Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBowleven Regulatory News (BLVN)

Share Price Information for Bowleven (BLVN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.20
Bid: 0.15
Ask: 0.25
Change: 0.00 (0.00%)
Spread: 0.10 (66.667%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.20
BLVN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary Result of IM-6 well, Etinde, Cameroon

15 Aug 2018 16:40

RNS Number : 9380X
Bowleven plc
15 August 2018
 

15 August 2018

 

Bowleven plc

 

('Bowleven' or 'The Company')

 

Etinde Operational Update

 

Preliminary Result of IM-6 well, Etinde, Cameroon

 

Bowleven, the Africa focused oil and gas company traded on AIM, is pleased to announce the completion of drilling of the IM-6 appraisal well at the Etinde block, Cameroon, to a total depth of 3,550 meters by the block's operator, New Age Cameroon Offshore Petroleum SA ("NewAge").

 

The primary objective of the well, to delineate the wet gas/water contact location within the intra-Isongo 410 sand reservoir, has been achieved. The joint venture partners (the "Partners") believe that sufficient pressure measurements appear to have been taken, which alongside the well log data following further analysis and reservoir modelling, will allow a revised estimate of the condensate bearing wet gas/water reservoir volume in the 410 intra-Isongo sandstone gas condensate discovery. The Etinde field has discovered wet gas in place of c 0.9-1.1 tcf. The IM-6 well was targeting an incremental 0.7 tcf of wet gas in place from the 410 horizon.

 

Whilst there were several gas shows and indications of condensate/light oil whilst drilling the 410 sand package, a preliminary assessment of well log data and reservoir fluid samples taken, indicate that the 410 sand package is largely water saturated at the IM-6 location.

 

The secondary objective of the well was to explore two additional potential reservoir formations above and below the 410 package: the shallower 510 sandstone formation and the deeper 310 sandstone formation.

 

Several low-level gas shows were seen when drilling the 510 sand section. However, the well logging tool data and reservoir fluid samples collected indicate that the 510 sand body is water bearing.

 

The gas logging data collected in the 310 intra-Isongo showed gas shows during drilling. Well log data and reservoir fluid samples taken provide a good indication that, the Middle Isongo sections in particular, are of interest as the two horizons both show condensate rich reservoir fluid samples.

 

Following preliminary analysis of the well data, the decision has been made not to test the sand packages drilled at the IM-6 location. The well is currently being made ready to be plugged and abandoned.

 

On-going Appraisal Programme

 

Based on the assessment of the 510 sand package, the Partners have decided not to proceed with the IM-7 well location as this was intended to test any discovery in the 510 sandstone formation. Instead, the drilling rig will be relocated to the backup location, IE-4, which lies to the east of the IM-6 well and northwest of the previously drilled IE-3 well. The IE-4 well will target a previously undrilled sand package "Drillbit" of Intra-Isongo origin, which is believed to be analogous to the 410 sand package at the IM-5 location. Any discovery in this appraisal well, could prove up or derisk a further 0.2 to 0.6 tcf of resources (Drillbit, Bolt, Crowbar sites).

Eli Chahin, Chief Executive Officer of Bowleven plc, commented:

"Whilst it is disappointing that the IM-6 well did not make an additional commercial discovery, the data collected is vital in further defining the existing 410 intra-Isongo discovery. Specifically, after further analysis and reservoir engineering and modelling, we expect to be able to accurately delineate the location of the gas/water contact within the 410-wet gas reservoir and firm-up the reservoir volume.

We now look forward to drilling the prospective IE-4 well which offers the potential to provide an increase to our discovered resource volumes, and derisk several other potential prospects."

IM-6 Well Details

 

The well reached a total depth of 3,550 meters. The original planned target depth was designated as being 50 meters of shale below the lowest sand horizon in the 310 Intra-Isongo sand package. This was estimated pre-spud at 3,340 meters. The lowest sand horizon within the 310 package was slightly deeper than expected and a revised target depth was set at 3,375 metres. However, at 3,370 meters a previously undetected sand body was encountered associated with a significant gas show resulting in a pressure spike to higher than well design tolerance.

 

To safeguard the well against any unforeseen well control event(s) resulting from the high pressure, the reservoir interval was plugged with cement and side-tracked to enable the reservoir sections to be examined for logging and testing purposes in a safe drilling environment. In light of the interesting gas show detected at 3,370 metres, the Partners agreed to deepen the target well depth to 3,550 metres to facilitate collecting data from the 3,370 metre sand horizon, whilst also investigating another prospect in the upper section of the Middle Isongo sands. As both the pressure and temperature at this depth are higher than the well was originally designed for, the downhole design was reconfigured accordingly.

