10 Dec 2009 07:01
ο»Ώ
10thΒ DecemberΒ 2009
Mwana Africa PLC
Update onΒ Phase 2 diamond core drilling program at Kodo Main, Zani-Kodo Project, DRC
Mwana AfricaΒ PLCΒ ("Mwana" or the "Company") is pleased to announce the completion ofΒ aΒ nine-hole,Β 2,550m diamondΒ core drilling programΒ at theΒ Kodo MainΒ section of itsΒ Zani-Kodo gold prospect in the Democratic Republic of Congo ("DRC"). JORC compliant indicated resources of 190,684 oz of gold and inferred resources of 261,192 oz of goldΒ wereΒ announcedΒ for this areaΒ on the 2ndΒ September 2009.
The recently completed drill programΒ along a 250m strike lengthΒ was designed to increase the inferredΒ mineralΒ resourceΒ on the down-dip portion of the previously drilledΒ mineralΒ resource. This program was completed on 1stΒ December 2009, with all 9 holes intersecting mineralisation as expected. Assay resultsΒ for 4 of the 9 holes have been received, and are reported in Table 1. Complete assay results will be posted onΒ www.mwanaafrica.com.
Β
|
Hole ID
|
Depth
|
Intersection
|
Β
|
|
KDODD015BEE
|
226-228m
|
2m @ 9.60g/t
|
Β
|
|
Β
|
263-272m
|
9m @ 4.01g/t
|
Inc. 3m @ 10.25g/t
|
|
Β
|
281-285m
|
4m @ 4.20g/t
|
Β
|
|
KDODD018AE
|
246-265m
|
19m @ 5.74g/t
|
Inc. 10m @ 9.94g/t
|
|
KDODD027EE
|
214-219m
|
15m @ 3.09g/t
|
Β
|
|
KDODD030EE
|
217-232m
|
15m @ 4.80g/t
|
Β
|
Β
Intersections are measured as down-hole widths. The orebody dips between 50 and 70° to ENE. Holes were drilled 80° to WSW.
Please click on the link below to view Figures 1-2.
http://www.rns-pdf.londonstockexchange.com/rns/8846D_-2009-12-9.pdf
Figure 1 shows a perspective view of the targeted mineralisation, outlining the area drilled as well as the area for which the assays have been reported. The assay results received to date indicateΒ not onlyΒ that the mineralisation continuesΒ atΒ depth, but also thatΒ the dipΒ appears to beΒ reducingΒ andΒ mineralisationΒ wideningΒ with depth (Figure 2). Figure 2 also illustrates the down-dip continuity of the drilled portion of the orebody.
OnceΒ all of the assay results have been received,Β an updated resource will be calculated, and it is anticipated that this will be reported early in the New Year.
Enquiries:
Mwana Africa PLC Tel: 020 7654 5580
Oliver Baring, Executive Chairman
Donald McAlister,Β Finance DirectorΒ
Β
Canaccord Adams Limited Tel: 020 7050 6500
Mike JonesΒ / Guy Blakeney
Β
Merlin Tel:Β 020 7726 8400
Tom Randell /Β Anca Spiridon
References to dollars or "$" refer to US dollars unless otherwise stated.
Au gold
km kilometres
JORC the Joint Ore Reserves Committee of Australia
CIM Canadian Institute of Mining, Metallurgy and Petroleum
t tonne(s)
g gram(s)
N.I.43-101 National Instrument 43-101 Standards of Disclosure for Mineral Projects, Canada
Mineral resourceΒ a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.
Indicated resourceΒ part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.
Inferred resourceΒ part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.
This press release includes 'forward-looking statements'. Words such as 'anticipates', 'expects', 'intends', 'plans', 'forecasts', 'projects', 'budgets', 'believes', 'seeks', 'estimates', 'could', 'might', 'should' and similar expressions identify forward-looking statements. All statements other than statements of historical facts included in this press release, including, without limitation, those regarding Mwana Africa's business strategy and plans and objectives of management for future operations and acquisition opportunities, are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties andΒ other important factors which could cause the actual results, performance or achievements of Mwana Africa or the markets and economies in which Mwana Africa operates to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements, including, without limitation, political, regulatory and economic factors. Factors that would cause actual results or events to differ from current expectations include, among other things, political and regulatory risks and the other risksΒ and hazards associated withΒ mineral exploration, development and production. Mwana Africa believes that the assumptions inherent in the forward-looking statements are reasonable; however, forward looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. Mwana Africa does not assume any responsibility to update any of such forward-looking statements, save as required by relevant law or regulatory authority. This report contains information regarding the results of various exploration activities. Where a mineral resource has not beenΒ defined, it should be noted that the potential quantity and grade is conceptual in nature, there has been insufficient exploration to define a mineral resource and that itΒ is uncertain if further exploration will result in the target being delineated as a mineral resource. Charl du Plessis, Executive Vice President Exploration of Mwana Africa,Β who holds a PhD and is a Member of the AusIMM, is a 'Qualified Person' as defined in the AIM Rules and under NI 43-101, and the exploration and resource developmentΒ information contained in this press releaseΒ has been reviewed byΒ Dr Du Plessis. Mineral resource estimates included herein are presented in accordance with the JORC Code. If presented in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council, the mineral resource and mineral reserve presentation would be materially the same.
Follow the stocks