Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.00 (0.00%)
Bid:
6.00
Ask:
8.00
Spread: 2.00 (33.333%)
Market Cap: £4.53m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Graphite Anode Materials Plant update

10 Jun 2024 07:00

RNS Number : 6968R
Beowulf Mining PLC
10 June 2024
 

 

 

10 June 2024

 

Beowulf Mining Plc

 

("Beowulf" or the "Company")

 

Graphite Anode Materials Plant update

 

 Beowulf (AIM: BEM; Spotlight: BEO), and its wholly owned Finnish subsidiary Grafintec Oy ("Grafintec"), are pleased to provide an update on test-work for the Graphite Anode Materials Plant ("GAMP").

 

 

Highlights

 

· Battery grade graphite produced from ongoing graphite anode materials test-work

· GAMP process flow-sheet under development by Grafintec and Dorfner Anzaplan GmbH ("Anzaplan")

· Optimisation work results in significant reduction in reagent and energy consumption

· Test-work results will serve as input parameters for the ongoing Pre-Feasibility Study ("PFS") and Environmental Impact Assessment ("EIA") for the GAMP

 

 

Ed Bowie, Chief Executive Officer of Beowulf, commented:

 

"Test-work is advancing at pace with results exceeding our expectations. We have produced an extremely high-grade anode material and, at the same time, managed to reduce the consumption of both energy and reagents in the process. These results bode very well for the forthcoming PFS and EIA."

 

 

Rasmus Blomqvist, Managing Director of Grafintec, commented:

 

"I am very pleased with the results from the latest test-work. The tests have demonstrated a robust process which can produce a graphite anode product with a purity of 99.99%, exceeding the typical industry requirements of 99.95%, at the same time as significantly reducing the process consumables. The optimised process will result in lower operating costs and produce less waste, and will therefore have a positive impact on the ongoing PFS and EIA.

 

"With a number of ongoing work-streams we look forward to updating the market in the coming months."

 

 

GAMP Testwork Update

 

Grafintec has completed a series of bench-scale tests on graphite concentrate to produce graphite anode material suitable for application in Lithium-Ion Batteries ("LIB"). The aim of the tests has been to optimise the GAMP process flow-sheet developed together with Grafintec's engineering partner Anzaplan.

 

GAMP Process

 

The GAMP Process is a three-step process where imported Mined Graphite Concentrate will be used to produce Coated Spherical Graphite ("CSPG") (See Figure 1). The process involves the following main steps:

 

· Spheronisation - the spheronisation process produces rounded graphite particles using a combined mechanical spheronisation and classification unit.

· Purification - the purification process uses a hydrometallurgical process flow-sheet developed by Grafintec in partnership with Anzaplan to produce high purity spheronised graphite ("SG") product.

· Coating - the purified SG is blended with petroleum needle coke and heated in a furnace to form a thin layer of carbon material around the purified SG forming CSPG.

 

The CSPG is then sold to Anode- and/or Battery manufacturers.

 

 

 

Figure 1: GAMP Process

 

Focus of test-work

 

The focus of this phase of test-work included the following:

 

· Spheronisation: to produce a high-yield of SG with high tap density.

· Purification: to produce a battery-grade product with a minimum 99.95 per cent. graphitic carbon ("Cg") content.

· Optimisation: to reduce reagent and energy consumption in the purification process and thus reduce the operating costs and the potential environmental impact of the process.

· Scalability: to develop a robust process that can be replicated for up-scaled test-work, provide input parameters for the PFS and EIA and ultimately to be developed on an industrial scale.

 

Spheronisation test results

 

The targets for the spheronisation tests were to produce two products, a medium SG product of 18 microns ("SG18") with a minimum yield of 50 weight ("wt.") per cent. and a fine SG product of 8 microns ("SG8") with a minimum yield of 10 wt. per cent. The SG18 fraction is the more important product and is typical for use in batteries for Electric Vehicles, whereas the SG8 product is more typically used for Hybrid Vehicle and Consumer Electronics battery applications.

 

Tap density is related to the shape and roundness of the particles and is a key parameter for the performance of graphite material in battery applications. The test-work successfully produced SG18 with a tap density of 0.95 grammes per centimetre cubed ("g/cm3") (target >0.95 g/cm3) and SG8 of 0.84 g/cm3 (target >0.83 g/cm3).

 

The yield of the process reflects the percentage of product produced from feed material and is therefore a measure of the overall efficiency. While the yield of the SG18 was 48.3 wt. per cent and slightly below the target of 50 wt. per cent., the target for the SG8 (10 wt. per cent) was exceeded with a yield of 12.7 wt. per cent. Therefore, the combined yield for the two products of 61 wt. per cent exceeded the combined target of 60 wt. per cent.

 

The SG18 product was used as feed for the subsequent purification test-work.

 

Purification test results

 

The purification process aims to increase the Cg content of the SG from approximately 95 per cent Cg to a minimum of 99.95 per cent Cg which is the typical industry requirement for battery-grade graphite. The bench-scale tests successfully produced a purified SG product of 99.99 per cent Cg well exceeding the battery-grade target.

 

Optimisation work on the process also reduced the reagent and energy consumption significantly, compared to previous test-work undertaken by Grafintec and Anzaplan, which will have a positive impact on the operating costs, production of waste material and therefore potential environment impacts of the process. The main chemicals sodium hydroxide and sulphuric acid used in the process were reduced by 25 per cent. and 82.5 per cent. respectively. In addition, the sodium hydroxide baking temperature was reduced by 33.3 per cent. from previous test-work. The combined impact of the reduced temperature and reagents results in an estimated 45 per cent. reduction in operating costs.

