Aug 20133:33 pmRNSHolding(s) in Company
6th Aug 201311:48 amRNSHolding(s) in Company
23rd Jul 20137:00 amRNSEtinde Exploitation Authorisation Application
4th Jul 20137:00 amRNSFirst Oil Investment in Bowleven New Ventures
28th Jun 20131:02 pmRNSGrant of LTIP Award
26th Jun 20131:42 pmRNSExecutive Director Appointment
30th May 20135:02 pmRNSDirector Announcement
23rd May 20137:00 amRNSGroup Operations Update
22nd May 20131:49 pmRNSIM-5 - SNH Press Release
20th May 20133:15 pmRNSHolding(s) in Company
22nd Apr 20135:40 pmRNSHolding(s) in Company
19th Apr 20137:00 amRNSIM-5 testing update
15th Apr 20139:47 amRNSHolding(s) in Company
2nd Apr 20137:00 amRNSIM-5 preliminary testing update
28th Mar 20133:11 pmRNSTotal Voting Rights
21st Mar 20134:27 pmRNSHolding(s) in Company
20th Mar 20137:00 amRNSInterim Results Announcement
6th Mar 20137:00 amRNSIM-5 Preliminary Volumetrics Update
1st Mar 20137:00 amRNSBlocklisting Interim Review
25th Feb 20132:40 pmRNSHolding(s) in Company
22nd Feb 20134:43 pmRNSHolding(s) in Company
5th Feb 201311:37 amRNSHolding(s) in Company
30th Jan 201311:10 amRNSIM-5 Drilling Update
28th Jan 20136:05 pmRNSHolding(s) in Company
28th Jan 20133:20 pmRNSCorrection - Holding(s) in Company
16th Jan 20132:49 pmRNSHolding(s) in Company
15th Jan 20135:35 pmRNSHolding(s) in Company
14th Jan 20134:08 pmRNSHolding(s) in Company
14th Jan 20133:56 pmRNSHolding(s) in Company
20th Dec 20128:22 amRNSHolding(s) in Company
12th Dec 20121:06 pmRNSRESULT OF GENERAL MEETING
12th Dec 20121:05 pmRNSResult of AGM
11th Dec 20128:24 amRNSConditional vesting of 2009 LTIP Awards
26th Nov 20127:00 amRNSEEAA submitted
19th Nov 20125:00 pmRNSPosting of Annual Report and Accounts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.