Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 430.50
Bid: 430.50
Ask: 432.50
Change: 1.50 (0.35%)
Spread: 2.00 (0.465%)
Open: 425.50
High: 438.00
Low: 424.00
Prev. Close: 429.00
ATYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Updated Reserves and Resources Statement

14 Jul 2016 07:00

RNS Number : 1263E
Atalaya Mining PLC
14 July 2016
 

14 July 2016

Atalaya Mining plc ("Atalaya" or the "Company")

(AIM: ATYM, TSX: AYM)

Updated Reserves and Resources Statement

Atalaya, the European mining and development company, announces an updated Mineral Reserves and Resources estimate for the Riotinto Copper Project ("Proyecto Riotinto") as at 30 June 2016. These estimates, outlined below, have been compiled in accordance with the guidelines set out in Canadian National Instrument 43-101. 

Highlights

· Total open pit Mineral Reserves estimate of 153 million tonnes averaging 0.45% Cu using variable, declining cut-off grades for 681,000 tonnes of contained Cu metal, (previous total 606,000 tonnes), representing over a 12% increase. 

· Total open pit Measured and Indicated Mineral Resources estimate of 193 million tonnes averaging 0.43% Cu and an additional Inferred open pit Mineral Resource estimate of 23 million tonnes averaging 0.48% , both calculated using a 0.20% Cu cut-off grade.

Total Mineral Reserves for Proyecto Riotinto

June 2016 Estimate

Proven

Probable

Mineral Reserve

Tonnes

% Cu

Tonnes

% Cu

Tonnes

% Cu

Contained Cu t

Waste:Ore

(millions)

(millions)

(millions)

ratio

New Reserve

 78

0.45 

 74

 0.44

153

0.45

681,000

1.9

Previous Reserve

39

0.38

84

0.54

123

0.49

606,000

1.1

Totals may not equal the sum of the components due to rounding adjustments

 

· Reserve estimates are based on the mined surface of the open pit as at 30 April 2016 and a deposit model dated 3 May 2016;

· The pit design and internal cut-off grade are based on a long term copper price of US$2.60/lb.;

· Declining cut-off grades were applied to estimate Mineral Reserves. Cut-off grades are initially 0.25% Cu, declining to an internal cut-off of 0.16% Cu after 14 years, and remaining at 0.16% Cu until completion of open pit mining. The mine life is presently estimated at 16.5 years;

· Mineral Reserves are included in the estimates of Mineral Resources;

· Long term US$/Euro exchange rate of 1.12;

· Ultimate open pit design has a waste to ore ratio of 1.9:1;

· Underground orebodies do not form part of the open pit reserves estimate.

 

Total Mineral Resources for Proyecto Riotinto at variable cut-off grades

% Cu Cutoff 

Measured

Indicated

M+I

Inferred

M+I+I

Tonnes (million)

%Cu

Tonnes (million)

%Cu

Tonnes (million)

%Cu

Tonnes (million)

%Cu

Tonnes (million)

%Cu

0.15

115

0.374

122

0.384

237

0.379

25

0.450

262

0.386

0.20

90

0.430

103

0.424

193

0.427

23

0.484

216

0.433

0.25

73

0.479

87

0.459

160

0.468

20

0.517

180

0.474

0.30

61

0.519

73

0.497

134

0.507

18

0.547

152

0.512

0.35

50

0.562

59

0.537

109

0.549

15

0.584

124

0.553

0.40

40

0.610

45

0.587

85

0.598

12

0.635

97

0.602

0.45

32

0.658

34

0.638

66

0.648

10

0.690

76

0.653

0.50

24

0.712

25

0.695

49

0.704

8

0.741

57

0.709

Totals may not equal the sum of the components due to rounding adjustments

 

· The effective date of the mineral resource model is 03 May 2016. The Mineral Resource estimate is summarised using the mined surface of the open pit as at 30 April 2016;

· The Mineral Resource estimate uses all available assays through the end of March 2016 and includes 171,987 metres of historical and new drilling with 86,052 sample intervals;

· Mineral Resources are reported inclusive of Mineral Reserves;

· The resources are estimates of recoverable tonnes and grades using Inverse Distance to various Power factors;

· Resources are pit-constrained at US$3.20/lb Cu;

· The resource model extends from 4174900mN to 4176500mN, 711900mE to 714750mE and to a maximum depth of 0mRL.

Alberto Lavandeira, CEO commented:

"We have completed our infill drilling programme, assays and updating of the block model. These results have provided us with greatly improved confidence in the overall distribution of mineralization and a much better understanding of the potential impurity levels which will enhance the efficiency of our mine planning."

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

 

Contacts:

Atalaya Mining plc

Roger Davey / Alberto Lavandeira

+34 959 59 28 50

Canaccord Genuity (NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / Martin Davison

+44 20 7523 8000

BMO Capital Markets (Joint Broker)

Jeffrey Couch/Neil Haycock/Tom Rider

+44 20 7236 1010

 

 

 

QUALIFIED PERSON AND QUALITY CONTROL

Information of a scientific or technical nature in this document was prepared under the supervision of Alan C. Noble P.E., an independent Qualified Person under the Canadian National Instrument 43-101. 

The open pit mineral resource was prepared by Alan C. Noble, P.E. The open pit mineral reserve was prepared by William L. Rose, P.E., an independent Qualified Person working under the direction of Mr. Noble.