 

Investor Conference Call:

 

Management will host a conference call for investors at 9.00am (BST) on Tuesday 21 August 2018. Dial in details for the call are shown below and participants should request to join the "Bowleven plc Investor Call".

 

Dial in number: +44 (0)330 336 9105

 

 

Mr Tom Gunningham CEng MEI has reviewed the information contained in this announcement. Mr Tom Gunningham, Reservoir Engineering Consultant for the Group, is a Chartered Petroleum Engineer with over 29 years of experience in the oil and gas industry and is a member of the Energy Institute and Society of Petroleum Evaluation Engineers.

 

 

ENQUIRIES

For further information, please contact:

Bowleven plc

Eli Chahin, Chief Executive

00 44 131 524 5678

Celicourt Communications Ltd

Mark Antelme

00 44 207 520 9261

Henry Lerwill

Stockdale Securities Ltd (NOMAD and Broker)

Robert Finlay

00 44 207 601 6100

Antonio Bossi

David Coaten

 

 

Glossary

 

tcf

trillion cubic feet (of gas)

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUVOVRWNAWAAR
Date   Source Headline
21st Nov 20133:32 pmRNSDirector/PDMR Shareholding
20th Nov 20139:54 amRNSDirector/PDMR Shareholding
19th Nov 20132:35 pmRNSHolding(s) in Company
18th Nov 20133:06 pmRNSHolding(s) in Company
18th Nov 20132:57 pmRNSDirector/PDMR Shareholding
13th Nov 201310:04 amRNSDirector/PDMR Shareholding
13th Nov 20139:07 amRNSResult of Issue of Equity
13th Nov 20137:09 amRNSIssue of Equity
13th Nov 20137:00 amRNSPreliminary Results 2013
8th Nov 20135:29 pmRNSHolding(s) in Company
1st Nov 20137:00 amRNSHolding(s) in Company
12th Sep 20135:07 pmRNSDirector/PDMR Shareholding
10th Sep 20131:06 pmRNSHolding(s) in Company
4th Sep 201312:34 pmRNSHolding(s) in Company
2nd Sep 20137:00 amRNSBlocklisting Interim Review
12th Aug 20133:33 pmRNSHolding(s) in Company
6th Aug 201311:48 amRNSHolding(s) in Company
23rd Jul 20137:00 amRNSEtinde Exploitation Authorisation Application
4th Jul 20137:00 amRNSFirst Oil Investment in Bowleven New Ventures
28th Jun 20131:02 pmRNSGrant of LTIP Award
26th Jun 20131:42 pmRNSExecutive Director Appointment
30th May 20135:02 pmRNSDirector Announcement
23rd May 20137:00 amRNSGroup Operations Update
22nd May 20131:49 pmRNSIM-5 - SNH Press Release
20th May 20133:15 pmRNSHolding(s) in Company
22nd Apr 20135:40 pmRNSHolding(s) in Company
19th Apr 20137:00 amRNSIM-5 testing update
15th Apr 20139:47 amRNSHolding(s) in Company
2nd Apr 20137:00 amRNSIM-5 preliminary testing update
28th Mar 20133:11 pmRNSTotal Voting Rights
21st Mar 20134:27 pmRNSHolding(s) in Company
20th Mar 20137:00 amRNSInterim Results Announcement
6th Mar 20137:00 amRNSIM-5 Preliminary Volumetrics Update
1st Mar 20137:00 amRNSBlocklisting Interim Review
25th Feb 20132:40 pmRNSHolding(s) in Company
22nd Feb 20134:43 pmRNSHolding(s) in Company
5th Feb 201311:37 amRNSHolding(s) in Company
30th Jan 201311:10 amRNSIM-5 Drilling Update
28th Jan 20136:05 pmRNSHolding(s) in Company
28th Jan 20133:20 pmRNSCorrection - Holding(s) in Company
16th Jan 20132:49 pmRNSHolding(s) in Company
15th Jan 20135:35 pmRNSHolding(s) in Company
14th Jan 20134:08 pmRNSHolding(s) in Company
14th Jan 20133:56 pmRNSHolding(s) in Company
20th Dec 20128:22 amRNSHolding(s) in Company
12th Dec 20121:06 pmRNSRESULT OF GENERAL MEETING
12th Dec 20121:05 pmRNSResult of AGM
11th Dec 20128:24 amRNSConditional vesting of 2009 LTIP Awards
26th Nov 20127:00 amRNSEEAA submitted
19th Nov 20125:00 pmRNSPosting of Annual Report and Accounts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.