Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.50
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

AGM Statement / Retirement of Director

5 Sep 2019 11:00

ANGLESEY MINING PLC - AGM Statement / Retirement of Director

ANGLESEY MINING PLC - AGM Statement / Retirement of Director

PR Newswire

London, September 5

- Significant progress with QME optimisation studies

- Retirement of Director

September 5, 2019: At the Annual General Meeting held in London today, the Chairman, John Kearney, presented an update on the activities of the Company,

As previously reported to shareholders, in 2018 Anglesey entered into a Project Development and Cooperation Agreement with QME Mining Technical Services, a division of QME Ltd, to carry out an agreed programme of design, engineering and optimisation studies relating to the future development of the Parys Mountain zinc, copper lead project, located on the island of Anglesey in Wales.

The primary objective of this exercise is to determine the optimum production plan for the future Parys Mountain mine and we are very pleased to be able to today report that significant progress has been made with very encouraging results.

QME review and optimisation

As described in our recent Annual Report, QME completed detailed reviews of mine development capital and mine operating costs of the basic mine plan, using their extensive experience in mine development in Ireland and throughout Europe, and identified the potential for improvements in the development plans contained in the 2017 Scoping Study.

QME developed a model to estimate the mine operating costs for the life of mine. As indicated in the Annual Report QME has confirmed an expected operating cost of $US48 per tonne. This figure is generally in line with the projected operating costs estimated by Micon International and Fairport Engineering in the 2017 Scoping Study, although, as might be expected, some specific cost items were higher and some lower.

The QME review work suggests support for the application of a lower cut-off for mine planning purposes than used in the 2017 Scoping Study.

In 2012 Micon produced a detailed Resource Estimate for the Parys Mountain property and used a range of cut-off grades to produce a matching range of resources, including a total Indicated Resource of 6.97 million tonnes at $0 cut-off. At the time a cut-off of $US80 per tonne was used for resource reporting purposes. This resulted in a published indicated resource across the White Rock and Engine zone ore bodies of 2.1 million tonnes and a further inferred resource in the same ore bodies of 0.65 million tonnes.

In the 2017 Scoping Study Micon used the same resource base. This study utilised a cut-off of $60 per tonne and applied mine planning, dilution and recovery criteria which generated a mineable tonnage of 2.1 million tonnes, which as a coincidence, was very similar to the 2012 resource tonnage calculated at a cut-off of $80 per tonne.

Higher tonnage available for mining

Using the same geological data set as used by Micon but applying a cut off of $US48 per tonne in accordance with the forecast operating costs as noted above, QME has now estimated that a larger tonnage of material could be available for mining.

The QME work suggests that at the production cut-off of $48 per tonne, a global 6.9 million tonnes would be available within Parys Mountain’s White Rock and Engine Zones for consideration in a detailed life-of-mine schedule and associated financial analysis and to be incorporated into an updated Scoping Study or Feasibility Study.

This 6.9 million global tonnes is substantially higher than the mineable tonnage of 2.1 million tonnes, used in the 2017 Scoping Study for mine planning and financial modelling. It is important to note that QME made no changes to the underlying resource estimates which were calculated by Micon in 2012.

Applying a 10% dilution and 98% recovery, would result in some 7.3 million tonnes being available for conversion into 'potentially mineable tonnage' within the current global resource in all categories.

As a further refinement, QME also looked at mining criteria and developing potential stoping blocks within this 7.3 million 'potentially mineable tonnage' and in doing so eliminated some material not located in economically mineable locations. Based on these assumptions approximately 5.25 million tonnes in situ would fall within these designed stoping blocks.

Longer potential minelife or higher production rate

Using this updated 2019 block model, there is an opportunity to develop a new 2019 mineable block model by re-defining the mining shapes and the stoping plan, followed by a new development plan and schedule.

If a mining plan was developed using this lower cut-off grade, then at a constant 1,000 tonnes per day mill throughput rate as used in the 2017 Scoping Study, the project life would be significantly extended from the initial eight years indicated in the Scoping Study to approximately 18-year mine life. 

However, it does have to be noted that by reducing the cut-off, the grade of material that would be delivered to the mill would be lower overall than that used in the 2017 scoping study. 

The economic trade-off between a longer mine life and reduced head-grade will need to be further studied to determine what, if any, would be the net financial benefit. It will then likely require further studies to determine if there is an ‘optimum’ cut-off grade that maximises the financial returns.

In addition, this new 2019 “potentially mineable tonnage”, would justify and support an increase in the throughput rate and it should also be possible to increase the effective mining rate, up to say 500,000 tonnes per year, which would improve front-end revenue and cash flow, although at a higher capital cost, and would result in a mine life of approximately 10 years.

Summary of QME project improvements

The Agreement with QME has seen the development of a substantial amount of work on mine planning and design and project optimisation on the Parys Mountain project at no cost to Anglesey and at no dilution to Anglesey’s current shareholders.

The QME studies have indicated that the project can be improved if the potential mineable tonnage can be increased by using a lower cut-off grade and generating a revised mine development plan. It should be emphasised that this optimisation work will have to be supported by an updated scoping study or pre-feasibility study.

In the meantime, QME has suggested that additional studies are carried out and this second stage of the process remains ongoing.

These additional studies will also look at utilising some of the inferred resources into the mining plan, continuing review to determine theoptimum cut-off grade, and the use of updated metal prices. While the inclusion of inferred resources does not meet the strict criteria for feasibility studies used by banks for loan evaluation, given the detailed geological knowledge of Parys Mountain now available it is useful to include some of this inferred resource for comparative financial modelling.

This second stage of the QME exercise is ongoing with completion scheduled for the end of 2019. Subject to financing being available, this work would then form the basis for commissioning an updated scoping or preliminary feasibility study.

Retirement of Director

David Lean, who has been a director of the Company for almost eighteen years, has indicated that he wishes to retire from the Company at the 2019 Annual General Meeting and will not stand for re-election. The board wish to thank him for his sound advice and tireless efforts during all this period

For further information, please contact:Bill Hooley, Chief Executive +44 (0)7785-572517Danesh Varma, Finance Director +44 (0)7740-932766

Date   Source Headline
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study
1st Aug 201210:44 amPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.