Mr. Noble has verified the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in this announcement in accordance with standards appropriate to their qualifications.

An updated NI 43-101 resource and reserve report will be completed and filed in due course on SEDAR at www.sedar.com and on the Company's website.

In relation to historical resources and reserves, refer to the technical report entitled "NI 43-101 Technical Report on EMED's Rio Tinto Copper Project, Huelva Province, Spain " dated February 2013 and filed on SEDAR at www.sedar.com, for further discussion of the extent to which the estimate of mineral resources/reserves may be materially affected by any known environmental, permitting, legal, title, taxation, socio-political, or other relevant issues.

GLOSSARY of TECHNICAL TERMS

Cu

Copper

Cut-off grade

The minimum grade at which mineralized material can be economically mined and processed for the purpose of the reserve calculation

Inferred Mineral Resource

That part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

Indicated Mineral Resource

That part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.

lb

Pound

Inverse distance

Statistical interpolation method

Measured Mineral Resource

That part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve

Mineral Reserve

The economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. Mineral Reserves are sub-divided in order of increasing confidence into Probable Mineral Reserves and Proven Mineral Reserves. A Probable Mineral Reserve has a lower level of confidence than a Proven Mineral Reserve.

Mineral Resource

A concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

RL

Relative level or elevation

 The above definitions of "Mineral Resource", "Inferred Mineral Resource", "Indicated Mineral Resource", and "Measured Mineral Resource" conform to CIM Definition Standards - For Mineral Resources and Mineral Reserves, as prepared by the CIM Standing Committee on Reserve Definitions, and adopted by CIM Council on 10 May 2014, and as required by NI 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUBPMUPQGQW
Date   Source Headline
19th Jan 20117:00 amRNSDrilling Programs For Rio Tinto Copper Mine
17th Jan 20117:00 amRNSFavourable Department of Culture & Heritage Ruling
14th Jan 20117:00 amRNSSignificant Shareholding and Exercise of Warrants
11th Jan 20112:38 pmRNSOver-Allotment Option
23rd Dec 20107:00 amRNSIssue of Share Options
22nd Dec 20107:00 amRNSEvaluation of Regua Tungsten Deposit Commences
20th Dec 20101:42 pmRNSCloses $32.5 million fundraising
15th Dec 20107:00 amRNSProgress at Proyecto Rio Tinto
14th Dec 20107:00 amRNSFiles Final Prospectus & Announces Terms of Offer
6th Dec 20107:00 amRNSIssue of Shares
22nd Nov 20109:30 amRNSResult Of EGM
22nd Nov 20107:00 amRNSUpdate Regarding EGM
5th Nov 20107:00 amRNSDespatch of EGM Circular
21st Oct 20107:00 amRNSFiles Preliminary Prospectus in Canada
21st Oct 20107:00 amRNSFiles Preliminary Prospectus in Canada
11th Oct 20109:00 amRNSAppointment of Joint AIM Broker
6th Oct 20107:00 amRNSQuarterly Report
20th Sep 20107:00 amRNSInterim Results
20th Aug 20107:00 amRNSIssue of Shares
18th Aug 20107:00 amRNSPRT Permitting Progress
30th Jul 20107:00 amRNSQuarterly Report
15th Jul 20107:00 amRNSExploration drilling commences in central Slovakia
5th Jul 20107:00 amRNSUpdate
28th Jun 20107:00 amRNSBiely Vrch update
15th Jun 201011:30 amRNSResult of AGM
8th Jun 20107:00 amRNSProyecto Rio Tinto Update
17th May 20107:00 amRNSProyecto Rio Tinto Update
12th May 20107:00 amRNSFinal Results
10th May 20109:00 amRNSIssue of Equity
4th May 20107:00 amRNSResult of EGM
23rd Apr 20107:00 amRNSBoard Appointment
22nd Apr 20107:00 amRNSElectricity connection to Proyecto De Rio Tinto
19th Apr 20107:00 amRNSQuarterly Report
15th Apr 20107:00 amRNSEMED Mining Raises ?8.775 Million in Placing
24th Mar 20102:18 pmRNSProyecto Rio Tinto Update
18th Mar 20109:09 amRNSProposed Dual-listing on the ASX
3rd Mar 20107:00 amRNSBiely Vrch and Slovakia gold exploration update
24th Feb 20102:30 pmRNSIssue of shares
16th Feb 20107:00 amRNSProyecto Rio Tinto Update
10th Feb 20107:00 amRNSProyecto Rio Tinto Update
2nd Feb 20107:00 amRNSProyecto Rio Tinto Update
1st Feb 20107:00 amRNSQuarterly Report
25th Jan 20109:12 amRNSResult of EGM
14th Jan 20107:00 amRNSUpdate of site activities at Proyecto Rio Tinto
6th Jan 20103:45 pmRNSEGM Circular
24th Dec 20099:07 amRNSIssue of Share Options
23rd Dec 20099:09 amRNSResult of EGM
17th Dec 20097:00 amRNSRefined permit roadmap for Rio Tinto mine start-up
4th Dec 20093:33 pmRNS?3.27 million placing
1st Dec 200912:11 pmRNSManaging Director's Presentation - Mines and Money

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.