 

 

Ongoing Work and Next Steps

 

Grafintec and Anzaplan are currently producing additional purified SG based on the optimised process for Coating to produce CSPG. The Coating process is the final stage in the production of graphite anode materials and is carried out to further improve the electro-chemical and physical performance of the anode material.

 

A variety of workstreams are also ongoing to test the recyclability of the reagents used in the process to further decrease the overall reagent consumption and thus improve project returns.

 

The results from completed and ongoing workstreams are important input parameters for the ongoing PFS and EIA workstreams.

 

 

Enquiries:

Beowulf Mining plc

Ed Bowie, Chief Executive Officer ed.bowie@beowulfmining.com

 

SP Angel

(Nominated Adviser & Joint Broker)

Ewan Leggat / Stuart Gledhill / Adam Cowl Tel: +44 (0) 20 3470 0470

 

Alternative Resource Capital

(Joint Broker)

Alex Wood Tel: +44 (0) 20 7186 9004

 

BlytheRay

Tim Blythe / Megan Ray Tel: +44 (0) 20 7138 3204

 

 

 

Cautionary Statement

 

Statements and assumptions made in this document with respect to the Company's current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of Beowulf. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to , (i) changes in the economic, regulatory and political environments in the countries where Beowulf operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) Beowulf's continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) metal prices, particularly as regards iron ore. In the light of the many risks and uncertainties surrounding any mineral project at an early stage of its development, the actual results could differ materially from those presented and forecast in this document. Beowulf assumes no unconditional obligation to immediately update any such statements and/or forecast.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDVDLFBZQLXBBF
Date   Source Headline
5th Jun 20187:00 amRNSNotice of AGM and Availability of Annual Report
29th May 20187:00 amRNSUnaudited Interim Statement and Management Update
16th May 20187:00 amRNSSubscription to raise £1.5 million
14th May 20187:00 amRNSAUDITED FINANCIAL RESULTS FOR THE YEAR END
4th May 20187:00 amRNSAitolampi Assay Results
2nd May 20187:00 amRNSAitolampi Graphite Project
25th Apr 20187:00 amRNSFinnish Cooperation Network and Project Funding
18th Apr 20187:00 amRNSNordic Mining Investment Conference, 17 April 2018
17th Apr 20187:00 amRNSGraphite Collaboration Agreement
12th Apr 20187:00 amRNSKallak North Exploitation Concession Update
23rd Mar 20187:00 amRNSAitolampi Drilling Results Update
6th Mar 20184:20 pmRNSKallak North Exploitation Concession Update
5th Mar 20187:00 amRNSKallak North Exploitation Concession Update
2nd Mar 20184:00 pmRNSReplacement Unaudited Prelim Financial Results
28th Feb 20187:00 amRNSUnaudited Preliminary Financial Results
22nd Feb 20181:55 pmRNSIssue of Shares/PDMR Dealing
16th Feb 20187:00 amRNSAitolampi Drilling Now Underway
12th Feb 20189:00 amRNS121 Mining Conference, CEO Interview
12th Feb 20187:00 amRNSKallak North Exploitation Concession Update
12th Feb 20187:00 amRNS121 Mining Conference, Corporate Presentation
2nd Feb 20187:00 amRNSShare Information
1st Feb 20187:00 amRNSKallak North Exploitation Concession Update
31st Jan 20187:00 amRNSÅtvidaberg Exploration Update
30th Jan 20183:45 pmRNSKallak North Exploitation Concession Update
30th Jan 20187:00 amRNSAitolampi Demonstrate Significant Market Potential
20th Dec 201711:30 amRNSKallak North Exploitation Concession Update
4th Dec 20177:00 amRNSKallak North Exploitation Concession Update
30th Nov 20176:12 pmRNSKallak North Exploitation Concession Update
29th Nov 20177:00 amRNSUnaudited Interim Financial Results
14th Nov 20177:00 amRNSKallak North Exploitation Concession Update
13th Nov 20177:00 amRNSShare Information
30th Oct 20177:00 amRNSSwedish Chairman Appointment
17th Oct 20175:10 pmRNSSales of Shares
10th Oct 201711:40 amRNSExercise of Options/PDMR Dealing
10th Oct 20177:00 amRNSKallak North Exploitation Concession Update
9th Oct 20177:00 amRNSKallak Scoping Study Contract Awarded to SRK
2nd Oct 20177:00 amRNSAitolampi Delivers High Grade Concentrate Results
21st Sep 20179:00 amRNSStudy of Kallak's Potential Economic Benefits
13th Sep 20173:15 pmRNSCEO Interview
1st Sep 20177:00 amRNSChairman Retirement
29th Aug 20177:00 amRNSUnaudited Interim Results and Management Update
21st Aug 20177:00 amRNSParkijaure Exploration Update
21st Jul 20177:00 amRNSStudy of Kallak's Potential Economic Benefits
20th Jul 20177:00 amRNSShare Information
12th Jul 20179:00 amRNSBRR Interview
10th Jul 20177:00 amRNSAlmedalen/Kallak North Exploitation Concession
30th Jun 20177:00 amRNSKallak Exploitation Concession Update
29th Jun 201712:45 pmRNSResult of Annual General Meeting
19th Jun 20177:00 amRNSKallak Exploitation Concession Update
16th Jun 20177:00 amRNSAppointment of Stakeholder Communications Officer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.